Chino Building Department 2026: Permits, Inspections & Services

Chino Building Permits, Inspections & Official Services

If you are planning construction, a remodel, an ADU, electrical work, a patio cover, a commercial tenant improvement, or another regulated project in Chino, the main local office is the City of Chino Development Services Department, Building Division. It reviews building plans, issues permits, performs construction inspections, and enforces applicable building standards inside the City of Chino.

Quick answer:
Building Division: 13220 Central Avenue, Chino, CA 91710
Building questions: 909-334-3251
Inspection scheduling: 909-334-3252
Building email: ds-building@cityofchino.org
Public counter / normal processing hours: Monday-Friday, 7:30 a.m.-5:30 p.m.
Inspections: Monday-Friday, generally 8:00 a.m.-4:00 p.m.
Next-day inspection cutoff: request before 3:00 p.m.

The City currently states that Chino has adopted the 2025 California Building Code with local amendments. For new California permit applications in 2026, the 2025 California Building Standards Code is the statewide code cycle. If you want a plain-English explanation of the statewide rules before checking Chino’s local amendments, see our 2026 California Building Code guide.

Chino Building Division Contact Information

Service Current Details
Official department City of Chino Development Services Department — Building Division
Address 13220 Central Avenue, Chino, CA 91710
Building phone 909-334-3251
Inspection phone 909-334-3252
Building email ds-building@cityofchino.org
Development Services 909-334-3314
Planning Division 909-334-3253 · planning@cityofchino.org
Official Building page City of Chino Building Division

If the property is outside Chino city limits, do not assume this office is the correct permitting authority just because the mailing address says “Chino.” Confirm the jurisdiction first. For properties elsewhere, you can use the USBuilding.org building department directory to continue with the correct city or county.

Do You Need a Building Permit in Chino?

Chino states that a building permit is required for most construction, alteration, repair, and demolition work unless a specific exemption applies. Starting regulated work before obtaining a permit can lead to a stop-work order, added fees, corrections, and problems later when selling or financing the property.

Projects that commonly require City review include:

  • New houses and other new structures.
  • Room additions and building expansions.
  • Garage conversions and other room conversions.
  • Accessory dwelling units (ADUs).
  • Structural remodeling.
  • Electrical wiring, service panels, and regulated electrical installations.
  • Plumbing alterations and water-heater work.
  • HVAC and mechanical work.
  • Patio covers, decks, and pergolas.
  • Swimming pools and related systems.
  • Commercial tenant improvements.
  • Demolition.
  • Grading and certain site improvements.
  • Block walls and fences where City permit thresholds are triggered.

The City’s published guidance specifically identifies block walls and fences over 36 inches among work that may require permits. Because structural conditions, location, zoning, utilities, fire access, and project scope can change the answer, call the Building Division before purchasing materials when the requirement is unclear.

Minor work does not always require a building permit. The City’s Building Division FAQ gives examples such as painting, wallpapering, carpet, tile, repairing a leaking faucet, and ordinary mechanical-equipment maintenance. However, a building-permit exemption does not automatically waive zoning, electrical, plumbing, fire, HOA, historic, or other requirements.

Before Applying: Check Zoning First

A common mistake is preparing full construction plans before confirming what can legally be built on the property. Building-code compliance and zoning compliance are separate questions.

Chino provides an online Land Use Viewer and mapping page. You can search by address or Assessor’s Parcel Number (APN) to identify the property’s zoning or specific-plan designation.

  1. Find the property. Open the City’s Maps page and launch the Land Use Viewer.
  2. Search by street address or APN. Verify that the map result is the correct parcel.
  3. Record the zoning or specific-plan designation. This affects uses, setbacks, building placement, height, density, parking, and other development standards.
  4. Review the zoning rules. The City’s Zoning page provides access to Title 20 and related zoning information.
  5. Ask Planning about uncertain conditions. Call 909-334-3253 or email planning@cityofchino.org before paying for detailed plans if setbacks, use, lot coverage, an ADU, conversion, or other land-use issue is uncertain.

This small check can save a lot of frustration. A technically correct building plan may still need changes if it conflicts with zoning or a specific plan.

How to Apply for a Chino Building Permit Online

Chino uses an Accela Citizen Access (ACA) permit system. The City says applications can be submitted online 24 hours a day, seven days a week, although staff processes them during normal business hours.

  1. Open the City’s permitting instructions. Start at the Development Services Permitting Process page.
  2. Create an ACA account if needed. Select “Register for an Account” from the Citizen Access portal and complete the registration.
  3. Sign in and choose Building. From the permit portal, select the Building section.
  4. Select “Create an Application.” Read and accept any terms, then choose the permit/application type that matches your work.
  5. Enter the project information. Be ready with the site address, parcel information, owner and applicant details, project scope, valuation, and contractor or owner-builder information.
  6. Upload required plans and supporting documents. Follow the City’s electronic-file requirements rather than combining unrelated items into one unorganized file.
  7. Submit the application. Save the record number or confirmation so you can track the project.
  8. Pay required plan-check or permit fees when invoiced. Review the portal and City messages for payment instructions and outstanding requirements.
  9. Respond to corrections. If reviewers issue comments, update the plans and submit a complete response addressing each comment.
  10. Wait for issuance before starting regulated work. Planning approval or plan-check approval alone is not permission to begin construction when a building permit is still required.

Direct portal: City of Chino Accela Citizen Access.

What Information Should You Prepare?

The City’s published building permit application requests more than just a name and address. Preparing the following information before you start the online application makes the process easier:

  • Project property address.
  • Property owner’s name and contact information.
  • Parcel number / APN.
  • Applicant name, phone, and email.
  • Whether the project is residential or non-residential.
  • Whether an HOA applies.
  • Type of work: new construction, addition/alteration, or other work.
  • A clear description of the proposed construction.
  • Existing and proposed building area where applicable.
  • Estimated construction valuation.
  • Occupancy/use and construction type for applicable projects.
  • Architect or engineer information when a licensed design professional is involved.
  • Licensed contractor information or the appropriate owner-builder declaration.
  • Workers’ compensation information when applicable.

The official application form is available through the City’s Building Applications & Forms page.

Electronic Plan Requirements: Avoid an Easy Rejection

The City’s ACA guide gives practical electronic-submittal rules. For plan-check projects, documents should generally be submitted as PDFs, with plans and supporting documents organized separately.

File Item Chino Guidance
File format Use PDF documents for electronic submittals.
Security settings Files should be unsecured so City reviewers can mark them up and add comments.
File names Use clear names based on the project address and file description. The City’s guide asks applicants to avoid dashes and special characters.
Plans vs. supporting material Keep plans, Title 24 documents, calculations, soils reports, and other supporting documents in appropriate separate files.
Drawing scale Generate plans at a measurable prescribed scale where required.
Orientation The City’s ACA guide directs drawing/plan sets to use consistent landscape orientation.
Planning conditions If Planning issued conditions of approval, include them and address the applicable conditions in the submittal.
Resubmittal Provide corrected plans plus a response explaining how each plan-check comment was addressed.

The City has several project-specific plan-submittal handouts for single-family homes, room additions, tenant improvements, commercial/industrial projects, solar systems, EV chargers, walls, patio covers, pools, and other work. Use the current handout that matches your project rather than assuming one checklist fits everything.

How Long Does Chino Plan Review Take?

The City’s current ACA guide says submittal review can take up to approximately three to five weeks after the plan-check fee is received. That is planning guidance, not a guaranteed approval date.

Review can take longer when:

  • Required documents are missing.
  • Plans do not satisfy electronic-submittal standards.
  • Planning, Engineering, Fire, utilities, or another department must review the project.
  • Structural calculations require additional review.
  • The project receives plan-check corrections.
  • Revised plans do not clearly address earlier comments.
Best way to reduce delays: submit a complete plan set, use the correct project checklist, name files clearly, and provide a point-by-point response when resubmitting corrections.

Search a Chino Building Permit or Application

The ACA system can also be used to find available permit and application information. The City’s permit guide shows search fields that can include site address, contractor license information, parcel number, and record information.

  1. Open Chino Citizen Access.
  2. Select the Building area.
  3. Choose the permit/application search function.
  4. Enter the cleanest information you have, such as the permit number, address, or parcel number.
  5. Open the matching record and review the available status, fees, reviews, inspections, or other displayed activity.
  6. If the permit is too old to appear online or documents are missing, contact the Building Division or use the City’s public-records process.

Do not treat an empty online search as proof that no permit was ever issued. Older files, archived documents, alternate property addresses, and records maintained outside the public portal may require staff assistance.

Chino Building Permit Fees for 2026

Chino published a revised Building Division fee schedule on June 25, 2026, with fees shown as effective July 1, 2026. Building permit charges are primarily valuation-based, with other plan-check, technology, trade, school, state, and project-specific fees potentially added.

Project Valuation Published Building Permit Fee Formula
$1-$500 $25.66
$501-$2,000 $25.66 for the first $500 + $2.05 per additional $100 or fraction
$2,001-$25,000 $46.19 for the first $2,000 + $9.24 per additional $1,000 or fraction
$25,001-$50,000 $258.68 for the first $25,000 + $6.67 per additional $1,000 or fraction
$50,001-$100,000 $425.49 for the first $50,000 + $4.62 per additional $1,000 or fraction
$100,001-$500,000 $656.45 for the first $100,000 + $3.59 per additional $1,000 or fraction
$500,001-$1,000,000 $2,093.56 for the first $500,000 + $3.08 per additional $1,000 or fraction
Over $1,000,000 $3,633.32 for the first $1,000,000 + $2.05 per additional $1,000 or fraction

The same July 2026 fee schedule lists several additional charges that may apply:

  • Building plan check: 75% of the building permit fee.
  • Technology fee: 7.5% under the published schedule.
  • General Plan Update fee: 0.05% of job valuation.
  • Strong Motion Instrumentation fee: valuation-based state pass-through charge.
  • Electrical permit issuance: $67.94, before applicable unit/system charges.
  • Mechanical permit issuance: $67.94, before applicable equipment charges.
  • Plumbing permit issuance: $67.94, before applicable fixture/system charges.
  • Additional plan review: published at $168 per hour with a one-hour minimum, or actual jurisdiction cost where applicable.
  • Reinspection: published at $252 per hour under the fee schedule, subject to the stated conditions.

The schedule also identifies school development fees collected by the Chino Valley Unified School District before City building-permit issuance for applicable projects. The July 2026 City schedule lists $5.38 per square foot for residential and $0.87 per square foot for commercial/industrial development, but specifically tells applicants to verify the amount with CVUSD before relying on it.

Do not budget from the base building-permit fee alone. Planning, engineering, fire, school, utility, development-impact, plan-review, technology, state, and other charges can materially change the total. For a serious project budget, request project-specific fee information from the responsible agencies.

Current official fee document: Chino Building Division Fee Schedule — effective July 1, 2026.

How to Schedule a Chino Building Inspection

Once the permit is issued and the project reaches a required inspection stage, the work must remain visible and accessible until the appropriate inspection is completed.

The City currently provides two main options:

Requests must be submitted before 3:00 p.m. for a next-business-day inspection request. Building inspections are conducted Monday through Friday from approximately 8:00 a.m. to 4:00 p.m.

Information needed for the online inspection request

  • Name and contact information.
  • Permit number.
  • Phone and email.
  • Project/site address.
  • Inspection type.
  • Preferred AM or PM time frame.
  • Special access instructions when needed.

What does AM or PM mean?

Chino’s Today’s Inspections page defines the windows as:

  • AM: approximately 8:00 a.m.-12:00 noon.
  • PM: approximately 12:00 noon-4:00 p.m.

These are inspection windows, not exact appointment times. You can review the City’s Today’s Inspections page and Building Inspection List Archive for the day’s schedule.

Before the inspector arrives

  • Have the permit number available.
  • Keep approved plans and the inspection record/card at the job site when required.
  • Make the work accessible.
  • Do not cover framing, reinforcement, wiring, plumbing, or other work that requires inspection before approval.
  • Provide safe site access.
  • Correct previous inspection items before asking for reinspection.

Construction Working Hours in Chino

The City’s published Builder’s Bulletin cites Chino Municipal Code Section 15.44.030 and states that construction may occur only:

7:00 a.m. to 8:00 p.m., Monday through Saturday.

The bulletin states that construction is not allowed on Sundays or federal holidays. The rule covers construction activity such as buildings, paving, utilities, filling, grading, excavation, drilling, and similar work.

Official bulletin: City of Chino Construction Working Hours.

Building Codes Used in Chino in 2026

The City Building Division states that Chino has adopted the 2025 Edition of the California Building Code with amendments, with local adoption and amendments addressed in Chapter 15 of the Chino Municipal Code.

Depending on the project, California’s 2025 Title 24 code cycle can involve building, residential, electrical, mechanical, plumbing, energy, fire, CALGreen, existing-building, accessibility, and other requirements. A remodel may touch several code parts even when the homeowner thinks of it as one “building permit.”

For applications submitted under an earlier code cycle, do not automatically apply the newest rules. Ask the City which edition applies to the existing permit or plan-check record.

Common Projects: Where to Start

Project Practical First Step
Kitchen or bathroom remodel List all structural, plumbing, electrical, and mechanical changes. Ask Building which permits and plans are required before demolition begins.
Room addition Check zoning/setbacks first, then use the City’s room-addition plan submittal handout and building permit process.
ADU Review Planning eligibility and the City’s ADU standards before submitting building plans.
Garage conversion Confirm zoning, parking, fire/life-safety, utility, and building requirements before removing garage functions.
Patio cover Review the City’s patio-cover standard and verify setbacks and structural requirements.
Block wall / fence Check height and location. Chino identifies walls/fences over 36 inches among work that may require permitting.
Pool or spa Confirm building, electrical, plumbing, barrier, and anti-entrapment requirements before excavation.
Solar PV Use the City’s solar submittal guidance and applicable online permitting route.
EV charger Use the residential or non-residential EV charger checklist and confirm whether plan review is required.
Commercial tenant improvement Confirm permitted use, occupancy, accessibility, fire requirements, and tenant-improvement plan checklist before submittal.

Chino ADU Permits

For homeowners considering an accessory dwelling unit, Chino maintains a dedicated ADU information page.

The City explains that ADUs may be attached, detached, or located within an existing or proposed primary residence, subject to applicable rules. A Junior ADU is generally limited to no more than 500 square feet and must be contained within an existing single-family residence or attached garage under the City’s published guidance.

Chino also offers preapproved ADU plans. “Preapproved” does not mean construction can begin without City approval. The property still requires a project submittal, site-specific review, plan check, and permit issuance.

Need an Older Permit, Plan or Building Record?

If a record does not appear in the online permit search, contact the Building Division with the property address and any known permit number or construction date.

For records requiring a formal request, Chino uses an online public-records system. The City’s Public Records Request page explains how to request records from City departments.

For a building-record request, include as much detail as possible:

  • Full property address.
  • APN if available.
  • Permit number if known.
  • Approximate year of construction or alteration.
  • Specific documents needed, such as permit history, inspection records, or available plans.

Original construction plans can have disclosure or copying restrictions, so do not assume every drawing can be immediately downloaded.

Common Permit Problems and What to Do

Problem Practical Next Step
You do not know whether a permit is required Call 909-334-3251 with the property address and a clear description of the work.
Permit application shows corrections Read every correction, revise the appropriate sheets, and submit a response letter explaining where each item was corrected.
Permit search returns nothing Try address/APN variations, then contact Building or submit a records request for older files.
Inspection did not pass Complete the inspector’s required corrections before scheduling reinspection. Additional fees may apply in qualifying cases.
Work started without a permit Stop regulated work and contact the City. Do not conceal additional construction while trying to resolve the permit issue.
You are unsure about setbacks or allowed use Contact Planning at 909-334-3253 before changing the design.
Permit is old or close to expiration Contact the Building Division before the deadline. Do not rely on a generic expiration rule when the record may have project-specific conditions.

Chino Building Department FAQs

1. Where is the Chino Building Department?

The City of Chino Building Division is part of Development Services and is located at 13220 Central Avenue, Chino, CA 91710.

2. What is the Chino Building Division phone number?

Call 909-334-3251 for building permit, plan review, code, and general Building Division questions. The inspection scheduling number is 909-334-3252.

3. Can I apply for a Chino building permit online?

Yes. Chino provides an Accela Citizen Access permit portal. Register for an account, select the Building section, create the appropriate application, upload required documents, and follow the City’s review and payment instructions.

4. How do I check a Chino building permit?

Use the City of Chino Accela Citizen Access portal and open the Building search. Search using available fields such as the address, parcel number, permit/record information, or other supported criteria. Contact Building for older records that are not displayed online.

5. How do I schedule a building inspection in Chino?

Submit the City’s online Request an Inspection form or call 909-334-3252. Requests should be submitted before 3:00 p.m. for a next-business-day inspection request.

6. What time are Chino building inspections?

The City states that inspections are conducted Monday through Friday from approximately 8:00 a.m. to 4:00 p.m. AM inspections fall within roughly 8:00 a.m. to noon, while PM inspections fall within noon to 4:00 p.m.

7. How much does a Chino building permit cost?

There is no single flat price. Building permit fees use a valuation-based schedule, and plan-check, technology, trade, school, development, state, or other charges may apply. The current City schedule was revised June 25, 2026 and is effective July 1, 2026.

8. What building code does Chino use in 2026?

The City states that it has adopted the 2025 California Building Code with local amendments. The broader 2025 California Building Standards Code is the statewide code cycle used for qualifying new applications in 2026.

9. What are legal construction hours in Chino?

The City’s Builder’s Bulletin states that construction may occur from 7:00 a.m. to 8:00 p.m. Monday through Saturday, with no construction on Sundays or federal holidays, under the cited municipal-code provision.

10. Do I need a permit for a remodel in Chino?

Many remodels require permits when structural, electrical, plumbing, mechanical, occupancy, or other regulated work is involved. Purely cosmetic work may be exempt. Give the Building Division the exact project scope before starting if you are unsure.

Before You Start Work

For most Chino projects, the safest sequence is simple: confirm the property is inside City jurisdiction, check zoning, determine which permits are required, prepare the correct drawings and supporting documents, submit through the City’s permit process, complete plan review, pay the applicable fees, and wait for permit issuance before starting regulated construction.

After construction begins, keep required work visible for inspection and schedule inspections before covering it. Small steps like checking zoning early or naming plan files correctly can prevent weeks of unnecessary delay.

Information reviewed for the 2026 permit cycle. Government fees, portal functions, forms, staff contacts, review procedures, and code requirements can change. USBuilding.org is an independent informational resource and is not affiliated with the City of Chino. Official City instructions and permit decisions control. See our research and verification standards for how permit information is reviewed.

Leave a Comment