Clinton Township Building Permits, Inspections & Local Requirements
If you searched for the Clinton Twp Building Department, this guide covers the Charter Township of Clinton in Macomb County, Michigan. The township Building Department handles building permits, plan review, construction inspections, trade permits, code compliance and many ordinance-related issues.
The important part is knowing what to do before you start. Clinton Township uses downloadable permit applications rather than one single online permit system for every project, while routine building inspection requests are now submitted online.
Building Department: 40700 Romeo Plank Road, Clinton Township, MI 48038
Phone: 586-286-9323
Fax: 586-286-9484
Hours: Monday–Friday, 8:30 a.m.–4:30 p.m.
Permit email shown on current township forms: buildingpermits@clintontownship.com
What Does the Clinton Township Building Department Handle?
The department administers construction permits and inspections for properties within Clinton Township. Building work is separate from many Public Services, road, drainage, planning and county-level approvals, so identifying the right permit before submitting paperwork can save a frustrating second trip.
| Project | Usual Starting Point | Other Permit That May Be Needed |
|---|---|---|
| Home addition or structural remodel | Building permit | Electrical, plumbing and/or mechanical |
| Basement finishing | Building permit | Trade permits depending on new wiring, HVAC or plumbing |
| Deck, gazebo or arbor | Building permit | Electrical if applicable |
| Shed or detached garage | Building permit | Zoning/setback review and trade permits if utilities are added |
| Roof replacement | Reroof permit | Additional requirements for certain commercial roofs |
| Fence | Fence permit | Pool-barrier requirements if the fence encloses a pool |
| Swimming pool or spa | Building permit | Plumbing and electrical; mechanical when applicable |
| Furnace, HVAC or gas work | Mechanical permit | Electrical or building approval depending on scope |
| New circuits, panel, generator, solar or EV charger | Electrical permit | Building/mechanical permits when applicable |
| Water, sewer, fixtures or piping | Plumbing permit | Building permit for associated construction |
Clinton Township specifically lists additions, antennas, awnings, basement egress windows, basement finishing, waterproofing, decks, arbors, gazebos, demolition, fences, garage or basement floor replacement, garages, sheds, rat walls, hot tubs, swimming pools, patios with footings, porches, reroofing, sidewalks, approaches and certain window changes among common projects requiring permits.
How to Apply for a Clinton Township Building Permit
1. Confirm the property is actually in Clinton Township
A Clinton Township mailing address is not a substitute for confirming jurisdiction. Verify the municipality responsible for the parcel before completing forms or paying a fee.
2. Check zoning and the proposed location
For a shed, garage, deck, pool, fence, addition or other exterior project, check property lines, easements and zoning before drawing the final location. The township provides an official zoning map.
3. Download the correct application
Use the form that matches the work rather than trying to place every trade on the building application.
4. Prepare drawings and site information before submitting
A permit application without the required plans can be rejected or delayed. Prepare the plans, survey, property information, contractor information and any professional seals before sending the package.
5. Include separate trade applications
The township building-permit form states that separate applications must be completed for plumbing, mechanical and electrical work. A building permit does not automatically authorize those trades.
6. Submit the complete package
Clinton Township’s FAQ states that building applications may be emailed or faxed when the complete required information is provided. Plans larger than 8½ × 11 inches should be submitted in person or by mail.
For email submissions, use the permit address shown on the current application you download. Current forms list buildingpermits@clintontownship.com. Some township pages have historically displayed another township email domain, so checking the current form before sending attachments is a smart final step.
7. Wait for approval before beginning work
Applications are reviewed first-come, first-served. The township FAQ says projects not needing engineer approval may commonly take about a week or two, while its accessory-building guide advises allowing roughly 5–10 business days. Actual timing varies by season, project complexity and corrections.
What Documents Should You Prepare?
Minor residential projects
For typical minor residential work, the township lists three core items:
- A completed permit application.
- Two sets of drawings, including a wall section showing the proposed construction.
- Two copies of the plot plan or mortgage survey showing existing structures and the proposed project location.
Projects requiring formal plan review
Clinton Township’s plan-review instructions call for the following when full plan review is required:
| Submission Item | Residential | Commercial / Industrial |
|---|---|---|
| Completed application | Required | Required |
| Plan sets | 2 sets | 5 sets |
| Plan examination/application fee | $100 when applicable | $100 when applicable |
| Professional seals/signatures | When required | Required where applicable under Michigan law |
| Site/project information | As applicable | As applicable |
For commercial or industrial construction, fire-suppression shop drawings and calculations may have a separate Fire Department submission. Do not assume that delivering the Building Department plan set completes every required agency review.
See the township’s official plan-review instructions before printing large sets.
Clinton Township Building Permit Fees in 2026
Permit costs depend on the project. The township publishes a detailed multi-page fee schedule, and larger projects may include construction-value calculations, plan review, trade permits, inspections and bonds. The figures below are useful starting points, not a project quote.
| Common Item | Published Amount | Important Detail |
|---|---|---|
| Building contractor registration | $15 | Local registration fee listed in current schedule |
| New-home / commercial plan application | $100 | Nonrefundable when required |
| Residential alteration | $100 minimum | Higher construction values use the published formula |
| Garage or shed up to 600 sq. ft. | $100 permit + $55 plan review | Other charges or bonds may apply |
| Garage or shed over 600 sq. ft. | $120 permit + $55 plan review | Confirm zoning and construction requirements |
| Deck, gazebo or arbor | $120 permit + $55 plan review | Trade permits may be additional |
| Above-ground pool | $60 permit + $55 plan review | Separate plumbing/electrical fees apply |
| In-ground pool | $170 permit + $55 plan review | Additional grading and trade requirements apply |
| Hot tub | $60 permit + $55 plan review | Electrical/plumbing requirements may apply |
| Basement egress window | $120 | Structural requirements still apply |
| Basement waterproofing | $120 | Additional work can change required permits |
| Residential fence | $60 | Current fence form lists fee due at submittal |
| Residential reroof | $110 | Current reroof form also lists a $75 bond |
| Electrical application | $75 | Item and inspection fees are additional |
| Mechanical application | $75 | Equipment and inspection fees are additional |
| Plumbing application | $75 | Fixture and inspection fees are additional |
Building Department payment options include cash, check, money order and credit card where accepted. Confirm the exact amount before mailing or authorizing payment because fees can change and some permits include bonds or separate trade charges.
Check the full official fee schedule before paying.
Local Rules That Commonly Catch Applicants Off Guard
Sheds and detached garages
The township’s accessory-building guide says permits must be obtained before construction starts. It requires two copies of items such as the mortgage survey, wall section, elevation and floor plan.
- A detached accessory structure cannot be placed in an easement.
- Accessory structures are generally limited to the rear yard.
- The guide lists a maximum accessory-structure height of one story or 14 feet.
- Detached structures over 200 square feet have additional side-yard/fire-rating requirements.
- Parcel-specific zoning, lot coverage and setbacks should be checked before finalizing the design.
Pools, spas and hot tubs
Clinton Township’s residential pool guide applies to pools capable of holding 24 inches or more of water. It lists building, plumbing and electrical permits, with a mechanical permit when applicable.
Its published location rules include:
- No placement in an easement.
- At least 25 feet from the front lot line.
- At least 4 feet from another building on the same lot.
- At least 6 feet from side or rear lot lines to the water’s edge.
In-ground projects may also need grading information, utility locations and drainage review. Confirm the requirements for the specific parcel rather than designing only from a general setback summary.
Fences
The current fence application asks for the property address, owner, fence length, height, material, estimated cost, lot type and whether the fence will enclose a pool or spa. It also states that supporting construction should face inward and the smooth side should face neighboring property or the right-of-way unless approved otherwise.
Roof replacement
Yes, Clinton Township requires a permit for reroofing. The reroof application asks for roof area, construction cost, underlayment and ventilation information. Commercial flat-roof work requires additional product and energy-code information.
Newly completed homes
A useful township-specific rule: the township FAQ says a permit for a shed, deck, pool, fence or similar accessory project cannot be obtained for a new house until the final Certificate of Occupancy has been issued and the buyer’s name appears on the property deed.
Soil erosion, grading and drainage
Land disturbance, grading, excavation, new construction and projects affecting runoff may trigger soil-erosion requirements. Review the township’s soil erosion guidance before excavation instead of waiting until an inspection identifies a site-control problem.
How to Schedule a Clinton Township Building Inspection
Clinton Township is moving routine inspection scheduling away from the former telephone process. The Building Department directs permit holders to use its online inspection request form.
- Open the official Building Inspection Request form.
- Enter the street address where the inspection will occur.
- Select the requested inspection date.
- Enter the permit number. The form notes that it begins with “P”.
- Enter the inspection type, such as footing, rough, rat wall, above-ground or final.
- Add the onsite contact person’s name and working telephone number.
- Enter the contact email and any useful notes for the inspector.
- Submit the request and keep the confirmation information.
Before requesting the inspection
- Make sure the permit is active.
- Complete the work for that inspection stage.
- Do not cover work that must remain visible for inspection.
- Keep approved plans and permit information available at the site.
- Provide safe access to the work.
- Complete required trade inspections before the building final when applicable.
- Resolve previous correction notices before requesting another final.
How Long Does a Clinton Township Permit Stay Active?
Township permit materials use a 180-day activity rule. In general, a permit may become invalid if authorized work does not begin within 180 days after issuance or if work is suspended or abandoned for 180 days.
Trade permit applications are especially clear: permits can be cancelled when no qualifying inspection is requested and conducted within 180 days of issuance or the previous inspection. Electrical, plumbing and mechanical forms warn that cancelled permits cannot simply be refunded or reinstated.
The general building fee schedule provides a possible written renewal route for certain expired building permits, potentially for another 180 days at 50% of the original permit fee. This is not something to assume will apply to every permit. Contact the Building Department with the exact permit number before restarting work.
Building Codes Used in Clinton Township in 2026
The township’s current-code page lists the following editions and effective dates:
| Code | Township-Listed Effective Date |
|---|---|
| 2021 Michigan Building Code | April 9, 2025 |
| 2015 Michigan Residential Code | February 8, 2016 |
| 2021 Michigan Rehabilitation Code | April 9, 2025 |
| 2021 International Property Maintenance Code | April 9, 2025 |
| ICC A117.1-2017 accessibility standard | April 9, 2025 |
| 2023 Michigan Electrical Code / 2023 NEC | March 12, 2024 |
| 2021 Michigan Mechanical Code | March 12, 2024 |
| 2021 International Fuel Gas Code | March 12, 2024 |
| 2021 Michigan Plumbing Code | March 12, 2024 |
| 2015 International Fire Code | June 5, 2017 |
Code editions can change independently. For a project close to an adoption date, verify the edition that applies to the permit rather than assuming every building and trade code changed at the same time.
View Clinton Township’s current code list.
Can a Homeowner Pull Their Own Permit?
Yes. Clinton Township’s FAQ says a property owner may pull a permit for work on their own property. However, when a contractor is performing part or all of the work, the township recommends having the contractor obtain the permit so the responsible licensed party remains associated with the permitted work.
A homeowner permit is not faster or cheaper simply because the homeowner is listed as the applicant. Homeowner affidavits on the trade forms also make the homeowner responsible for arranging inspections and ensuring work is not concealed or placed into operation before required approval.
Check a contractor before signing
Verify the contractor’s Michigan license status, classification and expiration date before submitting permit paperwork. Clinton Township provides an official license-verification page that directs users to the State of Michigan lookup.
How to Check an Old or Open Building Permit
If you are buying a home, selling property or continuing unfinished construction, do not assume a paid permit means the job was completed. What matters is whether required inspections were approved and the permit was finalized.
- Collect the full property address and parcel information if available.
- Look for old permit numbers on contractor invoices, permit cards, inspection stickers and closing files.
- Call the Building Department at 586-286-9323.
- Ask whether the building permit is active, expired, cancelled or final.
- Ask whether electrical, plumbing or mechanical permits remain open separately.
- Confirm whether a Certificate of Occupancy was required and issued.
- If formal copies are needed, use the township’s FOIA process.
The official Clinton Township FOIA request form can be used to request public records such as permit documents, inspection history or related records when informal assistance is not enough.
Common Permit Problems and the Fastest Next Step
| Problem | What Often Caused It | Practical Next Step |
|---|---|---|
| Application rejected | Missing plans, survey, signature, payment or contractor documents | Compare your package with the current project form line by line |
| Plan review is taking longer | Corrections, engineering or missing information | Respond to every review comment in one complete resubmittal |
| Shed or garage location denied | Setback, easement, lot coverage or zoning issue | Revise the site plan before buying materials |
| Inspection cannot be processed | Wrong permit number, inactive permit or incomplete request | Use the P-number and complete every required online field |
| Final inspection fails | Trade finals or corrections remain open | Close electrical, plumbing and mechanical items before rebooking final |
| Permit has been inactive | No qualifying work or inspection within 180 days | Contact the department before doing more work |
Before You Submit: A Simple Checklist
- Correct Clinton Township jurisdiction confirmed.
- Zoning, setbacks and easements checked.
- Correct building or trade application downloaded.
- Property owner and contractor information complete.
- Contractor license status verified.
- Two residential plan sets or required commercial sets prepared.
- Plot plan or mortgage survey included where needed.
- Professional seals and signatures included when required.
- Separate electrical, mechanical and plumbing forms prepared.
- Current fee and bond amount confirmed.
- Permit formally issued before work begins.
- Work kept visible until required inspections pass.
- Online inspection requests submitted as construction progresses.
- All building and trade finals completed before considering the project closed.
Permit procedures are local even when Michigan construction codes are statewide. If you are comparing another Michigan jurisdiction, the process can be quite different. See our guides to the Ann Arbor building permit process, Birmingham, Michigan Building Department, and Bloomfield Township Building Department.
Frequently Asked Questions
1. Where is the Clinton Twp Building Department located?
The Charter Township of Clinton Building Department is at 40700 Romeo Plank Road, Clinton Township, Michigan 48038. The building office phone number is 586-286-9323.
2. What are the Clinton Township Building Department hours?
The department lists regular hours of Monday through Friday, 8:30 a.m. to 4:30 p.m. Check for holiday closures before making a special trip.
3. Can I apply for a Clinton Township building permit by email?
The township FAQ allows building permit applications to be emailed or faxed when all required information is included. Plans larger than 8½ × 11 inches should be submitted in person or by mail. Use the email shown on the current permit form.
4. How many plan sets does Clinton Township require?
The township’s plan-review instructions list two sets for residential projects and five sets for commercial or industrial projects requiring plan review.
5. How long does a Clinton Township building permit take?
Timing varies by season and project. The township FAQ says projects not requiring engineer approval may commonly take about one or two weeks, while the accessory-building guide advises allowing 5–10 business days. Corrections and outside reviews can extend the process.
6. Does Clinton Township require a permit for a roof replacement?
Yes. The township specifically requires a reroof permit. The current residential fee schedule lists a $110 reroof permit, and the current reroof application lists a $75 bond.
7. Can a homeowner pull their own permit in Clinton Township?
Yes. The township allows property owners to obtain permits for work on their own property. When a contractor is performing the work, the township recommends that the contractor obtain the permit.
8. How do I schedule a Clinton Township building inspection?
Use the township’s online Building Inspection Request form. Enter the site address, requested date, P-number, inspection type, onsite contact, telephone number and email address.
9. When does a Clinton Township building permit expire?
Township permit documents use a 180-day activity rule. A permit can become invalid if work does not begin within 180 days or remains suspended or abandoned for 180 days. Trade permits may also be cancelled when no qualifying inspection occurs within the applicable 180-day period.
10. How do I know whether an old Clinton Township permit was finalized?
Contact the Building Department with the property address and permit number. Confirm that all required building and trade inspections passed and that any required Certificate of Occupancy was issued. Formal copies can be requested through the township’s FOIA process.
Information reviewed for 2026 using Charter Township of Clinton Building Department resources. USBuilding.org is an independent informational resource and is not the Charter Township of Clinton or a government agency.