Contra Costa County Building Department 2026: Permits, Inspections & Services

Contra Costa County Building Permits, Inspections & Permit Help

If you are planning a remodel, addition, ADU, new home, electrical upgrade, grading work, solar installation or another construction project in Contra Costa County, the first thing to confirm is which building department actually serves your property. That one check can save a surprising amount of time.

Quick answer: Contra Costa County’s Department of Conservation and Development provides building permit and inspection services for unincorporated Contra Costa County and also provides building services for Clayton, Hercules, Lafayette, Moraga and Orinda. Other incorporated cities generally use their own building departments.

Start Here: Is Contra Costa County Your Building Department?

Contra Costa County has both incorporated cities and unincorporated communities. The County Department of Conservation and Development is the planning agency for unincorporated areas, but its Building Division also performs building permit and inspection work for five contract cities and towns.

Property location Building permit / inspections Planning approval
Unincorporated Contra Costa County Contra Costa County Contra Costa County DCD
Clayton Contra Costa County Building Division City of Clayton
Hercules Contra Costa County Building Division City of Hercules
Lafayette Contra Costa County Building Division City of Lafayette
Moraga Contra Costa County Building Division Town of Moraga
Orinda Contra Costa County Building Division City of Orinda
Other incorporated cities Usually the city’s own building department The applicable city
Do not skip the jurisdiction check. A Contra Costa County mailing address does not automatically mean that the County Building Division issues your permit. For example, construction inside Antioch city limits is handled by the City of Antioch. See our Antioch building permit and inspection guide if that is where your property is located.

How to check your jurisdiction

  1. Open the County’s CCMAP property map.
  2. Search your street address or parcel.
  3. Confirm whether the parcel is inside an incorporated city or an unincorporated area.
  4. If it is one of the five contract cities above, contact that city’s Planning Department first when planning approval is required.
  5. Use the County ePermits system for the building permit when Contra Costa County is the building authority.

Contra Costa County Building Department Contact Information

Official department Contra Costa County Department of Conservation and Development
Building services Building Inspection / Application and Permit Center
Address 30 Muir Road, Martinez, CA 94553
Application & Permit Center 925-655-2700
DCD main phone 925-655-2774
Toll free 1-855-323-2626
TTY 711
Monday–Thursday 7:30 a.m.–5:00 p.m.
Friday 7:30 a.m.–4:00 p.m.
Public counter Appointment-based service; check availability before visiting

For a project-specific question, have your property address, permit/application number if one exists, and a short description of the work ready before calling. It helps staff identify the correct permit path much faster.

Do You Need a Building Permit?

Contra Costa County states that almost all construction projects require some form of permit. Common examples include new structures, additions, remodels, demolition, grading, electrical work, panel upgrades, plumbing and gas work, decks, garages, pools, ADUs, solar systems, battery storage and backup generators.

Project What to expect
New home Planning approval, full building plans, plan review and multiple inspections
Room addition Building permit, planning review and structural/energy documents may apply
Kitchen or bathroom remodel Permit commonly required when plumbing, electrical, mechanical or structural work is involved
Electrical panel upgrade Building/electrical permit process applies
HVAC replacement Mechanical and energy-code requirements may apply
Roof replacement Check the County’s residential reroof requirements
ADU or JADU Planning approval and building permit are required
Solar / battery / generator Use the applicable County power-permit process; qualifying solar may use SolarAPP+
Grading / excavation A separate grading permit may be triggered by depth, volume, fill or site conditions
Pool or spa Building and safety requirements apply; additional agency review may be needed

Work that may be exempt

The County currently links a residential “work not requiring a building permit” handout. Examples in that handout include certain small detached accessory structures, limited fence work, cosmetic finish work, qualifying low decks and some minor site improvements.

  • One-story detached accessory structures within the stated size limits.
  • Certain fences within the applicable height limit.
  • Painting, wallpaper, tile, carpet, cabinets, countertops and similar finish work.
  • Certain detached residential decks that meet size, height and attachment restrictions.
  • Some sidewalks, driveways and small retaining walls when all stated conditions are met.
Important 2026 note: the exemption PDF currently linked by the County still contains references to the older 2022 California Residential Code. New 2026 projects are under the 2025 California Building Standards Code cycle. Use the handout as a starting point, but confirm the exemption with the Building Division before relying on it—especially for structural, electrical, plumbing, mechanical, zoning or grading work.

How to Apply for a Contra Costa County Building Permit

Contra Costa County uses a 100% digital permit application process for Building, Planning and Public Works applications. You normally submit the building application, plans and supporting documents through the County’s ePermits Center instead of delivering a paper plan set to the counter.

  1. Confirm the correct jurisdiction.
    Check CCMAP first. If your property is inside an incorporated city that does not use County building services, stop and use that city’s permit process.
  2. Complete required planning approval first.
    New residential units, ADUs, new buildings, changes of use and many exterior changes need planning review before building-permit processing.
  3. Prepare the complete project documents.
    Collect the plans, structural information, Title 24 documents, CALGreen information and project-specific reports required for your scope.
  4. Create or sign in to your ePermits account.
    Open the official Contra Costa County ePermits Center.
  5. Start the correct Building Permit application.
    Enter the project address, applicant information, project description and other requested details.
  6. Upload your plans and documents.
    Make sure the files represent the complete proposed scope. Missing sheets are a common reason an application cannot move cleanly into review.
  7. Watch for the completeness review.
    Staff may ask for missing information. Respond through the assigned permit process rather than starting a duplicate application.
  8. Pay plan-check fees when invoiced.
    Once the application is sufficiently complete, an official permit record is created and applicable review fees are invoiced.
  9. Respond to plan-check comments.
    Upload corrected plans and written responses when requested. Keep revisions coordinated so plans, calculations and supporting documents agree with one another.
  10. Pay issuance fees and download the approved permit documents.
    Do not begin regulated construction until the permit has actually been issued.
Simple way to avoid delays: prepare the submission around the County’s checklist, not around what your contractor or designer normally submits in another city. Local drainage, grading, fire, septic and planning requirements can add documents that are easy to miss.

Residential Plan Documents You May Need

The County’s residential plan-submittal checklist is detailed. Not every item applies to every project, but a full residential submission may require much more than a basic floor plan.

  • Site / plot plan: property lines, north arrow, setbacks, streets, easements, existing and proposed structures and nearby trees.
  • Floor plans: room uses, dimensions, walls, doors, windows, stairs, decks and landings.
  • Roof plan and elevations: roof configuration, pitch, exterior materials and building height.
  • Mechanical information: HVAC equipment, registers and return-air locations where applicable.
  • Electrical information: outlets, lights, switches, panels, amperage and smoke-alarm locations.
  • Plumbing information: water heaters, sinks, toilets, showers, tubs and other fixtures.
  • Building sections and construction details necessary to explain the work.
  • Title 24 energy compliance documentation when required.
  • CALGreen documentation for applicable new construction, additions or alterations.
  • Structural drawings and calculations when engineered design is required.
  • Foundation and framing plans for structural work.
  • Soils / geotechnical information when required.
  • Septic approval from Environmental Health when the property uses a septic system.
  • Fire-district review when the project triggers local fire requirements.
  • Drainage, stormwater or grading documents when the site or project crosses the applicable thresholds.
  • Floodplain or encroachment approval when Public Works requirements apply.

The checklist also notes that specific school districts may collect impact fees for qualifying new dwellings or larger additions. Other agency charges and approvals can therefore be separate from the basic building permit.

Drainage, Grading, Fire and Other Approvals

A building permit does not always stand alone. Depending on the site, scope and location, your project may need review from several agencies before permit issuance or final approval.

Issue Why it may matter
Planning Zoning, setbacks, use, design and new dwelling-unit approvals
Grading Excavation, fills, slopes, earthwork volume and related site work can trigger a grading permit
Drainage New impervious surfaces, steep sites, watercourses, flooding or land disturbance may trigger drainage review
Public Works Driveway curb cuts, encroachments, floodplain work and public right-of-way work
Fire district New residential/commercial buildings, changes of use and some additions or remodels
Environmental Health Septic systems, wells and certain health-regulated projects
Water / sanitary district Utility connections, capacity and project-specific development requirements
School district Development impact fees may apply to qualifying construction

Contra Costa County Building Permit Fees

There is no single flat building permit price. Contra Costa County states that building permit fees are generally tied to the project’s valuation, while other charges depend on the type of review and agencies involved.

Possible charges include:

  • Plan-check fees
  • Building permit and inspection fees
  • Electrical, mechanical and plumbing fees
  • Energy and accessibility review charges
  • Grading permit and grading inspection fees
  • Drainage review and inspection
  • Construction/debris recovery charges
  • Land-development surcharges
  • Fire district, school district or other agency impact fees when applicable

For a project-specific estimate, the County directs applicants to its current permit status, fee and payment page or to the Application and Permit Center at 925-655-2700.

Online payment convenience fees

The County’s current payment page states that online credit-card payments are subject to a 2.75% convenience fee with a $1 minimum, while e-check payments have a $2.50 convenience fee. These processing charges are separate from County permit fees. In-office cash or check payment can avoid the online convenience fee.

Payment safety: Contra Costa County warns that it does not request credit-card or bank information by phone or email to collect permit fees and does not request wire transfers. Use the official ePermits portal or an authorized County payment method.

How to Check a Building Permit Status

  1. Open the official ePermits Center.
  2. Select the Building area.
  3. Choose the application/record search option.
  4. Search using the project address or building permit/application number.
  5. Open the matching record and review current workflow, fees, permit history and inspection information.

County building permit record numbers commonly use a BI prefix. When contacting staff, include the exact permit number whenever possible.

How to Schedule a Contra Costa County Building Inspection

Building inspections can be scheduled online through ePermits or by using the County’s automated inspection phone system.

Online inspection scheduling Contra Costa County Inspections
Automated inspection phone 925-646-4108
Same-day phone request cutoff 5:30 a.m., Monday–Friday, through the automated system
Daily schedule posting After approximately 8:45 a.m. on the current business day
Inspection window The County publishes approximately 3-hour time frames

The County states that online inspection scheduling does not require registration. The ePermits record can also display inspection status and permit history.

What must be ready on inspection day

  • Building permit available at the job site.
  • Reviewed and approved/stamped building plans available.
  • A representative age 18 or older present to meet the inspector.
  • The requested work completely ready for inspection.
  • Earlier correction items fixed.
  • Clear access to the area being inspected.

If the inspector cannot inspect because work is not ready, plans are missing, corrections remain unresolved or access is unavailable, a reinspection fee may be assessed.

Which Building Codes Apply in Contra Costa County in 2026?

For the 2026 code cycle, Contra Costa County adopted the 2025 California Building Standards Code with applicable County changes, additions and deletions through Ordinance No. 2025-19. The statewide 2025 code cycle became effective January 1, 2026.

Depending on the project, applicable Title 24 parts can include:

  • California Building Code
  • California Residential Code
  • California Electrical Code
  • California Mechanical Code
  • California Plumbing Code
  • California Energy Code
  • California Wildland-Urban Interface Code
  • California Fire Code
  • California Existing Building Code
  • California Green Building Standards Code (CALGreen)
  • Contra Costa County Title 7 and applicable local ordinances

For a plain-English explanation of the statewide 2026 code cycle, see our 2026 California Building Code and Title 24 guide. Local amendments and project-specific County requirements still need to be checked after the statewide code.

Permit Expiration, Extensions and Renewals

Permit deadlines are easy to overlook, especially when construction is delayed. Contra Costa County currently publishes the following building-permit timelines:

  • Plan-check application: an application may be considered abandoned after 180 days from filing unless it has been pursued in good faith or a permit has been issued.
  • Issued building permit: the County states that a permit can expire 365 days after issuance without an approved required inspection.
  • A permit can also expire when 365 days pass between approved required inspections.
  • If you need an extension, the County instructs applicants to submit the request 30 days before expiration.

If a permit has already expired, stop regulated work and review the County’s permit-renewal process before continuing.

Common Reasons a Permit Gets Delayed

Problem Better next step
Wrong jurisdiction Verify the parcel in CCMAP before preparing the submission.
Planning approval missing Complete County or city planning review before the building application when required.
Incomplete plan set Use the residential/commercial submittal checklist and show the complete project scope.
Outside-agency approval missing Contact fire, Public Works, Environmental Health, sanitary or water agencies early.
Plan-check comments not fully answered Respond to every correction and coordinate all revised sheets and calculations.
Fee invoice unpaid Check ePermits and pay the required plan-check or issuance invoice.
Inspection not ready Keep the approved plans onsite and confirm the work is accessible before requesting inspection.

For ADUs, Remodels and Home Improvements

Homeowners often arrive at the Building Department website thinking they only need a permit form. In practice, the bigger issue is usually knowing which approvals need to happen before that form.

For an ADU, for example, planning approval comes before the building permit. Septic properties may need Environmental Health review, and fire or utility requirements can also affect the design. A remodel can be simpler, but once structural walls, electrical systems, plumbing, HVAC or exterior changes are involved, the permit scope grows quickly.

For California projects outside the County’s service area, use the building department responsible for that city rather than submitting to Contra Costa County. You can browse other local building department guides on USBuilding.org to find the correct permitting authority.

Before You Submit: 60-Second Checklist

  • Confirm the property jurisdiction.
  • Check zoning and planning requirements.
  • Identify every part of the project—not only the main construction work.
  • Use the current 2026 code cycle.
  • Prepare site, architectural, structural and trade plans as required.
  • Include Title 24 energy and CALGreen documents where applicable.
  • Check grading, drainage, floodplain and Public Works requirements.
  • Check fire district requirements early.
  • Get septic or Environmental Health review when applicable.
  • Upload a complete digital package through ePermits.
  • Save your application / permit number.
  • Watch email and ePermits for correction notices and invoices.

Contra Costa County Building Department FAQs

1. Where is the Contra Costa County Building Department located?

Permit and building services are provided through the Department of Conservation and Development at 30 Muir Road, Martinez, CA 94553. The Application and Permit Center phone number is 925-655-2700.

2. Can I apply for a Contra Costa County building permit online?

Yes. Contra Costa County uses a digital ePermits system for Building, Planning and Public Works applications. Prepare the required documents, create or access your account, submit the correct application and upload your plans electronically.

3. Does Contra Costa County handle building permits for every city in the county?

No. The County provides building permit and inspection services for unincorporated areas and the contract jurisdictions of Clayton, Hercules, Lafayette, Moraga and Orinda. Other incorporated cities generally operate their own building departments.

4. How do I schedule a Contra Costa County building inspection?

Schedule online through the County ePermits/inspection service or use the automated inspection phone system at 925-646-4108. The County states that same-day automated-phone requests are accepted until 5:30 a.m. Monday through Friday.

5. When can I see my inspection time?

The current business day’s inspection schedule is normally posted after about 8:45 a.m. Contra Costa County publishes approximately three-hour inspection time windows.

6. How much does a Contra Costa County building permit cost?

There is no universal flat price. Building permit charges depend on project valuation and the type of plan review, inspections and additional approvals required. Grading, drainage, fire, school and other agency fees may also apply.

7. Which building code is used in Contra Costa County in 2026?

New 2026 projects generally use the 2025 California Building Standards Code, effective January 1, 2026, together with Contra Costa County’s adopted local changes and ordinances.

8. Do I need planning approval before a building permit?

Many projects do. New residential units, ADUs, new structures, changes of use and many exterior changes can require planning approval before the building-permit application proceeds. For the County’s five contract cities, planning approval comes from the city or town rather than County Planning.

9. How can I check my Contra Costa County permit status?

Open the ePermits Center, search the Building records using the property address or permit/application number, then review the available workflow, fee, inspection and permit-history information.

10. How long is a Contra Costa County building permit valid?

The County currently states that an issued building permit can expire after 365 days without an approved required inspection or when 365 days pass between approved required inspections. Applicants needing more time should review extension requirements before the permit expires.

Official Contra Costa County Building Resources

Information reviewed for the 2026 permit and code cycle. USBuilding.org is an independent informational resource and is not affiliated with Contra Costa County. Permit requirements, fees, office procedures and project-specific approvals can change. The responsible government agency makes the final determination for each property and project.

Leave a Comment