Daly City Building Department 2026: Permits, Inspections & Services

Daly City, California • 2026 permit guide • Updated October 24, 2026

Daly City Building Permits, Inspections & Services

If you are remodeling a home, replacing a roof or water heater, adding living space, installing an EV charger, building a deck, or starting a larger construction project in Daly City, the City of Daly City Building Division is normally the office that handles the building permit, plan review, and construction inspections.

Fast answer: Daly City’s Building Division is located at 333 90th Street, City Hall, 2nd Floor, Daly City, CA 94015. The main phone number is 650-991-8061, and the published counter hours are Monday through Friday, 8:00 AM to 5:00 PM. Eligible quick permits and inspections can be handled through the City’s online permit portal.

Daly City Building Division Contact Information

Official office City of Daly City Building Division, Economic & Community Development
Address 333 90th Street, City Hall – 2nd Floor, Daly City, CA 94015
Phone 650-991-8061
Email BuildingDivision@dalycity.org
Fax 650-991-8070
Building counter hours Monday–Friday, 8:00 AM–5:00 PM
Main services Building permits, plan review, inspections, permit records, code administration
Official Building Division page Daly City Building Division
Before visiting City Hall: bring the property address, a clear description of the proposed work, your permit or application number if one already exists, and any drawings or documents related to the project. For a new application, first check whether the project can use the online quick-permit route.

Which Daly City Permit Process Should You Use?

Daly City does not process every construction project the same way. Smaller replacement and remodeling jobs may qualify for a quick permit, while additions and structural work generally need plans and plan review. Some projects also need Planning, Engineering, Fire, or another agency before the building permit can be completed.

Your project Likely starting point What to do
Roof replacement, windows, siding/stucco, garage door Quick permit Check the online permit portal and select the matching permit type.
Residential kitchen or bathroom remodel Quick permit may be available Use the portal if your scope matches the City’s eligible quick-permit category.
Water heater, furnace, selected plumbing/electrical work Quick permit Choose the appropriate trade or replacement permit in the portal.
Electrical service upgrade or residential EV charger Quick permit / streamlined process Apply using the applicable online permit option.
Room addition, new habitable space, moving walls Plan review Prepare plans and submit the application package to the Building Division.
Deck, patio cover, retaining wall Plan review Submit drawings showing the proposed construction and site conditions.
Use permit, design review, front-yard paving, zoning issue Planning Division first Confirm zoning and planning approval before relying on the building-permit process.
Work in street, sidewalk, curb, gutter, driveway approach, public right-of-way Engineering Division Check Engineering requirements in addition to the building permit.

The City’s official quick-permit page lists online options for projects including residential bathroom and kitchen remodels, re-roofing, siding and stucco, windows, garage doors, water heaters, furnaces, electrical service upgrades, EV charging work, and qualifying SolarAPP+ projects. See the official Daly City permits page before choosing the application type.

How to Apply for a Daly City Building Permit

1 Define the work clearly.

Write down the exact project scope: for example, replace a roof, remodel a bathroom, move an interior wall, build an addition, install a new electrical service, or construct a deck. Your scope determines whether you can use a quick permit or need full plan review.

2 Check zoning or Planning requirements before preparing expensive plans.

Additions, changes in use, exterior development, front-yard paving, design-review projects, and other work can involve the Planning Division. For zoning assistance, call 650-991-8033 or review Daly City Planning.

3 Choose quick permit or plan-review submission.

For an eligible quick permit, open Daly City’s permit portal, create or sign into your account, select the permit type, enter the property and project information, and complete the requested application fields. The City recommends Microsoft Edge for the best portal compatibility.

4 If plans are required, prepare the full application package.

Daly City’s plan-review instructions call for the Building Permit Application, payment authorization, drawings/plans and calculations or other supporting documents as applicable. Start with the official forms page.

5 Submit the plan-review package to the Building Division.

The City’s published process directs applicants to email plan-review submittals to BuildingDivision@dalycity.org. Large files may be supplied using a downloadable cloud-storage link when necessary.

6 Respond to corrections without changing the project informally.

If reviewers issue comments, revise the drawings and documents to address each item, then send the resubmittal through the Building Division’s instructed process. Keep file names and revision dates easy to identify.

7 Pay the final permit invoice and obtain the issued permit.

After approval, the City provides the approved digitally stamped plans and instructions for any remaining items. Do not start regulated construction simply because plans were submitted or reviewed; wait until the required permit has actually been issued.

What Information Is on the Building Permit Application?

Preparing this information before you start can prevent a frustrating incomplete application. Daly City’s current Building Permit Application asks for:

  • Project address.
  • Description of the proposed work.
  • Project valuation.
  • Whether the property is residential or commercial.
  • Whether the building is sprinklered.
  • Applicant or agent name and contact information.
  • Property-owner information.
  • Architect, designer, or engineer information when applicable.
  • Contractor name and California contractor-license information.
  • Workers’ compensation declaration.
  • Owner-builder declaration when the property owner qualifies and chooses that route.
  • Required signatures and certifications.

You can review the official Daly City Building Permit Application before submitting.

Documents You May Need

Basic permit documents
  • Building Permit Application
  • Project description and valuation
  • Owner and applicant information
  • Contractor information
When plans are required
  • Existing and proposed floor plans
  • Site plan when relevant
  • Structural details or calculations
  • Energy / Title 24 documents
Project-specific forms
  • CALGreen checklist
  • Owner-Builder Disclosure Form
  • Re-roofing application
  • EV charging checklist
Waste-management requirement

The City’s forms page identifies a Construction & Demolition Waste Management Plan for projects with valuations over $30,000.

Plans do not automatically have to be professionally stamped for every small project, but some projects do require an architect or engineer because of structural complexity, occupancy, design, or state-law requirements. Confirm this before paying someone to prepare the wrong type of plan set.

How Long Does Daly City Plan Review Take?

Daly City’s plan-review page states that an initial plan submittal is generally reviewed within 15 working days from the date it is routed. However, the Building Division currently warns that initial reviews may take longer than normal because of application volume and staffing.

Planning a construction start date? Do not schedule demolition, contractor mobilization, material delivery, or financing deadlines around a guaranteed 15-day approval. That period is a general initial-review target, not a promise that a permit will be issued within 15 working days. Corrections and other departmental reviews can add time.

Official instructions: Permits Involving Plans.

Daly City Building Permit Fees in 2026

Daly City’s building fees are not one flat price. The final amount can include the building permit fee, plan-review charges, electrical/mechanical/plumbing fees, technology charges, Planning or Engineering review, state surcharges, construction-and-demolition deposits, and project-specific fees.

As of October 2026, the City’s current published schedule is the FY 2026–27 / FY2027 Master Fee Schedule. Selected Building Division entries include:

Fee item Current published FY2027 amount / basis
Building permit – first $2,000 of applicable valuation $140 base
Additional valuation from $2,001 through $25,000 $15.94 per additional $1,000 or fraction
Building Division plan review 79% of building permit fee
Additional plan review $181 per hour
Planning Division plan review, when applicable 20% of building permit fee
Engineering Division plan review, when applicable 39% of building permit fee
Technology fee 9% of building permit fee
General Plan maintenance fee 1% of project valuation
Electrical permit issuance $101
Mechanical permit issuance $101
Plumbing permit issuance $101
Inspection outside normal business hours $210 per hour, 2-hour minimum
Work without a required permit Penalty listed as 2× permit fee
Permit extension / expired permit reactivation $187 hourly rate
Residential Requirements Report (3R) $127 per report

Some construction-and-demolition projects also have refundable security deposits. The current schedule lists, for example, a 3% valuation deposit for qualifying new residential or commercial construction and certain larger alterations, and a $3,000 deposit entry for roof construction. Eligibility, refunds, and other charges depend on the project.

Use the City’s current FY2027 Master Fee Schedule for budgeting, but treat the City’s actual permit invoice as the controlling amount.

How to Schedule a Daly City Building Inspection

Construction that requires a permit must be inspected at the appropriate stages. Work that needs inspection should remain visible and accessible until the inspector approves it.

For permits eligible for online inspection scheduling

  1. Open Daly City’s permit portal.
  2. Sign in to the account associated with the permit.
  3. Open the permit record.
  4. Look for the Schedule Inspection option.
  5. Select the available inspection type and submit the request.
  6. On the inspection date, check the City’s portal after 8:00 AM for the current estimated arrival time.

Daly City currently lists online inspection scheduling for eligible quick permits such as residential kitchen and bathroom remodels, water-heater and furnace replacements, windows, siding/stucco, garage doors, EV chargers, electrical service upgrades, and certain commercial quick permits.

If online scheduling is not available

Call 650-991-8061 or email BuildingDivision@dalycity.org at least two days before the inspection is needed.

Include all five of these details:

  1. Correct permit number.
  2. Job-site address.
  3. Name of the job-site contact.
  4. Contact phone number.
  5. Type of inspection requested.
Do not cover the work too early. Framing, wiring, plumbing, insulation, underground piping, and other concealed work may have to remain exposed until the required inspection is approved. Covering it first can create avoidable delays and additional work.

Typical Building Inspection Stages

The exact sequence depends on the project, but Daly City identifies common inspections including:

  • Foundation / footing inspection.
  • Under-floor framing or plumbing where applicable.
  • Framing inspection.
  • Rough plumbing, electrical, and mechanical inspection.
  • Blind-wall inspection where applicable.
  • Insulation inspection.
  • Drywall / sheetrock inspection.
  • Final inspection.

At a typical framing inspection, rough plumbing, electrical, and mechanical work may also be reviewed. For detailed preparation requirements, use the City’s Building Project Inspections guide.

Who Inspects Water, Sewer, Fire & Right-of-Way Work?

Not every inspection is performed by the Building Division. This distinction matters because calling the wrong office can cost you a day or more on an active job.

Work / agency Published contact
Building Division 650-991-8061
Engineering Division 650-991-8064
North County Fire Authority / Fire inspection 650-800-6580
Bayshore Sanitary District, where applicable 415-467-1144

The Engineering Division handles items such as the water service from the street to the meter, sewer work in the public right-of-way, and certain street, curb, sidewalk, gutter, and driveway-approach inspections. The Building Division handles applicable private-side building plumbing and other permitted construction.

Final Inspection: Do Not Skip This Step

Getting the permit is only the beginning. Daly City requires a final inspection when permitted work is complete. For new construction and a remodel that changes occupancy, a Certificate of Occupancy may be issued when applicable. For many other projects, the signed job card is the record showing that the permitted work reached final approval.

If your contractor says a project is finished, ask to see the final inspection status or signed job card. A permit that was opened but never finalized can become an unpleasant surprise during a refinance, property sale, insurance question, or future remodel.

2026 Daly City Construction Hours

Daly City adopted construction-hour rules in 2026 for outdoor work on private property requiring a building permit. The City’s current handout gives the following general schedule:

Day Standard Time Daylight Saving Time
Monday–Friday 8:00 AM–6:30 PM 8:00 AM–8:30 PM
Saturday–Sunday 9:00 AM–6:30 PM 9:00 AM–8:30 PM
Federal holidays Construction prohibited unless an exemption is approved by the Building Official or designee.

The handout also states that material and equipment deliveries are not permitted outside the allowed construction hours. Site staging may begin up to one hour earlier only when construction equipment is not being operated. Projects subject to the ordinance may also need construction-hours signage visible from the street.

Read the official Construction Hours Handout before arranging weekend or evening work.

Which Building Codes Apply in Daly City in 2026?

Daly City adopted the 2025 California Building Standards Code with local amendments, effective January 1, 2026. Applications deemed complete before January 1, 2026 may continue under the code applicable when the application was deemed complete.

The City’s current adopted-code list includes:

  • 2025 California Administrative Code.
  • 2025 California Building Code.
  • 2025 California Residential Code.
  • 2025 California Electrical Code.
  • 2025 California Mechanical Code.
  • 2025 California Plumbing Code.
  • 2025 California Energy Code.
  • 2025 California Fire Code.
  • 2025 California Existing Building Code.
  • 2025 California Green Building Standards Code (CALGreen).
  • 2025 California Reference Standards Code.
  • 2024 International Property Maintenance Code.
  • California Code of Regulations Title 25 where applicable.

Daly City’s local amendments still matter, so a statewide code book alone is not the full answer. Start with the City’s Adopted Codes page and see our California Building Code 2026 guide for a plain-English explanation of the statewide Title 24 code cycle.

Owner-Builder Permits in Daly City

A property owner may be able to obtain a permit as an owner-builder, but this route transfers significant responsibility to the owner. Daly City warns homeowners to consider construction experience, project management, worker safety, liability, scheduling, and code compliance before choosing this option.

If you proceed as an owner-builder, complete the required permit application and Owner-Builder Disclosure Form. Review the City’s Owner-Builder Permit guidance before signing the declaration.

Do not agree to pull an owner-builder permit simply because an unlicensed person tells you it will save money. The person named as the owner-builder can assume legal and project responsibilities that would normally fall on a licensed contractor.

Contractor Licensing & Daly City Business License

Contractors performing work in Daly City may also need an active Daly City business license. California’s current Contractors State License Board rule generally requires a contractor license when the work requires a building permit, employee labor is used, or the combined labor-and-material contract is $1,000 or more.

That current statewide $1,000 threshold is important because some older local web text may still reference the former $500 rule. Permit-required work does not become exempt merely because the price is below $1,000. Verify a contractor through the California Contractors State License Board.

Solar Permits & SolarAPP+

Daly City uses SolarAPP+ for qualifying residential rooftop photovoltaic systems. The City’s published program currently applies to eligible PV systems under 10 kW where no battery energy-storage system is proposed.

  1. Create or sign in to your SolarAPP+ account.
  2. Submit the solar project to SolarAPP+ and complete its review.
  3. Pay the separate SolarAPP+ processing charge.
  4. Download the SolarAPP+ approval documents.
  5. Sign into Daly City’s permit portal.
  6. Select the SolarAPP+ permit application.
  7. Upload the approval documents and complete the City permit process.

Commercial solar, systems above the City’s streamlined limit, or projects involving batteries should follow the City’s project-specific process rather than assuming SolarAPP+ applies. See Daly City SolarAPP+.

Roofing Permits

Daly City states that a roofing permit is required for roofing work exceeding one square, or 100 square feet. The City also publishes specific roofing inspection and fire-classification requirements.

Before removing the old roof, review the City’s Roofing Permit & Inspection Requirements. Do not assume that obtaining the roof permit means no inspection is required.

Permit Expiration & Keeping a Project Active

Daly City’s current building-code provisions use time limits for permit applications and issued permits. A general permit application can expire if a permit has not been issued within 180 calendar days unless an approved extension applies. Issued permits can also expire if the authorized work is not started within the applicable time or if the project is suspended or abandoned for the City’s specified period.

If your plans are sitting inactive, construction has stopped, or your permit is approaching its deadline, contact the Building Division before expiration. The current fee schedule includes charges for permit extension and reactivation, and an expired application may need to meet the code in effect when it is resubmitted.

Daly City 3R Report for Property Sales

Daly City requires a Residential Requirements Report, commonly called a 3R report, before the sale of a residential property containing three units or fewer.

The report provides available information about:

  • Permit history.
  • Enforcement history.
  • Zoning history.
  • The City’s determination of the property’s legal use.

The City’s 3R page states that permits issued after January 1989 are included in the permit-history portion. The report is valid for six months, and the City says completed reports are generally returned by email within three working days after the request is received.

The current FY2027 Master Fee Schedule lists the 3R fee at $127. Older City text may still show the prior $124 fee, so use the current portal invoice or current master fee schedule when paying.

Request information: Daly City Residential Requirements Report (3R).

Common Problems & the Fastest Practical Fix

Problem What to do next
You cannot find the correct permit type online Do not select a random category. Contact Building Division with the address and exact work description.
Plans were returned with comments Answer every correction and clearly identify revised sheets before resubmitting.
Plan review is taking longer than expected Check whether another department or correction is pending; the City currently warns of longer-than-normal initial review times.
Inspection option does not appear in the portal Your permit may not be part of the online scheduling pilot. Call or email Building Division at least two days ahead.
Inspector cannot see required work Remove the obstruction or expose the regulated work as directed before requesting reinspection.
You discovered old unpermitted work Contact Building Division before covering, remodeling, or assuming the existing condition can simply remain.
Your permit is near expiration Ask about an extension before it expires instead of waiting until a reactivation is required.
Your project affects the public sidewalk or street Contact Engineering; a building permit alone may not authorize right-of-way work.

Official Daly City Building Resources

If the property is not actually inside Daly City, do not use Daly City’s permit process simply because the mailing address looks nearby. For a project farther north, our San Francisco Building Department guide explains the separate City and County of San Francisco process. For another jurisdiction, start from the US Building permit and department directory.

Daly City Building Department FAQs

1. Where is the Daly City Building Department?

Daly City’s Building Division is at 333 90th Street, City Hall, 2nd Floor, Daly City, CA 94015. The main phone number is 650-991-8061. Published counter hours are Monday through Friday, 8:00 AM to 5:00 PM.

2. How do I apply for a building permit in Daly City?

Eligible quick permits can be submitted through the Daly City online permit portal. Projects requiring plan review generally require the Building Permit Application, supporting plans and documents, and submission through the Building Division’s published plan-review process.

3. Can I get a Daly City building permit online?

Yes, many quick permit types can be started online, including qualifying residential remodels, roofing, replacement work, selected electrical/plumbing/mechanical permits, EV chargers and SolarAPP+ projects. Projects requiring full plan review follow the City’s separate submission instructions.

4. How long does Daly City take to review building plans?

The City says initial plans are generally reviewed within 15 working days from routing, but the Building Division currently warns that initial review times are longer than normal due to application volume. Corrections and multi-department reviews can add additional time.

5. How do I schedule a Daly City building inspection?

Eligible quick permits can use online inspection scheduling through the permit portal. If the permit is not eligible, call 650-991-8061 or email BuildingDivision@dalycity.org at least two days before the requested inspection and provide the permit number, job address, contact name, phone number and inspection type.

6. What inspections are usually required?

Common inspections include foundation, under-floor work, framing, rough electrical/plumbing/mechanical, insulation, drywall and final inspection. The exact sequence depends on the approved project.

7. How much is a Daly City building permit?

There is no single permit price. Fees depend on project valuation, permit type, plan review, trade permits and other applicable charges. The current FY2027 schedule lists a $140 base for the first $2,000 of applicable building valuation and a Building Division plan-review fee of 79% of the building permit fee where applicable.

8. Which building code does Daly City use in 2026?

Daly City adopted the 2025 California Building Standards Code with local amendments, effective January 1, 2026. The applicable rules may include building, residential, electrical, plumbing, mechanical, energy, fire, existing-building and CALGreen provisions.

9. Can a homeowner pull their own permit in Daly City?

A qualifying property owner may be able to apply as an owner-builder, but must complete the required declarations and accepts significant responsibility for the project. Review Daly City’s Owner-Builder guidance before choosing this route.

10. What are Daly City’s construction hours in 2026?

For covered outdoor private-property construction, the City’s current handout lists Monday–Friday starting at 8:00 AM and weekends starting at 9:00 AM. Work generally ends at 6:30 PM during Standard Time or 8:30 PM during Daylight Saving Time. Federal-holiday construction is prohibited unless the Building Official or designee approves an exemption.

Independent guide: USBuilding.org is not the City of Daly City and does not issue permits or make code interpretations. Permit procedures, fees, portal features and staffing conditions can change. Use the official links above for the final application, payment, inspection request or project-specific determination.