Cook County Building Department 2026: Permits, Inspections & Services

Cook County, Illinois · 2026 Permit Guide

Cook County Building Permits, Inspections & Official Services

The Cook County Department of Building and Zoning handles building permits, plan review, zoning review, construction inspections, certificates of occupancy, contractor registration and code enforcement primarily for unincorporated Cook County and Cook County Forest Preserve properties.

Start here: Before filling out a permit application, confirm that Cook County—not Chicago or a suburban city or village—is actually your permitting authority. This one check can save days of unnecessary paperwork.

Does the Cook County Building Department Handle Your Property?

Cook County Building and Zoning does not issue ordinary building permits for properties located inside the City of Chicago or inside an incorporated suburban municipality. Those properties normally use their own city or village building department.

Use this simple check before doing anything else:

  1. Open the official CookViewer map.
  2. Search the property address or use the property’s Property Index Number (PIN).
  3. Confirm whether the parcel is shown as being in unincorporated Cook County.
  4. Note the township because Cook County inspection assignments are organized by township.
  5. If the parcel is inside a municipality, use that municipality’s building department instead.

For example, incorporated Cook County communities use their own permitting offices. See our guides for the Arlington Heights building department, Berwyn building department, Blue Island building department, or Calumet City building department when your property falls inside those municipal boundaries.

Cook County Building and Zoning Contact Information

Department Cook County Department of Building and Zoning
Main Office 69 W. Washington Street, Suite 2830, Chicago, IL 60602
Main Phone 312-603-0500
General Email info.bnz@cookcountyil.gov
Permit Intake Email intake.bnz@cookcountyil.gov
Permit Corrections / Deficiencies permitcontrol.bnz@cookcountyil.gov
Main Office Hours Monday–Friday, 8:30 a.m.–4:30 p.m.; closed Saturday and Sunday
Skokie Satellite Office 5600 Old Orchard Road, Suite 155, Skokie, IL 60077
Satellite Phone 847-470-3730
Department Head Timothy P. Bleuher, Commissioner

Office information is based on Cook County’s published Building and Zoning information reviewed in October 2026. Holiday closures and staff assignments can change.

What Services Does Cook County Building and Zoning Handle?

For property under its jurisdiction, the department’s work goes well beyond simply issuing a building permit. It reviews proposed construction for zoning and technical compliance and follows the project through required inspections and final approval.

  • Building permit applications
  • Architectural and building-code plan review
  • Electrical and plumbing permit review
  • Zoning review and zoning classification
  • Construction and trade inspections
  • Certificates of occupancy or compliance when applicable
  • Contractor and homeowner-contractor registration
  • Business occupancy approval
  • Multi-dwelling registration
  • Building and zoning violation enforcement
  • Zoning certificates for certain real-estate transactions

Which Projects Need a Cook County Building Permit?

Cook County states that work in unincorporated Cook County generally requires a permit unless it falls within the limited ordinary-repair exception in the County building regulations. Do not assume that a project is permit-free simply because it looks small.

Project 2026 Practical Guidance
New house or building Building permit, zoning review, plans, site documents and multiple trade reviews are normally required.
Addition or major remodel Use the full permit process, especially where structural, electrical, plumbing or HVAC work is involved.
Deck, porch or gazebo Cook County’s e-permit system specifically identifies new decks, porches and gazebos as permit work.
Roof replacement A reroof permit is required. Structural roof repairs or related alterations may require the full permit process.
Window or door replacement The County’s portal states a permit is required for replacement windows and doors in connection with energy-code enforcement.
Fence Use the applicable fence permit requirements and confirm zoning limits, location and property lines.
Driveway / curb cut A driveway permit is required. A new curb cut or apron work in the public right-of-way may also need township highway approval or waiver.
Patio / flatwork Concrete, asphalt, gravel or paver flatwork can fall under the County’s flatwork permit process.
Generator Installation requires a permit.
HVAC replacement Heating, ventilation and air-conditioning work requires Cook County permitting.
Electrical work A supplemental electrical permit application is required for regulated electrical installation, alteration or repair.
Plumbing work A supplemental plumbing application is required for regulated plumbing systems and fixtures.
Swimming pool or spa A permit is required, and Cook County Health Department approval may be required before the Building and Zoning application.
Residential rooftop solar Cook County’s e-permit portal specifically requires a permit for residential rooftop solar installations.
Shed / detached garage New sheds and detached garages require permitting. The County portal also states structures over 144 square feet require electrical service.
Sign Regulated signs require the applicable sign permit and zoning review.
Demolition Requires the appropriate Cook County demolition process plus applicable Environment and Sustainability approval.

Project-specific requirement sheets are available on the official Cook County permit requirements page for decks, fences, reroofs, pools, generators, interior remodeling, site grading, signs, sheds, garages, windows and other common projects.

How to Apply for a Cook County Building Permit

The application path depends on the project. Cook County offers an online e-permit system for many simpler permit categories. Projects outside those categories—or projects combining multiple types of work—should normally follow the full digital-submission process.

  1. Confirm jurisdiction. Search the property in CookViewer and make sure Cook County Building and Zoning is the correct authority.
  2. Find your Property Index Number. A PIN is required for the permit application. It is commonly available from the property-tax record or through CookViewer.
  3. Choose your permit type. Review the project-specific requirements before preparing drawings.
  4. Choose online or full submission. If the project is supported by the e-permit portal, start there. If the work combines multiple permit types or is not offered online, prepare the full application.
  5. Collect supporting documents. Do this before submitting. Missing contractor, survey or plan documents are a common reason a file cannot move cleanly through review.
  6. Submit digitally. Cook County’s current permit-requirements page says permit submissions are digital. The main intake address is intake.bnz@cookcountyil.gov. The current Building Permits page says email attachments may not exceed 25 MB.
  7. Keep the permit number. After intake, the department sends a permit or review number that is used to follow the application.
  8. Wait for the complete review comments. Reviews may involve architecture, electrical, plumbing, zoning and permit control/contractor registration.
  9. Answer deficiencies together where practical. Cook County specifically recommends resolving the majority of review comments in one coordinated response instead of sending corrections piece by piece.
  10. Pay after approval. Once approved, the permit fee is invoiced. Complete the payment and obtain the issued permit before beginning regulated construction.
Important submission note: One County webpage still lists mail/in-person submission information, while the current permit-requirements page says permits must be submitted digitally. For a 2026 application, digital submission is the safest starting point. Call 312-603-0500 before making a special trip with paper documents.

Documents to Prepare Before You Apply

The exact package changes with the project, but the County’s current instructions identify several recurring requirements.

  • Completed building permit application
  • Property address and Real Estate Index Number / PIN
  • Existing and proposed use of the property
  • Detailed scope of work
  • Estimated construction cost
  • Cook County registration information for contractors performing the work
  • Signed letters of intent from contractors
  • Child Support Enforcement Declaration when required for the County privilege
  • Electrical supplemental application when electrical work is involved
  • Plumbing supplemental application when plumbing work is involved
  • HVAC application or technical information where applicable

Additional documents for new construction

  • Plat of survey signed and sealed with a current date; Cook County states it must be less than five years old
  • Site plan showing the proposed project location
  • Architectural drawings signed and sealed by a licensed professional
  • Applicable site-engineering documents
  • Septic-system approval from the Cook County Department of Public Health when the site uses a septic field
  • Water/sewer, well, driveway, fire-district or other outside-agency approvals when applicable
Township review can matter. Cook County’s permit-requirements page publishes additional requirements for projects in Maine, Northfield, Wheeling and Worth Townships. Demolition projects can involve additional township approvals, so check the specific project sheet instead of assuming the general checklist is enough.

E-Permits Available Online

The online system covers a growing group of common projects. The current portal includes categories such as:

  • Decks, porches and gazebos
  • Driveways requiring curb cuts
  • Fences
  • Flatwork
  • Generators
  • HVAC work
  • In-ground and above-ground pools
  • Reroofing
  • Residential rooftop solar
  • Sheds and detached garages
  • Signs
  • Spas
  • Tents
  • Window and door replacement

If your scope combines two or more permit categories, Cook County instructs applicants to use the full permit submission process rather than filing separate e-permits for the same project.

Open the official Cook County E-Permit Portal →

Cook County Building Permit Fees in 2026

Permit cost is not one flat amount. It can depend on building volume, estimated construction cost, electrical circuits or service size, plumbing fixtures, site work and other project details.

Fee / Service Published Amount or Method
Residential permit application deposit $100
Non-residential permit application deposit $500
New construction building permit Published schedule lists a $73.50 minimum, with volume-based calculations for larger projects.
Alterations / remodeling Published schedule lists a $73.50 minimum plus $18.50 for each additional $1,000 of estimated cost over $5,000.
Contractor initial registration $150 per trade
Contractor annual renewal $75 per trade
Business occupancy application $250
Unincorporated residential zoning certificate $100 per lot
Annual building/electrical/plumbing/fire-type inspections Published fee schedule lists $63 per hour, per inspector.

The $100 or $500 building-permit deposit is credited toward the final permit fee. Your final invoice can include several categories, so the sample amounts above should not be treated as a complete project estimate.

Check the official Building and Zoning fee page before paying. Cook County publishes its Chapter 32 fee authority and detailed fee schedule there.

How Permit Review Works

After the application is accepted, Cook County may route it through several review areas. The current building-permit instructions identify five key review functions:

  • Architectural review
  • Electrical review
  • Plumbing review
  • Zoning review
  • Permit control / contractor registration

When reviewers find missing information or code issues, the department sends a deficiency notice. Read the whole notice before responding. Where possible, assemble the corrected plans, documents and explanations together and send the response to permitcontrol.bnz@cookcountyil.gov.

How to Check a Cook County Permit Status

You need two pieces of information:

  1. Your building permit application or permit number.
  2. The property’s Property Index Number (PIN).

Then open the official Building Permit Status Search and enter both numbers.

The status system is used to review application progress and permit information. Cook County states that the database is updated daily. Applicants can also register an email address to receive permit updates.

If you cannot locate your PIN, start with CookViewer or the Cook County Assessor.

Permit Approval and Payment

Approval of an application is not the same thing as merely submitting it. Construction should not start until the required permit has actually been issued.

Once the technical and administrative requirements are satisfied:

  1. The permit is approved for issuance.
  2. An invoice is posted or provided to the applicant.
  3. The applicant pays the balance of the permit fee.
  4. The permit is issued.
  5. Required inspections can then be coordinated as construction reaches each inspection stage.

Online building, plumbing and electrical permit payments are available through Cook County’s permit-status system. Credit/debit-card transactions may include a payment-service convenience fee.

Cook County Building Inspections

Inspections happen during construction—not only when the project is finished. The required inspection sequence depends on the permit and work being performed.

When your permit is issued, Cook County provides the appropriate field inspector information and identifies the stages that need inspection. Do not cover or conceal regulated work before the required inspection.

A typical project may involve applicable inspections such as:

  • Foundation or building work
  • Rough electrical
  • Rough plumbing
  • HVAC / mechanical
  • Building / framing stages
  • Final trade inspections
  • Final building approval

For construction involving site engineering, Cook County also identifies a spot survey and final grade survey as critical submissions during the construction process when applicable.

2026 Field Inspector Phone Directory by Township

The following assignments come from Cook County’s field inspector directory dated July 2026. Your issued permit and current County directory should control if an assignment changes.

Open township inspector directory
Township Building Electrical Plumbing HVAC
BarringtonGerardo Guzman
847-470-5010
Mike Hickey
847-470-5013
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
BloomJorge Herrera
708-974-6268
Dan Leahy
708-974-6665
Paul Tucker
708-974-6278
Pat Gilhooly
708-974-6274
BremenJerry Williams
708-974-6275
Dan Leahy
708-974-6665
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
CalumetJorge Herrera
708-974-6268
Dan Leahy
708-974-6665
Paul Tucker
708-974-6278
Pat Gilhooly
708-974-6274
Elk GroveDemarus Rogers
847-470-5011
Mike Hickey
847-470-5013
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
HanoverGerardo Guzman
847-470-5010
Mike Hickey
847-470-5013
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
LemontThomas Gill
708-974-6269
Dan Griffin
847-470-5009
Paul Tucker
708-974-6278
Pat Gilhooly
708-974-6274
LeydenGerardo Guzman
847-470-5010
Mike Hickey
847-470-5013
Juan Ramirez Jr.
847-470-5018
Patrick Gilhooly
708-974-6274
LyonsThomas Gill
708-974-6269
Dan Griffin
847-470-5009
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
MaineDemarus Rogers
847-470-5011
Nick Pecora
847-470-5007
Juan Ramirez Jr.
847-470-5018
Brad Nance
847-470-5006
New TrierGerardo Guzman
847-470-5010
Nick Pecora
847-470-5007
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
NilesIvan Hernandez
847-470-5017
Nick Pecora
847-470-5007
Juan Ramirez Jr.
847-470-5018
Brad Nance
847-470-5006
NorthfieldIvan Hernandez
847-470-5017
Nick Pecora
847-470-5007
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
NorwoodIvan Hernandez
847-470-5017
Nick Pecora
847-470-5007
Juan Ramirez Jr.
847-470-5018
Brad Nance
847-470-5006
OrlandJerry Williams
708-974-6275
Dan Leahy
708-974-6665
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
PalatineGerardo Guzman
847-470-5010
Mike Hickey
847-470-5013
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
PalosThomas Gill
708-974-6269
Dan Leahy
708-974-6665
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
ProvisoDemarus Rogers
847-470-5011
Dan Griffin
847-470-5009
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
RichJerry Williams
708-974-6275
Dan Leahy
708-974-6665
Paul Tucker
708-974-6278
Pat Gilhooly
708-974-6274
SchaumburgDemarus Rogers
847-470-5011
Mike Hickey
847-470-5013
Chris Heneghan
847-470-5005
Brad Nance
847-470-5006
StickneyJorge Herrera
708-974-6268
Dan Griffin
847-470-5009
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274
ThorntonJorge Herrera
708-974-6268
Dan Leahy
708-974-6665
Paul Tucker
708-974-6278
Pat Gilhooly
708-974-6274
WheelingIvan Hernandez
847-470-5017
Mike Hickey
847-470-5013
Juan Ramirez Jr.
847-470-5018
Brad Nance
847-470-5006
WorthJorge Herrera
708-974-6268
Dan Leahy
708-974-6665
Dennis Lenihan
708-974-6282
Pat Gilhooly
708-974-6274

Current County directory also lists Thomas Gill as Interim Chief Building Inspector, Dan Griffin as Chief Electrical Inspector, Paul Tucker as Chief Plumbing Inspector and John Brolick as Elevator Inspector.

View the official July 2026 field inspector directory →

Building Codes Used in Cook County in 2026

Cook County’s published regulatory-code notice identifies the principal locally adopted model codes for unincorporated Cook County. State requirements can also apply and may supersede an older local reference when Illinois updates a statewide code.

Code Area 2026 Reference
Building 2021 International Building Code provisions with Cook County amendments
Residential 2021 International Residential Code provisions with Cook County amendments
Mechanical 2021 International Mechanical Code provisions with Cook County amendments
Fire 2021 International Fire Code provisions with Cook County amendments
Existing Buildings 2021 International Existing Building Code provisions with Cook County amendments
Electrical 2014 Cook County Electrical Code
Plumbing Illinois Plumbing Code requirements; Cook County’s published code notice references the 2014 State of Illinois Plumbing Code
Energy 2024 Illinois Energy Conservation Code, based on the 2024 IECC with Illinois amendments, effective statewide November 30, 2025
2026 energy-code update: An older Cook County code-posting document references the 2021 Illinois energy code because that was the statewide code at the time the notice was updated. Illinois subsequently adopted the 2024 Illinois Energy Conservation Code, effective November 30, 2025. For permits submitted in 2026, use the current state energy-code requirements rather than relying on an older County PDF.

Illinois also introduced statewide baseline structural-code requirements beginning January 1, 2025. Local jurisdictions that maintain their own codes must satisfy the applicable state baseline rules while continuing to administer their local amendments.

Review Cook County Ordinances and Codes and the Illinois Energy Conservation Code for current technical references.

Contractor Registration

Contractors performing work in unincorporated Cook County must register with the Cook County Department of Building and Zoning. The County also provides a homeowner registration path for owners who personally perform regulated work.

The current online registration system lists an initial fee of $150 per trade and a renewal fee of $75 per trade. Some trades require additional licenses, insurance, certification or other documents.

General contractor registration requirements include proof of business information and insurance. Cook County’s published requirements call for at least $1,000,000 in general liability coverage for general contractor registration.

View official contractor registration requirements →

Business Occupancy and Certificate of Occupancy

A business in unincorporated Cook County may need a business occupancy approval before a new use begins or an existing use changes. Construction or remodeling needed for the business may also trigger a separate building permit.

Cook County’s published business occupancy fee is $250. Home-based businesses use a separate affidavit process, and the County states there is no fee for that home-based business request.

After applicable construction and inspections are complete, the department issues the appropriate occupancy approval when all requirements have been satisfied.

Open Cook County Business Occupancy information →

Zoning Classification and Zoning Certificates

If you need to know how an unincorporated parcel is zoned, Cook County provides an online zoning-classification search using the property’s PIN.

For certain residential real-estate transactions in unincorporated Cook County, a zoning certificate is also required before closing. The County’s online zoning-certificate service states:

  • It applies to qualifying residential property in unincorporated Cook County.
  • It is not required for commercial or industrial properties or individual condominium units under that service.
  • The published fee is $100 per lot.
  • The County asks applicants to allow up to five business days for the certificate to be emailed.

Apply for an official zoning certificate →

Multi-Dwelling Registration

Cook County maintains a registration program for qualifying multi-unit residential buildings in unincorporated areas. The department’s current service page lists an initial registration fee of $105 and an annual renewal fee of $52.50.

Ownership changes can trigger a new registration requirement. If your property is near the unit-count threshold, confirm applicability directly with the department because condominium and multi-dwelling rules can depend on the building configuration.

Review multi-dwelling registration →

Building or Zoning Violations

If you receive a Cook County Building and Zoning violation notice, do not ignore it. The County’s violation guidance states that cited properties generally must be brought into compliance within 30 days, and a permit, occupancy application, rezoning request or other corrective action may be required.

For violations that require a reinspection, use the inspector named on your notice or contact inspections.bnz@cookcountyil.gov or violations.bnz@cookcountyil.gov.

Cook County’s enforcement page states that ordinance violations can carry fines from $100 to $1,000 per offense, and each day a violation continues may constitute a separate offense under the cited County provision.

Read the official violation process →

Demolition Projects Need Extra Coordination

Demolition is not handled like a simple repair permit. For a structure in unincorporated Cook County, use the Building and Zoning demolition application and coordinate the additional environmental approval required by Cook County.

The published demolition application asks for items including:

  • Property and PIN information
  • Survey or site plan identifying the structure
  • Demolition contractor information
  • Utility disconnection information
  • Applicable plumbing or well/septic information
  • Environment and Sustainability demolition approval
  • Additional township or Illinois EPA documentation when applicable

Review Cook County demolition permitting →

How to Extend a Building Permit

Cook County’s published permit guidance states that a permit is valid for one year from its issuance date. If the work cannot be completed in time, do not simply keep working under an expired permit.

The County’s current extension instructions ask for a written request containing:

  • Permit number
  • Property address
  • Length of extension requested
  • Reason the work was not completed
  • Description of work that remains
  • Applicant contact information

Review the current Building Permits page before sending the request because the designated staff contact can change.

Permit payment scam warning: Cook County has posted an FBI warning about criminals impersonating government officials and sending fraudulent planning or permit-payment requests. If you receive an unexpected payment demand, do not rely on the link in the message. Open the official Cook County permit-status or department website yourself and verify the invoice there.

Before You Submit: A Practical Checklist

  • Confirm the property is unincorporated.
  • Find the PIN and township.
  • Choose the correct permit type.
  • Read the specific project requirement sheet.
  • Check zoning and setbacks before finalizing plans.
  • Make sure every contractor is properly registered with Cook County.
  • Collect signed letters of intent.
  • Prepare plans, survey and site documents in clear PDF format.
  • Get outside-agency approvals early if your project involves septic, wells, roads, floodplain, wetlands, fire districts or demolition.
  • Submit one complete package rather than sending missing documents later.
  • Save your permit number and PIN together.
  • Do not start regulated work until the permit is issued.
  • Arrange required inspections before concealing work.
  • Complete final inspections and obtain final occupancy/compliance approval where required.

Frequently Asked Questions

1. Does the Cook County Building Department issue permits for Chicago?

No. The Cook County Department of Building and Zoning primarily handles unincorporated Cook County and Forest Preserve properties. Building permits inside the City of Chicago are handled by Chicago’s own permitting authority.

2. How do I know if my property is in unincorporated Cook County?

Search the address or PIN in the official CookViewer mapping system. Confirm jurisdiction before applying because suburban municipalities generally issue their own permits.

3. Can I apply for a Cook County building permit online?

Yes, several common project types are available through the County’s e-permit portal. Projects not offered in the portal, or projects combining multiple permit categories, should normally use the full digital submission process.

4. What documents are needed for a Cook County building permit?

Common requirements include the permit application, PIN, detailed scope of work, contractor information and letters of intent. New construction can also require a current signed and sealed survey, site plan, sealed architectural drawings and applicable outside-agency approvals.

5. How much is a Cook County building permit?

The final fee depends on the project. Cook County currently requires a $100 residential application deposit or $500 non-residential deposit. The deposit is applied toward the final permit charge. Building, electrical, plumbing and other fees are calculated under the County fee schedule.

6. How do I check my Cook County permit status?

Use the official Building Permit Status Search. You need the permit application or permit number and the property’s PIN. The County states that the status information is updated daily.

7. How do I schedule a Cook County building inspection?

After permit issuance, use the field inspector assigned to your township and inspection discipline. Your permit information identifies the required inspection stages. The County also publishes a current township inspector directory.

8. What building codes does Cook County use in 2026?

Cook County’s published code framework includes the 2021 IBC, IRC, IMC, IFC and IEBC with local amendments, the 2014 Cook County Electrical Code and applicable Illinois plumbing requirements. The current statewide energy standard in 2026 is the 2024 Illinois Energy Conservation Code, effective November 30, 2025.

9. Can a homeowner pull their own Cook County permit?

A homeowner can be involved as the permit applicant and may perform permitted work, but the County requires homeowners performing regulated work to follow its homeowner-contractor registration requirements. Trade-specific licensing or registration requirements can still apply.

10. How long is a Cook County building permit valid?

Cook County’s published permit tips state that a building permit is valid for one year from the date of issuance. If more time is needed, request an extension through the department and provide the permit number, property address, reason, requested extension period and remaining work.

Official Cook County Resources

Information reviewed: October 23, 2026. USBuilding.org is an independent informational resource and is not affiliated with Cook County Government. Permit requirements, fees, staff assignments, codes and online systems can change. For a project-specific decision, the current instructions of Cook County and other authorities having jurisdiction control.