Centennial, Colorado Building Department 2026: Permits, Inspections & Services

Centennial Building Permits & Inspections: What to Do First

The City of Centennial Building Division handles building permits, plan review, inspections and local contractor licensing for construction work within Centennial, Colorado. Most permit and contractor-license applications are submitted through the City’s online Self-Service Portal.

Quick answer: If you are starting a remodel, addition, new building, deck, reroof, mechanical replacement, electrical work, plumbing work or another regulated project in Centennial, first identify the correct permit type, prepare the required plans and project valuation, and submit through the City’s permit portal. Do not begin permit-required work until the permit has been issued.

Centennial Building Division Contact Information

Item 2026 Information
Official agency City of Centennial Building Division
Services Building permits, plan review, inspections, building-code administration and contractor licensing
Office Centennial Civic Center, 13133 E. Arapahoe Rd., Centennial, CO 80112
Building Division phone 303-754-3321
Email buildingdivision@centennialco.gov
Office hours Monday–Tuesday 8 a.m.–5 p.m.; Wednesday 9 a.m.–5 p.m.; Thursday–Friday 8 a.m.–5 p.m., Mountain Time
Planning & zoning 303-754-3308 · centennialplanning@centennialco.gov
24-hour Citizen Response Center 303-325-8000

The City provides workstations at the Building Division office for applicants who need assistance accessing the online permitting system.

Confirm That Centennial Is the Correct Permitting Authority

Do not choose a building department only from the city name in a postal address. Before applying, confirm that the project is actually within the City of Centennial and identify any separate zoning, fire, utility or right-of-way approvals that may apply.

  1. Open the City’s Property Search tool.
  2. Enter the project address. The City recommends abbreviating street types and directions and avoiding punctuation.
  3. Review available property information such as zoning, water and sanitation districts, fire district and other service areas.
  4. If jurisdiction remains unclear, call the Building Division at 303-754-3321 before submitting or paying fees.
Fire-code work can involve a second authority. Centennial lists the 2021 International Fire Code as enforced by South Metro Fire Rescue. Projects requiring fire-department review or permits may need a separate application to South Metro Fire Rescue in addition to City building approval.

When Do You Need a Building Permit in Centennial?

The City states that a permit is required when work involves constructing, enlarging, altering, repairing, moving or demolishing a building or structure, changing its occupancy, or performing regulated electrical, gas, mechanical or plumbing work.

Project / Work Type Centennial Permit Path
New house or commercial building Residential New or Commercial New permit
Addition, remodel or reconfigured space Residential Alteration or applicable commercial permit
Deck, pergola or patio cover Residential alteration / project-specific building review
Shed, detached garage, carport or accessory structure Temporary or Accessory Structure permit
Residential reroof One-Stop Reroof permit; a mid-roof inspection is required
Like-for-like AC, furnace or water heater One-Stop permit
Electric service replacement without added load One-Stop Electric Service Change
Gas-line repair or replacement One-Stop Gas Line permit
Solar installation Residential or Commercial Renewable Energy permit
Fence A City fence permit is required for new fences and replacements where height, location or material changes
Sign Separate sign permit
Work in public right-of-way Separate Right-of-Way permit may be required

For unusual or borderline work, confirm the permit requirement with the Building Division rather than assuming that a small project is exempt. Zoning, easements, fire requirements and HOA rules can also affect work even when the building-permit question is simple.

How to Apply for a Centennial Building Permit Online

The City’s March 2026 portal instructions provide a clear application workflow. Prepare your files before opening the portal so you do not have to stop midway.

  1. Open the official portal. Go to the Centennial Self-Service Portal and sign in or create an account with a valid email address.
  2. Select Apply. Choose the Apply menu/card. Open the Permits category or search by keyword for your project type.
  3. Select the correct permit. Use the City’s permit classification list if you are unsure whether the project is residential, commercial, one-stop, demolition, renewable energy or another category.
  4. Add the project location. Search by street address, parcel number or partial address and select the correct property record.
  5. Enter project details. Complete the required description, square footage where requested and project valuation. Centennial bases valuation on labor and materials.
  6. Add contacts. Enter the applicant, owner and required contractor contacts. Required fields are marked in the portal.
  7. Complete project-specific questions. Fill in all required information in the “More Info” step.
  8. Upload documents. Attach plans, site plans and other requested files. The City’s online permit page specifies PDF for plans/site plans, and the portal guide identifies PDF as the City’s supported file type.
  9. Sign electronically if required. Enter or draw the applicant signature when the selected application includes the signature step.
  10. Review and submit. Check the property, contacts, attachments and project information before selecting Submit. Save the generated permit/application number.
After submission: Centennial states that processing begins within up to one business day. When an invoice is created, return to Dashboard → My Invoices → Add to Cart. Visa and MasterCard payments currently carry a 3% convenience fee; E-check payments have no convenience fee. The City asks applicants to email the Building Division after online payments, revisions or new attachments are submitted.

What Should You Prepare Before Applying?

Exact requirements vary by permit type, but preparing the following information prevents many avoidable delays:

  • Exact project address and correct parcel/location.
  • Clear description and scope of work.
  • Total project valuation including labor and materials.
  • Owner and applicant contact information.
  • Licensed contractor information where contractors are being used.
  • PDF construction plans and/or site plan for new work, additions and remodels.
  • Structural calculations, engineering or design-professional documents when required by the scope.
  • Energy, mechanical, electrical, plumbing or other trade information applicable to the project.

Residential plan information

For one- and two-family projects, Centennial’s residential checklist calls for project and contact information plus plans appropriate to the work. A site plan may need lot dimensions, existing and proposed structures, building footprint, distances to property lines or other buildings, north arrow and easements. More complex work can require signed and sealed plans from a Colorado registered design professional.

Review Centennial’s residential plan checklist ↗

Centennial Building Permit Review Times in 2026

The City’s published targets apply to the first review of a complete submittal. Incomplete applications or later corrections can extend the overall time.

Permit Type Published Initial Review Target
One-Stop permits 1 business day
Residential alteration, basement finish, deck/pergola/patio cover, demolition, miscellaneous, renewable energy, structural window/door changes 5 business days
Residential addition, accessory structure, pool/spa 10 business days
Residential new construction 15 business days after plan-review fee payment
Commercial reroof, stand-alone demolition, renewable energy 5 business days
Commercial alteration, miscellaneous, tenant improvement, low voltage, temporary/accessory structure 10 business days after plan-review fee payment
Commercial new building or addition 15 business days after plan-review fee payment
New-construction resubmittal/revision 10 business days
Other resubmittals/revisions 5 business days

These are review targets, not guaranteed issuance dates. Final timing can also depend on zoning, fire review, corrections, contractor status and payment of all required fees.

Centennial Building Permit Fees & Construction Use Tax

Centennial’s current published building permit schedule calculates many permit fees from the project’s total valuation. The Building Official determines the valuation used for fee purposes, and the schedule includes construction work, finish work and permanent systems/equipment in that valuation.

Project Valuation Published Building Permit Fee Formula
$1–$500 $23.50
$501–$2,000 $23.50 + $3.05 for each additional $100 or fraction
$2,001–$25,000 $69.25 + $14 for each additional $1,000 or fraction
$25,001–$50,000 $391.25 + $10.10 for each additional $1,000 or fraction
$50,001–$100,000 $643.75 + $7 for each additional $1,000 or fraction
$100,001–$500,000 $993.75 + $5.60 for each additional $1,000 or fraction
$500,001–$1,000,000 $3,233.75 + $4.75 for each additional $1,000 or fraction
Over $1,000,000 $5,608.75 + $3.15 for each additional $1,000 or fraction

Other published building charges

Charge Published Amount
Plan review when required 65% of the building permit fee; separate from the permit fee
Reinspection $55 per hour or applicable jurisdiction cost, whichever is greater
Inspection outside normal hours $125 per hour, two-hour minimum, or applicable jurisdiction cost if greater
Additional plan review $55 per hour, one-half-hour minimum, or applicable jurisdiction cost if greater
Temporary Certificate of Occupancy $800

Residential electrical fee examples

Residential Living Area Published Electrical Fee
Up to 1,000 sq. ft. $100
1,001–1,500 sq. ft. $150
1,501–2,000 sq. ft. $200
Area over 2,000 sq. ft. Add $10 per additional 100 sq. ft. or applicable increment under the schedule

Open the official Centennial permit fee schedule PDF ↗

Building materials use tax

Permit cost is not limited to the base building fee. Centennial also applies construction/building-material use tax. The City’s published guidance states that projects using building materials are subject to 2.5% City use tax plus 0.25% Arapahoe County use tax.

  • For permit projects, the City estimates that 50% of project valuation represents taxable material purchases and collects a use-tax deposit before permit issuance.
  • The general contractor or property owner responsible for the permit is responsible for the tax.
  • The estimated payment must later be reconciled to actual taxable material costs.
  • The City’s guidance states that reconciliation is due within 90 calendar days after the Certificate of Occupancy or final inspection, whichever is later.

Review Centennial’s official building materials use-tax guidance ↗

How to Schedule a Building Inspection

After the permit has been issued and the work reaches a required inspection stage, the permit holder schedules the inspection through the Self-Service Portal.

  1. Sign in to the Self-Service Portal.
  2. Select Dashboard in the top navigation.
  3. Select the blue Active circle.
  4. Open the correct permit number.
  5. Scroll to the Inspections tab.
  6. Select the Action option beside the inspection type you need.
  7. Choose the available inspection date/window and submit the request.
Inspection Rule Centennial Guidance
Next-business-day cutoff Request before 3:30 p.m. on the preceding business day; next-day service is not guaranteed
Morning window Approximately 8:30 a.m.–noon
Afternoon window Approximately noon–4 p.m.
Daily ETA Expected arrival information is available after 8:30 a.m. on the inspection day
Interior residential access A person age 18 or older must be present
Backyard access Leave written permission if the inspector needs to enter the backyard
Residential reroof Mid-roof inspection required
Siding Weather-resistive barrier must be inspected before final inspection
Do not cover work before the required inspection. If you miss a reroof mid-roof inspection, Centennial publishes three possible remedies: qualifying photo documentation with the City’s waiver form, exposing 10% of the shingles for an in-person inspection, or providing a stamped engineer letter.

Centennial Building Codes in Effect in 2026

Centennial’s current Building Division code list and current Municipal Code show the following primary standards for 2026:

Code Area Current Centennial Standard
Building 2021 International Building Code (IBC)
Residential 2021 International Residential Code (IRC)
Existing buildings 2021 International Existing Building Code (IEBC)
Energy 2021 International Energy Conservation Code (IECC), with Centennial amendments
Electrical 2023 National Electrical Code (NEC)
Mechanical 2021 International Mechanical Code (IMC)
Plumbing 2021 International Plumbing Code (IPC)
Fuel gas 2021 International Fuel Gas Code (IFGC)
Swimming pools & spas 2021 International Swimming Pool and Spa Code (ISPSC)
Fire 2021 International Fire Code; enforced by South Metro Fire Rescue
Accessibility reference 2017 ICC A117.1 as referenced by the 2021 IBC
Property maintenance 2024 Centennial Property Maintenance Code
Wildfire resiliency 2025 Colorado Wildfire Resiliency Code, effective in Centennial June 30, 2026
2026 code clarification: An older City FAQ still displays the previous 2018 energy-code and 2020 NEC references. The current Building Division code list and current Municipal Code reflect the newer 2021 IECC and 2023 NEC. Use the current Building Division/code pages for a 2026 project.

2025 Colorado Wildfire Resiliency Code

The Colorado Wildfire Resiliency Code became effective in Centennial on June 30, 2026. Centennial states that mapped portions of the city fall in Low and Moderate fire-intensity areas.

The rules can affect new construction and qualifying exterior work, including certain additions, projects adding 500 square feet or more to the structure footprint, projects affecting at least 25% of a structure’s exterior, and roof replacements involving 25% or more of the roof surface. Requirements vary by the mapped wildfire-intensity area.

Check Centennial’s 2026 wildfire-resiliency guidance and property map ↗

Contractor Licensing & Homeowner Permits

Contractors

Centennial requires contractors and subcontractors performing work in the City to be properly licensed/registered for the applicable work. Contractor applications are submitted through the Self-Service Portal.

Common application documents include general liability insurance naming the City of Centennial as certificate holder, workers’ compensation insurance or an applicable City waiver, and testing/licensing credentials when required.

License Classification Published City Fee
General Contractor Class A $255
General Contractor Class B $155
General Contractor Class C $105
HVAC $80

Centennial states that electrical and plumbing applicants must provide applicable Colorado DORA state/master licenses. Class A, B, C and HVAC applicants may need accepted ICC testing or qualifying Denver/Aurora credentials. City contractor licenses are valid for one year from issuance.

Apply for or renew a Centennial contractor license ↗

Can a homeowner pull the permit?

Yes, but Centennial states that a homeowner may pull the permit only when the homeowner will perform the work and occupies the residence being permitted. The City requires a Homeowners Agreement/Affidavit.

The agreement requires the homeowner to acknowledge responsibility for the work being personally performed, understand when inspections are required and obtain inspection approval before regulated work is concealed and again at project completion.

Search Permits, Check Status & Close the Project

Search an existing permit

The Centennial Self-Service Portal provides public permit information and allows registered users to track their own active applications, invoices and inspections.

  1. Open the Self-Service Portal.
  2. Use the search tools for available public records or sign in to view records associated with your account.
  3. Search with the permit number, address or available property information.
  4. For older or more detailed records not available online, use the City’s public-records request process.

From permit issuance to final approval

  1. Print or retain the issued permit and approved/stamped plans.
  2. Begin work only after permit issuance. The City’s published process states permits are active for 180 days.
  3. Request each required inspection before concealing the relevant work.
  4. Correct failed items and arrange reinspection when required.
  5. Complete all final inspections.
  6. For projects requiring occupancy approval, obtain the inspector’s clearance and submit the appropriate TCO/CO request.
  7. Email the Building Division after all inspections pass to request the Certificate of Occupancy or Certificate of Completion when applicable.
  8. Retain the closed permit, approved plans, inspection records and final certificate with the property records.

Other Useful Centennial Building Services

Need Where to Start
Building guides and project checklists Building Division resource library
Zoning / property information Centennial Property Search
Municipal building-code amendments Centennial Municipal Code
Permit-review targets Building Permit Review Schedule
Home Improvement Program The City reports that 2026 HIP funds have been fully used and expects a new funding cycle in 2027

Frequently Asked Questions

1. Who issues building permits in Centennial, Colorado?

The City of Centennial Building Division administers building permits, plan review, construction inspections and local contractor licensing for projects within City jurisdiction. Fire-code permits and reviews may also involve South Metro Fire Rescue.

2. Do I need a building permit for remodeling in Centennial?

A permit is generally required when remodeling involves structural alterations, changes to regulated building systems, electrical, gas, mechanical or plumbing work, additions, demolition or other work covered by the adopted codes. Confirm the exact permit classification before starting work.

3. How do I apply for a Centennial building permit?

Create or sign in to an account on the City’s Self-Service Portal, select Apply, choose the correct permit classification, add the project property and contacts, enter the scope and valuation, upload the required PDF documents, complete any required signature and submit the application.

4. How much does a building permit cost in Centennial?

Many building permit fees are calculated from project valuation using Centennial’s published fee table. When plan review is required, the published plan-review fee is 65% of the building permit fee. Construction-material use tax, trade fees and other project-specific charges may also apply.

5. How long does Centennial take to review a building permit?

The City’s published first-review targets range from one business day for qualifying One-Stop permits to 5, 10 or 15 business days for many residential and commercial plan-review applications. The clock depends on a complete submittal, and corrections or outside-agency approvals can extend the total process.

6. How do I schedule a building inspection in Centennial?

Sign in to the Self-Service Portal, open Dashboard, select Active, choose the permit number, open the Inspections tab and use the Action option for the required inspection. Requests for the next business day must be submitted before 3:30 p.m., but next-day service is not guaranteed.

7. Can a homeowner pull their own permit in Centennial?

Yes. Centennial allows an occupying homeowner to pull a permit when the homeowner will personally perform the work covered by the homeowner declaration. The Homeowners Agreement/Affidavit must be provided, and any contractors used must meet applicable City licensing requirements.

8. What building codes does Centennial use in 2026?

The current City list includes the 2021 IBC, IRC, IEBC, IECC, IMC, IPC, IFGC and ISPSC, the 2023 NEC, 2021 IFC enforced by South Metro Fire Rescue, the 2024 Centennial Property Maintenance Code and the 2025 Colorado Wildfire Resiliency Code. Local amendments also apply.

9. How can I look up an existing Centennial building permit?

Use the City’s Self-Service Portal to search available public permit information. Registered applicants can also sign in to review records connected to their account. For information not available through the portal, submit a City public-records request.

10. How long is a Centennial building permit active?

The City’s published permit process states that permits are active for 180 days after issuance. Because permit status can depend on construction activity, inspections and individual permit conditions, check the permit record or contact the Building Division if work has been delayed.

Before You Start Work

For a Centennial project, the safest sequence is simple: verify the address and jurisdiction, choose the correct permit classification, prepare complete plans and valuation information, submit through the official portal, pay the required invoice, wait for permit issuance, and schedule each inspection before covering regulated work. Keep the permit and approved plans available until the project is fully closed.