Collier Building Department 2026: Permits, Inspections & Services

Collier County Building Permits, Inspections and Permit Help

If you are trying to get a building permit in Collier County, check a permit, schedule an inspection, find an old permit, or understand what the county needs before construction starts, this guide brings those steps together in one place.

The office commonly searched as the Collier Building Department is the Building Plan Review & Inspection function within Collier County Growth Management Community Development. It handles building applications, plan review, permit conditions, construction inspections and permit closeout for properties under county permitting jurisdiction.

Quick answer: For most current permit work, start with Collier County’s CityView portal. The county changed the portal address in December 2025, so an old bookmark may take you to an outdated address. The current portal is cvportal.collier.gov/cityviewweb.

First: Make Sure Collier County Is the Correct Permit Authority

This is worth checking before you create an account or upload plans. A property can have a Naples mailing address without being inside the City of Naples, and properties inside incorporated cities may use a different building department.

Property location Where to start
Unincorporated Collier County Collier County Building Plan Review & Inspection / CityView
City of Naples Use the City of Naples Building Department
Marco Island Use Marco Island Building Services
Everglades City Everglades City contracts with Collier County for building inspection and related building services under an interlocal arrangement

If you are unsure, search the property first rather than assuming jurisdiction from the mailing city. This small check can save a surprising amount of time.

Collier Building Department Contact Information

Main permitting office North Horseshoe Campus, 2800 Horseshoe Drive North, Naples, FL 34104
Building / permit assistance 239-252-2400
Current published North Horseshoe hours Monday-Friday, 9:00 a.m.-5:00 p.m.
Inspection desk 239-252-2406
Automated inspection / IVR 239-252-3726
Building Permit Resolution Services 239-252-2493
Records 239-252-5730
Floodplain Management 239-252-2942
Zoning desk 239-252-5603

County webpages serving different functions may display broader government office hours. For an in-person permit visit, use the current Building Permits & Construction page or call 239-252-2400 before driving to the office.

Other Collier County permitting locations

Location Address Current published service hours
Immokalee 310 Alachua Street, Immokalee, FL 34142 Monday-Friday, 8:00 a.m.-5:00 p.m.
Everglades City 102 Copeland Avenue, Everglades City, FL 34139 Monday, Wednesday and Friday, 9:00 a.m.-3:00 p.m.
Heritage Bay 15450 Collier Boulevard, Naples, FL 34120 Monday-Friday, 9:00 a.m.-6:00 p.m.

What Projects Have a Collier County Permit Category?

The county publishes separate application requirements for many common projects. Choosing the correct permit type matters because the portal questions and required documents change with the project.

Current categories include:

  • New one- and two-family homes, additions and guest houses
  • Residential alterations and remodeling
  • Commercial new construction, additions and alterations
  • Air-conditioning replacements
  • Roofing and reroofing
  • Electrical work and generators
  • Plumbing, gas and water-heater work
  • Mechanical systems
  • Windows, exterior doors, garage doors and shutters
  • Swimming pools and spas
  • Solar systems
  • Fences and retaining walls
  • Sheds, carports and accessory structures
  • Screen and aluminum structures
  • Docks, seawalls, boat lifts and other marine work
  • Demolition
  • Signs and flagpoles
  • Manufactured and mobile homes
  • Irrigation and water features
  • Certificate of Use applications

Before preparing plans, open the county’s Application Requirements and Forms page and select the exact project. This is much safer than using a generic document checklist.

Important 2026 Change: Some Work Under $7,500 May Qualify for an Exemption

This is not an automatic “under $7,500 = no permit” rule. Beginning July 1, 2026, Collier County allows certain qualifying work valued under $7,500 to receive a building-permit exemption, but the owner or contractor must request the exemption and obtain county approval.

For this 2026 exemption, the county states that the work must meet all applicable conditions, including:

  • The property must be a single-family detached structure.
  • The work cannot include structural, mechanical, electrical, plumbing or gas work.
  • The property cannot be in a flood hazard area.
  • The project cannot be split into smaller jobs just to stay below the threshold.
  • The work must be performed by the owner or a licensed contractor.
  • The work must still comply with applicable building, zoning and other laws.

How to request the under-$7,500 exemption

  1. Open the GMCD CityView Public Portal.
  2. Go to Building, Remodel & Accessory Permits.
  3. Choose Apply for a Permit.
  4. Select Administrative Review (PRAD).
  5. Upload the written exemption request and documentation showing the scope and value of the work, such as the contract or supporting construction documents.
  6. Wait for county review. The county may request more information, deny the exemption and require a permit, or issue an exemption letter.

Qualifying fences follow a slightly different process through the Fence/Wall permit category and still receive zoning/easement review.

Work that may already be exempt under county rules

Separate existing exemptions can cover limited work such as flooring installation, painting or wallpaper, finish trim, certain interior-door replacement, small non-fire-related drywall repair and gutters. Additional detached single-family exemptions exist for specific minor repairs.

Do not assume an exemption applies when the project affects structure, life safety, a fire-rated assembly, flood requirements, electrical or plumbing systems, or changes an opening. When the scope is mixed, call the Building Division before work begins.

How to Apply for a Collier County Building Permit

Contractors, design professionals and agents generally use electronic permitting. Qualifying owner-builders have additional in-person signing requirements.

  1. Confirm jurisdiction. Make sure Collier County—not Naples or Marco Island—is the permitting authority for the parcel.
  2. Choose the exact permit type. Open the county’s application-requirements page and read the project-specific checklist.
  3. Prepare the documents. Gather the plans, survey/site information, contractor details, product approvals, engineering documents and other items required for that permit.
  4. Create or use your CityView account. New electronic applicants need a registered portal account.
  5. Start the building application. Enter the project type, building use, description of work, location, contacts and requested work items.
  6. Upload the files. Use clear filenames and submit each required document in the correct portal category.
  7. Pay the application charge when requested. Watch the account and email associated with the application.
  8. Follow plan review. Check CityView for review status, conditions and correction letters.
  9. Respond to corrections completely. Upload revised plans or documents through the proper correction workflow rather than starting a duplicate application.
  10. Pay permit fees after approval. A permit does not become usable merely because plan review is complete.
  11. Wait for Issued status. Construction should begin only after the permit has actually been issued and applicable conditions allow the work to proceed.
  12. Print or retain the permit and inspection documents. Keep the approved information available at the job site.
Portal file tip: Collier County’s e-permitting guidance says documents should generally be under 72 MB, plans must be to scale, and a multi-page document should normally be uploaded as one complete file rather than splitting every page into a separate PDF. Professionally sealed documents must meet the county’s digital-signature requirements.

For portal instructions, document uploading and electronic-permitting help, use the county’s E-Permitting help center.

Documents You May Need Before You Apply

There is no single document list that fits every Collier County permit. A roof replacement and a new commercial building are very different applications. Still, these are common items worth checking before you begin:

  • Property address and parcel information
  • Clear description and declared value of the work
  • Site plan, survey or plot information when required
  • Construction drawings appropriate to the scope
  • Structural or trade plans where applicable
  • Florida product approvals or NOA information for applicable products
  • Contractor and qualifier information
  • Required subcontractor information
  • Owner-builder documents when the property owner is acting as contractor
  • Floodplain or elevation documentation for affected properties
  • Stormwater information for applicable residential projects
  • Septic/DEP documents when work affects a property served by septic
  • Private-provider documents if alternative plan review or inspections are being used
  • Digitally signed and sealed documents when a Florida design professional is required

Owner-Builder Permits in Collier County

A qualifying owner may act as their own contractor under Florida owner-builder law, but this does not remove code, plan-review or inspection requirements.

The current Collier County owner-builder application states that the owner must personally appear to sign the application at a GMCD permitting location. Project-specific county pages also state that the owner-builder document is signed in person and notarized by Growth Management staff.

Owner-builders should be prepared to provide proof of ownership, identification, a description of work, job value and the plans or supporting documents required for the selected permit.

If the property is held in a trust, do not rely on old instructions. Collier County now publishes separate Owner-Builder Trust Affidavit and Guidelines material. Review the current version from the county’s application-forms page before applying.

Notice of Commencement: When to Check It

Collier County currently states that under Florida Statutes, a recorded Notice of Commencement is required for certain improvements exceeding $5,000 involving an owner and contractor on real property consisting of one- through four-family dwellings. For air-conditioning repair or replacement, the county identifies a threshold of $15,000 or more.

When your permit has an open Notice of Commencement condition, upload the recorded NOC to the permit through CityView. Do not wait until the inspector is on the way to discover that a required permit condition is still unresolved.

Understanding Collier County Permit Status

Status or stage What it means for you
Address Verification / Pending / Incomplete The application is still being established or is missing an initial requirement.
Under Review Plans and supporting documents are being reviewed.
Rejected / Revision Rejected Corrections are required. Use the correction letter to determine what must be resubmitted.
Ready for Issuance Reviews may be complete, but fees or conditions may still need attention.
Issued The permit has been issued. Check holds and required inspections before proceeding to the next construction stage.
Inspections Commenced Construction inspections are underway.
Inspections Completed Inspection work may be complete, but CO/CC conditions and fees can still remain.
Finaled / COED The county identifies these as closed statuses for permit-history purposes.

How to Check a Collier County Permit

For permits from 2011 to the present, CityView is the main public search system.

  1. Open the current CityView portal.
  2. For an address search, use the property search function.
  3. For a known permit number, open Status and Fees under the Building Department section.
  4. Open the permit record and review status, fees, conditions and available inspection information.

Older permit records

Permit period Search method
2011-present CityView Public Portal
1989-2011 External CD-Plus search; use for reference and verify current closure information separately
Before 1989 Collier County Property Appraiser records and public-record requests

The county specifically warns that older CD-Plus data may not show the current permit status. Its detailed permit-history instructions explain which database to use.

How to Schedule a Collier County Building Inspection

Inspections can be requested online or through the county’s automated telephone system. The county currently allows next-business-day scheduling until 4:00 p.m.. Requests made after 4:00 p.m. move to the following business day.

Online through CityView

  1. Sign in to CityView.
  2. Select Request an Inspection under Building Department.
  3. Enter the permit number without the final 01 used by the phone system.
  4. Open the permit.
  5. Select the Inspections section.
  6. Find the inspection you need and choose the scheduling link.
  7. Select the available date.
  8. Complete the request and retain confirmation.

Schedule by phone

Call 239-252-3726. Have the permit number and three-digit inspection code ready.

The IVR menu provides options to schedule, cancel or reschedule inspections, obtain inspection results and obtain plan-review information. Keep the confirmation number issued at the end of the call.

If CityView will not let you schedule: first check whether the permit is on hold, whether a required condition is still open, whether the contractor’s license is active, and whether you entered the permit number in the format required by that scheduling method.

What Must Be Available for the Inspector?

Collier County’s inspection instructions identify several items that may need to be available at the job site:

  • Inspection card
  • Approved plans
  • Applicable product approvals or NOAs
  • Threshold documents when required
  • Private-provider documents when applicable
  • Safe access to the work being inspected

If an occupied or locked area must be entered, an owner, authorized representative or contractor may need to accompany the inspector. Safe access to elevated work must also be provided. An inspection can fail when required access is not available.

Remote Video Inspections

Collier County offers both live and recorded video inspection options for qualifying work. These are not available for every inspection type.

Live video inspection

The current inspection page lists eligible live-video inspections including certain plumbing, gas and mechanical inspection codes. The contractor first schedules the inspection through CityView, confirms the permit has no blocking holds, and then contacts the appropriate trade email to request the Webex inspection.

Live video inspections are currently performed between 8:30 a.m. and 2:30 p.m. for qualifying requests.

Recorded video inspection

The recorded-video process is different: the county specifically instructs applicants not to schedule that inspection themselves in CityView. Instead, confirm the permit is ready and email the request to RecordedVideo@Collier.gov with the company, submitter, permit, address and inspection-code details.

Use the official inspection scheduling page to confirm that your inspection type is currently eligible before relying on video inspection.

Collier County Building Permit Fees in 2026

Collier County adopted an amended Growth Management Community Development Department Services Fee Schedule effective January 1, 2026.

There is no reliable single-price answer for a Collier County building permit. The invoice can depend on the permit type, building or trade review, construction scope, inspections, revisions and other project-specific approvals.

The 2026 schedule contains separate sections for:

  • Building permit fees
  • Structural and FEMA review
  • Electrical review
  • Plumbing and gas review
  • Mechanical review
  • Solar review
  • Fire prevention and control
  • Pool or spa permits
  • Fences and signs
  • Permit revisions
  • Permit extensions
  • Demolition
  • Inspections and reinspections
  • Contractor changes
  • Private-provider services

Use the current Building Codes & Fees page rather than an older fee PDF found through search results.

Impact fees are separate

Major construction can also involve impact fees. Collier County’s current impact-fee schedules became effective May 1, 2026. For county building permits, applicable impact fees are generally calculated under the county’s timing rules and are not simply the same charge as the Building Division permit fee.

Fire impact fees may be due at permit issuance, while other applicable impact charges can have different payment timing. Budget for them separately when planning new construction or a project that creates new development impacts.

Flood Zones Can Change the Permit Path

Floodplain requirements matter throughout Collier County. A permit that looks simple on paper can require additional review when a property lies within a regulated flood hazard area.

Depending on the property and project, the county may request an elevation certificate, V-Zone documentation, floodproofing information, cost information related to substantial improvement, or other floodplain documents.

This is also why the 2026 under-$7,500 permit exemption should not be applied casually: properties in a flood hazard area do not qualify for that particular exemption.

Current Building Code Used in Collier County

As of October 2026, Collier County identifies the Florida Building Code, 8th Edition (2023), effective December 31, 2023, as its current adopted statewide code framework, together with applicable local ordinances, interpretations and other codes.

Projects submitted near a statewide code transition should check the county’s current code page on the date of application rather than assuming the applicable edition from the calendar year.

How Long Is a Collier County Building Permit Valid?

Collier County’s permit guidance states that building permits are generally valid for 180 days after issuance. A passed inspection extends the permit for another 180 days from the qualifying inspection.

Simply paying a balance, scheduling an inspection, submitting a revision or uploading another document does not by itself keep a permit active. If a project is approaching expiration, deal with it before the deadline rather than assuming activity in the portal reset the clock.

Open or Expired Permit? Use Building Permit Resolution Services

Collier County has a Building Permit Resolution Services group specifically for problems involving open or expired permits, extensions, cancellations, contractor changes and similar permit-status issues.

This is especially useful when a permit problem appears during a home sale or property review.

  1. Search the property and identify every open permit.
  2. Gather the permit number, plans, inspection history and other available records.
  3. If documents are missing, request the permit file through the Records section.
  4. Contact Building Permit Resolution Services at 239-252-2493.
  5. Follow the instructions for the required status-change or extension request.
  6. Complete remaining conditions, documents and inspections before requesting final closeout.

Current county procedures generally route extensions, cancellations, changes of contractor and related requests through the Request Changes to Contractor or Permit Status condition in CityView.

See the county’s Building Permit Resolution Services instructions for the current process.

How to Finish and Close the Permit

A passed inspection is not always the final administrative step. Before treating the project as closed, confirm:

  • All required inspections have passed.
  • All permit conditions are resolved.
  • Required final documents have been accepted.
  • All remaining fees have been paid.
  • The required Certificate of Occupancy (CO) or Certificate of Completion (CC) has been issued when applicable.

Once the required inspections are successfully completed, the county directs applicants to contact the inspection/CO staff at inspections@collier.gov when a CO or CC must be requested.

Common Problems That Slow Down a Collier County Permit

Problem Practical next step
Wrong permitting jurisdiction Confirm county vs. Naples vs. Marco Island before submitting.
Wrong permit type Use the project-specific application requirement page rather than guessing from a general category.
Missing plans or forms Compare the correction notice against the exact project’s submittal requirements.
Digital signature problem Confirm the design professional’s digital certificate and electronic signature comply with county requirements.
Inspection cannot be scheduled Check permit status, holds, conditions and contractor-license status.
Notice of Commencement condition open Record the required NOC and upload it to the permit condition.
Old permit appears open Use the correct historical database, then contact Building Permit Resolution Services if it is not properly closed.
Unexpected permit cost Check the current 2026 fee schedule plus any separate impact, fire or development-related fees.

A Simple Permit Checklist Before You Start

  1. Confirm the property is under Collier County permitting jurisdiction.
  2. Check whether the proposed work needs a permit or qualifies for a documented exemption.
  3. Select the correct permit category.
  4. Read that category’s official submittal requirements.
  5. Check zoning, floodplain, septic, utilities or other site-specific requirements.
  6. Verify contractor licensing or owner-builder eligibility.
  7. Prepare complete plans and supporting documents.
  8. Submit through the current CityView portal.
  9. Watch for fees, conditions and correction letters.
  10. Do not begin regulated construction until the permit is issued.
  11. Schedule inspections at the correct construction stages.
  12. Resolve final conditions and obtain the required CO or CC.

Official Collier County Building Resources

Frequently Asked Questions

1. Where is the Collier County Building Department located?

The primary permitting location is the North Horseshoe Campus at 2800 Horseshoe Drive North, Naples, FL 34104. The main building and permitting assistance number is 239-252-2400. Collier County also publishes permitting locations in Immokalee, Everglades City and Heritage Bay.

2. Can I apply for a Collier County building permit online?

Yes. Contractors, design professionals and agents generally submit building applications electronically through the GMCD CityView Public Portal at cvportal.collier.gov/cityviewweb. Qualifying owner-builders have additional in-person signing and notarization requirements.

3. How do I check my Collier County building permit status?

For permits from 2011 to the present, open CityView. Search by property address or choose Status and Fees and enter the permit number. Review the permit’s status, conditions, fees and inspection information rather than relying only on an email notification.

4. How do I schedule a Collier County building inspection?

Schedule through CityView or call the automated inspection system at 239-252-3726. Next-business-day requests can currently be made until 4:00 p.m.; requests made after that cutoff are moved to the subsequent business day.

5. Is work under $7,500 automatically exempt from a building permit in Collier County?

No. Beginning July 1, 2026, certain work under $7,500 may qualify, but the exemption is limited and requires county review. Among other conditions, it applies to qualifying detached single-family property, excludes structural and regulated trade work, and cannot be used for property in a flood hazard area. An approved exemption letter must be obtained.

6. Which building code does Collier County use in 2026?

As of October 2026, Collier County identifies the Florida Building Code, 8th Edition (2023), effective December 31, 2023, as the current edition. Local ordinances and project-specific requirements may also apply.

7. How long is a Collier County building permit valid?

The county states that a building permit is generally valid for 180 days after issuance. A passed inspection can extend the permit for another 180 days. Do not assume a payment, revision or merely scheduling an inspection extends the expiration date.

8. Does the Collier County Building Department handle permits inside Naples and Marco Island?

Not generally. The City of Naples and the City of Marco Island operate their own building-permitting systems. Confirm the actual jurisdiction of the property before submitting an application. Everglades City has an interlocal arrangement with Collier County for building services.

9. Can a homeowner get an owner-builder permit in Collier County?

A qualifying property owner may act as an owner-builder subject to Florida law and county requirements. Collier County requires the owner-builder application to be personally signed in accordance with its permitting procedures. Owner-builder status does not waive plans, codes, inspections or other project requirements.

10. What should I do about an old or expired Collier County permit?

Search the permit using the system appropriate to its age, gather the available records and contact Building Permit Resolution Services at 239-252-2493. Depending on the permit, you may need an extension, updated documents, inspections, a contractor change or formal closeout.

Before You Submit

The easiest way to avoid a permit problem is to get the first few decisions right: confirm jurisdiction, choose the exact permit type, read the project’s checklist and resolve flood, zoning or ownership issues before uploading plans. Once those pieces are clear, the rest of the process becomes much easier to follow.

If you also work in other Florida jurisdictions, requirements can be very different from Collier County. Our guides to Brevard County building permits, the Boca Raton Building Department, Baker County permitting, and the Atlantic Beach Building Department explain those separate local processes.

Information reviewed October 23, 2026. USBuilding.org is an independent informational resource and is not operated by Collier County Government. Permit requirements, office hours, fees, forms and inspection procedures can change. Use the linked official county service for the final application, payment or project-specific decision.