Clark County Building Permits, Inspections and Online Services
If your property is in unincorporated Clark County, Nevada, the Clark County Building Department is the place you will usually deal with for building permits, plan review, permit issuance and building inspections. Most of the process can now be handled online, but there is one important step to get right before you begin: make sure Clark County is actually your permitting jurisdiction.
This guide walks you through the process from that first jurisdiction check to the final inspection. It also covers 2026 building codes, permit exemptions, current fee calculations, expected plan-review times, records, expired permits and the small details that can save you a frustrating second submission.
First: Is Clark County the Right Building Department?
This matters more than many people expect. A property may have a Las Vegas mailing address without being inside the incorporated City of Las Vegas. Large areas of the Las Vegas Valley are unincorporated Clark County and use Clark County for permitting.
Clark County is separate from the building departments serving Las Vegas, Henderson, North Las Vegas, Boulder City and Mesquite. Starting with the wrong jurisdiction can mean filling out the wrong forms and losing time before your project even reaches plan review.
-
Confirm the property address.
Use the actual project address and parcel information rather than relying only on the city name shown in the mailing address. -
Check the jurisdiction.
Visit the county’s official jurisdiction guidance. -
If the property is in unincorporated Clark County, continue with the county portal.
If it falls inside an incorporated city, use that city’s building department instead.
Clark County Building Department Contact Information
| Department | Clark County Department of Building & Fire Prevention – Building Department |
|---|---|
| Address | 4701 W. Russell Road, Las Vegas, NV 89118 |
| Main Phone | (702) 455-3000 |
| Fax | (702) 380-7232 |
| Office Hours | Monday–Thursday, 7:30 a.m.–5:30 p.m.; closed Friday–Sunday |
| Permit / Public Assistance | (702) 455-8972 |
| Inspection Assistance | (702) 455-8040 |
| Plans Examination | (702) 455-8011 |
Office schedules and contact routing can change. Check the county page before making a special trip.
What Services Does the Department Handle?
The Building Department is more than a permit counter. Depending on the project, you may interact with several parts of the department during the same application.
| Service | What You Can Do |
|---|---|
| Permit applications | Submit new building and trade permit applications and supporting documents. |
| Plan review | Receive building, structural and applicable discipline reviews and respond to corrections. |
| Permit issuance | Complete required conditions, pay assessed fees and obtain the issued permit. |
| Inspections | Schedule required field inspections, review results and work toward final approval. |
| Records | Search many historical permits, plans and building-related documents. |
| Enforcement | Handle building-code concerns, violations and related complaint processes. |
Do You Need a Clark County Building Permit?
In general, a permit is required before constructing, enlarging, altering, repairing, moving or demolishing a regulated building or structure, changing its occupancy, or installing or altering regulated electrical, gas, mechanical or plumbing systems.
Clark County does provide specific permit exemptions. These are useful, but an exemption from a building permit does not give permission to violate zoning rules, technical codes, easements, HOA requirements or other county laws.
| Common Work | 2026 Practical Guidance |
|---|---|
| One-story detached storage shed / playhouse | A building permit may be exempt when it is associated with a single-family dwelling, is non-occupiable, does not exceed 200 sq. ft., and has no mechanical or plumbing installation. Limited electrical work may still require a separate electrical permit. |
| Painting, flooring, cabinets, moldings or countertops | These types of ordinary finish work are listed among building-permit exemptions. |
| Type A fence | A fence not over 6 feet high may be exempt when it is not part of a pool barrier. |
| Type B fence / retaining wall | The county code lists Type B fencing, including retaining walls not over 24 inches high, as exempt. |
| Minor drywall/lath repair | May be exempt when the code’s size, framing and fire-resistance conditions are met, including a maximum repair area of 30 sq. ft. |
| Some non-tile roof covering replacement | May be exempt where no structural component is repaired/replaced and no more than 64 sq. ft. of roof sheathing is replaced. |
| Pool, room addition, garage conversion or structural alteration | Expect a permit and potentially plan review. Do not start based on a general exemption assumption. |
| Electrical, plumbing, HVAC or gas changes | Trade permits commonly apply even when a related building component is exempt. |
For unusual work, compare your project with the county’s official permit guidance before construction begins.
Important 2026 Building Code Change
The county’s published 2026 code set includes major references such as:
- 2024 International Building Code (IBC)
- 2024 International Residential Code (IRC)
- 2024 International Existing Building Code (IEBC)
- 2024 International Energy Conservation Code (IECC)
- 2024 International Swimming Pool and Spa Code (ISPSC)
- 2024 Uniform Mechanical Code (UMC)
- 2024 Uniform Plumbing Code (UPC)
- 2023 National Electrical Code (NEC)
- Clark County’s 2018 Building Administrative Code
- Applicable Southern Nevada amendments
Always use the county’s current codes and amendments page when preparing plans. A designer using an older code edition can create avoidable corrections.
Nevada jurisdictions do not necessarily use identical local procedures. For example, property owners working elsewhere in the state should use the rules for that jurisdiction rather than copying Clark County requirements. Our Carson City Building Department guide is a separate example.
How to Apply for a Clark County Building Permit Online
Clark County says building-permit work within its jurisdiction can be handled online from application through issuance. The main system is the Citizen Access Portal (CAP).
-
Confirm jurisdiction first.
Make sure the project is in Clark County’s permitting area and not an incorporated city. -
Create or sign in to your CAP account.
Go to the Clark County Citizen Access Portal. Registration is needed for full application, payment and account-linked services. -
Choose the correct application type.
Building, residential, commercial, grading, pool, sign and sub-permit applications have different requirements. -
Download the correct county form or checklist.
Use the official application and checklist page. -
Prepare plans and supporting documents.
Depending on the project this may include architectural, structural, electrical, mechanical, plumbing, energy, soils, truss, site or zoning information. -
Submit the application and plans electronically.
Follow CAP and the county’s electronic-plan instructions. Use clear filenames and the requested document categories. -
Watch the record for plan-review comments.
If corrections are issued, respond to each comment and upload the corrected documents under the correct attachment type. -
Complete conditions of approval.
Approval of plans does not always mean the permit can immediately be issued. Resolve any remaining departmental conditions. -
Pay the assessed fees.
Use the amount shown by the county for your actual record rather than estimating from another project. -
Receive the permit and schedule required inspections.
Keep the permit information available throughout construction because you will need the record details when scheduling inspections.
Uploading Corrections, Revisions or Other Documents
If your permit already exists, Clark County’s current workflow is straightforward:
- Sign in to CAP.
- Select Building.
- Select Search Permits.
- Search for the building permit record, commonly in a format such as BD##-#####.
- Open the permit record.
- Choose Record Info, then Attachments.
- Select Add Attachment.
- Use the correct document type for what you are submitting.
Common Application Forms
The exact package depends on the project, but the county currently publishes forms such as:
| Project / Purpose | County Form or Checklist |
|---|---|
| General building permit | Building Permit Application |
| Commercial construction | Commercial Checklist |
| Residential construction | Residential Checklist |
| Fence or wall | Fence / Wall Application |
| Grading | Grading Application |
| Residential pool or spa | Residential Pool / Spa Application |
| Commercial pool or spa | Commercial Pool / Spa Application |
| Electrical, plumbing or mechanical sub-permit | Sub-Permit Application |
| Owner-builder project | Owner Builder Affidavit when applicable |
| Sign work | Sign Application |
Do not download a form from an old search result or another contractor’s files. Get the current version from the county’s application page before submitting.
Simple Online Permits That May Not Need Plan Review
Some routine replacement work can use Clark County’s Simple Online Permit process. These permits generally do not require plans for plan review and can move to processing through CAP more quickly.
| Trade | Examples Listed by Clark County |
|---|---|
| Electrical | Test/tag work and certain same-size electrical panel replacements. |
| Mechanical | Qualifying furnace, A/C and condenser/heat-pump replacement work. |
| Plumbing | Gas re-tag, qualifying water heater, reverse-osmosis, water-softener and residential re-pipe work. |
There are limits on what qualifies, including appliance-count and project-type restrictions. Review the county’s Simple Online Permit rules before choosing this path.
How Long Does Clark County Plan Review Take?
These are the county’s published review goals, not guaranteed completion dates. A complete, well-organized submission gives you the best chance of staying near the target.
| Review Type | First Review Goal |
|---|---|
| Commercial | 21 days |
| Commercial Minor | 14 days |
| Commercial 7-Day | 7 days |
| Standard Plan | 21 days |
| Custom Single-Family Residence | 21 days |
| Residential Minor | 14 days |
| Revision | 10 days |
| Phased Project | 42 days |
| Corrections / subsequent reviews | 10 days |
The county generally describes a regular commercial project as one with a valuation of at least $250,000. Commercial Minor projects are generally below that threshold, while the county’s 7-Day category has additional qualification requirements, including zoning approval and a valuation below $100,000.
You can check the current targets on the official plan-review timeline page.
Clark County Building Permit Fees
There is no single flat building-permit price. Fees depend on the permit type, project valuation, plan review and any applicable development or impact charges.
Clark County’s current Building Administrative Code includes the following valuation-based building-permit fee schedule:
| Total Valuation | Base Permit Fee Calculation |
|---|---|
| $1–$500 | $54.00 |
| $501–$2,000 | $54.00 for the first $500, plus $1.683 for each additional $100 or fraction. |
| $2,001–$25,000 | $79.29 for the first $2,000, plus $7.371 for each additional $1,000 or fraction. |
| $25,001–$50,000 | $248.82 for the first $25,000, plus $4.725 for each additional $1,000 or fraction. |
| $50,001–$100,000 | $366.95 for the first $50,000, plus $3.402 for each additional $1,000 or fraction. |
| $100,001 and up | $537.05 for the first $100,000, plus $2.934 for each additional $1,000 or fraction. |
For a project-specific estimate, use Clark County’s official fee calculator. The county itself notes that calculator results are estimates and the final fees are determined during processing.
Contractor and Owner-Builder Requirements
Contractors and subcontractors performing regulated work generally need an active Nevada State Contractor’s License. Clark County also requires a CAP account for online permitting, payment and record access.
Owner-builders should not simply enter themselves as the contractor without checking the rules. If an owner-builder path applies to your project, complete the required county affidavit and make sure you understand the responsibilities that come with it.
One distinction is especially useful: Clark County treats single-family residences and townhomes as residential for this purpose. Condominiums, apartments and other property types are handled as commercial, and commercial permits must be issued to a properly licensed contractor.
How to Schedule a Clark County Building Inspection
Once the permit is issued, inspections can be requested. Clark County provides several scheduling methods, so you normally do not need to visit the office.
Option 1: Schedule Online
- Sign in to the Citizen Access Portal.
- Open your permit record.
- Select the inspection option.
- Choose the required inspection type.
- Select an available date.
- Add access or site instructions when needed.
- Submit the request and retain the confirmation.
The county says most inspection types can be scheduled online up to five days in advance. Morning or afternoon preferences may be requested, although field conditions can affect the actual arrival time.
Option 2: Automated Phone Scheduling
Call (702) 455-3000 and follow the building-inspection prompts. The county’s published sequence is generally option 1, then 1, then 1 for inspection scheduling. Have the permit’s phone-system number available.
Option 3: Schedule or Check Inspections by Text
Clark County also publishes a text-based inspection service at 844-461-3023. Supported commands include scheduling, rescheduling, canceling and requesting results.
| Common Inspection | Code |
|---|---|
| Foundation / footing | 2222 |
| Building framing | 2244 |
| Final building | 2299 |
| Rough electrical | 3331 |
| Final electrical | 3399 |
| Rough plumbing | 4441 |
| Final plumbing | 4499 |
| Rough mechanical | 5551 |
| Final mechanical | 5599 |
| Final pool | 6699 |
For the complete texting instructions and inspection-code list, use Clark County’s official inspection-by-text guide.
Need to Know Which Inspector Is Coming?
On the morning of the inspection, Clark County directs customers to call (702) 455-3000 after 7:30 a.m. and use the inspection routing prompts to obtain inspector information. Have the permit’s phone-system number ready.
Do Not Forget Final Clearances
Passing the last building inspection does not always mean the entire project is ready to close. Depending on the permit, separate clearances can be required.
| Possible Clearance | Agency / Contact |
|---|---|
| Drainage, landscape or QAA final | Clark County Building & Fire Prevention – (702) 455-3000 |
| Fire clearance | Clark County Fire Prevention – (702) 455-7317 |
| Civil / development review or FEMA-related clearance | Clark County – (702) 455-4600 |
| Sewer | Clark County Water Reclamation District – (702) 434-6600 |
| Water | Las Vegas Valley Water District – (702) 870-2011 |
| Septic | Southern Nevada Health District – (702) 759-0660 |
| Off-site work | Clark County Public Works – (702) 455-4610 |
Your own permit record is the best source for deciding which clearances apply. Do not assume every item in the table is required for every project.
How to Check a Permit Status
You can usually check the status without calling the permit counter.
- Open the Citizen Access Portal.
- Select the building-record search option.
- Enter the permit or record number.
- Open the matching record.
- Review status, inspections, attachments and other available record information.
If the record is tied to your CAP account, logging in may provide more options than an anonymous public search.
How to Find Old Clark County Building Permits and Plans
Clark County maintains a significant historical building-record collection. The county indicates that many building permits and documents date back to the 1970s, although older files may contain less information than newer electronic records.
When you do not know the old permit number, the street address is often the best starting point.
-
Start with the property address.
Confirm spelling, street direction and unit information. -
Open the county’s record search.
Use the Document Image Search. -
Review matching records.
Look for permit numbers, job cards, plans or documents that correspond with the property and project. -
Use the record number for more precise follow-up.
A specific permit number makes later searches and department communication much easier.
When Does a Clark County Building Permit Expire?
Clark County states that a building permit generally expires 180 days after issuance or 180 days after the last approved inspection. Each permit is treated independently, so activity on one related permit does not necessarily keep another permit active.
How to Renew an Expired Permit
Clark County currently processes expired-permit renewals by email.
- Sign in to CAP and identify the expired permit.
- Complete the appropriate permit application.
- Enter “Renewal of Permit” in the description.
- Put the permit number in the email subject line.
- Send only one permit renewal per email.
- Email the completed material to ExpiredPermits@ClarkCountyNV.gov.
- Follow the payment instructions once the renewal is processed.
| How Long Permit Has Been Expired | Published Renewal Fee Rule |
|---|---|
| Less than one year from original issuance or last approved inspection | One-half of the original permit fee, with a minimum fee of $54. |
| More than one year | Full original permit fee. |
Review the county’s current expired permit instructions before sending the request.
Common Problems That Slow Down a Permit
| Problem | What to Do Instead |
|---|---|
| Applying to Clark County when the property is in a city | Confirm jurisdiction before creating the application. |
| Using a 2024/2025 plan set without checking the 2026 code transition | Confirm the code edition and local amendments before finalizing design. |
| Submitting the wrong application type | Match the project to the current county application/checklist first. |
| Uploading revisions as a normal resubmittal | Use the attachment type specified by Clark County for amendments/revisions. |
| Responding to only some correction comments | Provide a clear response to every applicable correction and identify changed sheets. |
| Assuming plan approval equals permit issuance | Check for remaining conditions of approval and unpaid fees. |
| Covering work before inspection | Verify the required inspection sequence before concealing regulated work. |
| Ignoring permit inactivity | Track the 180-day expiration window and required approved inspections. |
Who Should You Contact?
(702) 455-8972
(702) 455-8972
(702) 455-8972
(702) 455-8011
(702) 455-8040
A Practical Checklist Before You Submit
- Confirm the property is in Clark County’s jurisdiction.
- Check whether the work actually requires a permit.
- Confirm the applicable 2026 code edition and local amendments.
- Create your Citizen Access Portal account.
- Choose the correct permit/application type.
- Download the latest county form and project checklist.
- Prepare complete plans rather than uploading partial files.
- Check contractor or owner-builder requirements.
- Verify zoning or other departmental approvals when applicable.
- Budget for plan review, permit and project-specific fees.
- Track correction notices in CAP after submission.
- Do not begin regulated work until the required permit has been issued.
Frequently Asked Questions
1. Where is the Clark County Building Department located?
The Clark County Building Department is at 4701 W. Russell Road, Las Vegas, Nevada 89118. The main telephone number is (702) 455-3000.
2. What are the Clark County Building Department hours?
The county currently lists public office hours as Monday through Thursday from 7:30 a.m. to 5:30 p.m., with the office closed Friday through Sunday. Online services remain available outside counter hours.
3. Can I apply for a Clark County building permit online?
Yes. Clark County uses its Citizen Access Portal for online building-permit services. Users can submit or manage permit records, upload documents, pay fees, check status and request many inspections online.
4. How do I know whether I need Clark County or the City of Las Vegas?
Check the property’s actual jurisdiction rather than relying on the mailing city. Many addresses showing “Las Vegas” are in unincorporated Clark County, while properties inside the incorporated City of Las Vegas use the city’s permitting system.
5. Do I need a permit for a shed or fence in Clark County?
Not always. Clark County’s Building Administrative Code provides an exemption for certain one-story detached accessory buildings associated with a single-family dwelling when they do not exceed 200 sq. ft. and meet the other stated conditions. Type A fencing not over 6 feet high may also be exempt when it is not part of a pool barrier. Zoning and other rules can still apply.
6. How long does Clark County building plan review take?
Published first-review goals range by project type. Examples include 7 days for qualifying Commercial 7-Day projects, 14 days for Commercial Minor and Residential Minor reviews, 21 days for regular Commercial, Standard Plan and Custom Single-Family reviews, and 42 days for phased projects. Corrections and subsequent reviews have a 10-day goal.
7. How much is a Clark County building permit?
There is no single price. Building-permit fees can depend on project valuation, permit type, plan review and other applicable charges. The county publishes a valuation fee schedule and an online fee calculator, but staff determines the final fees for the actual permit.
8. How do I schedule a Clark County building inspection?
Inspections can generally be requested online through the Citizen Access Portal, through the county’s automated phone system, by the county’s inspection text service, or through Field Services. Most online inspection requests can be made up to five days in advance.
9. How long is a Clark County building permit valid?
Clark County states that permits generally expire 180 days after issuance or 180 days after the last approved inspection. Expired permits may qualify for renewal, although Simple Online Permits are not renewable.
10. What building codes apply in Clark County in 2026?
Clark County’s 2024 code package became effective January 11, 2026. The adopted framework includes the 2024 IBC, IRC, IEBC, IECC, ISPSC, UMC and UPC, the 2023 NEC, the county’s Building Administrative Code and applicable local Southern Nevada amendments.
Official Clark County Links You May Need
You should now have enough information to understand the process without bouncing between multiple websites. When you are ready to perform the actual government action, use the appropriate official resource below.
- Citizen Access Portal — submit/search permits, access records, pay fees and manage inspections.
- Current applications and checklists — download the form matching your project.
- 2026 codes and amendments — confirm the code edition before preparing plans.
- Official fee calculator — estimate permit-related charges before submission.
- Inspection FAQ — confirm scheduling and inspection requirements.
- Building document search — locate available historical permits, plans and records.
If the property turns out not to be in Clark County jurisdiction, start again from the USBuilding.org building department guides and use the authority responsible for the actual project location.
Information reviewed for 2026. Building codes, fees, forms, portal workflows and departmental requirements can change. This guide explains the process in practical terms, but the applicable Clark County permit record, adopted code and instructions issued by the responsible government department control your individual project.