Gilroy Building Permits, Inspections & Permit Help
If you are remodeling a house, adding a room, building an ADU, replacing structural components, installing new electrical or plumbing work, starting commercial construction, or trying to close an old permit, the City of Gilroy Building Division is the main place to start for properties inside Gilroy city limits.
Gilroy Building Division Contact Information
Gilroy, CA 95020
inspect@cityofgilroy.org
8:30 a.m.–4:30 p.m.
Before visiting City Hall, have the property address, a short description of the work, and your permit or application number if one already exists. For a new project, checking the online portal first can save a trip because many permit, plan-review, payment and inspection tasks can be handled online.
First Check: Is the Property Actually Inside Gilroy?
A Gilroy mailing address does not by itself guarantee that the City of Gilroy is the building-permit authority. The City’s GO Permit user guide specifically recommends checking the project address before starting an application.
Micro-step: verify the project location
- Open the GO Permit portal.
- Open the map or address/parcel search.
- Select Address or Parcel.
- Enter the street address, partial address, or parcel information.
- Select the matching property and review the available City records.
- If the parcel does not appear to be within Gilroy’s jurisdiction, confirm the responsible agency before preparing final plans or paying fees.
This small check matters. Planning, zoning, building permits and inspections can be handled differently when a property sits outside municipal limits.
How to Apply for a Gilroy Building Permit
Gilroy uses GO Permit for new building applications and related online services. The system also supports Planning, Engineering Encroachment, Fire and other development-related permit functions.
Step-by-step permit application
- Open GO Permit. Start from the City’s GO Permit page or open the portal directly.
- Create an account or sign in. Registration is needed for advanced functions such as online applications, personalized permit status and inspection scheduling.
- Confirm the project property. Search the address or parcel so the application is connected to the correct location.
- Select the appropriate permit type. Do not choose a similar-looking permit just to move forward. Contact Building Division if the correct category is unclear.
- Enter the complete project scope. Explain what is being added, replaced, altered, removed or installed.
- Upload plans and supporting documents. Use the City’s current project-specific checklist before uploading.
- Submit the application. Save the application or permit number because you will use it for status checks, payments and inspections.
- Respond to plan-check comments. If revisions are requested, answer each correction and upload the corrected documents through the instructed process.
- Pay the required invoice. Do not assume plan approval means construction can start.
- Wait for permit issuance. Start regulated work only after the required permit has actually been issued.
What information should you prepare?
The City’s permit FAQ identifies several basic items that applicants should have ready, including the project address, a description of the work, owner information and the proposed project valuation. Valuation can include labor and materials rather than only the amount paid to a contractor.
Depending on the project, you may also need site plans, floor plans, structural drawings, calculations, energy documents, CALGreen forms, trade information, engineering, planning approvals, fire review or other documents.
The City maintains a large collection of current forms and project-specific handouts for residential and commercial work. Instead of guessing what to upload, start with the Building Forms, Handouts and Policies page.
| Project type | Useful City resource to check first |
|---|---|
| New home or residential addition | Residential plan-submittal guidelines and checklist |
| ADU or junior ADU | ADU submittal guidelines and plan-review checklist |
| Kitchen or bathroom remodel | Residential kitchen/bath remodel handout |
| Re-roof | Reroof application, reroof requirements and applicable solar policy |
| Solar | Photovoltaic plan-submittal guidelines and checklist |
| EV charger | Residential or commercial EV charging-station handout |
| Commercial construction | Commercial required forms, documentation and plan-submittal guidelines |
| Demolition | Demolition application and procedures |
How to Search Gilroy Building Permits & Check Status
The GO Permit system is useful not only for new applications. Registered users can search permit and plan history and review records associated with a project.
Permit search micro-steps
- Sign in to the GO Permit portal.
- Open the Home area.
- Select Search Permit and Plan History.
- Choose Permit from the search type.
- Enter a permit number, address or supported keyword.
- Open the matching permit record and verify the project address before relying on it.
- Use the record to review available status information, invoices or inspection functions.
If you are researching a property purchase, do more than confirm that a permit number exists. Look at whether the permit was issued, whether required inspections were completed and whether a final inspection is shown where applicable. An application, an issued permit and a completed/finaled permit are different stages.
Building Permit or Planning Review? Know the Difference
This is an easy place to lose time. The Building Division focuses on construction-code compliance, permits, plan review and inspections. The Planning Division deals with land use, zoning, site design and planning entitlements.
Gilroy’s Planning Division gives a practical rule of thumb: projects that are entirely interior—such as many water-heater, electrical or interior-remodel projects—should generally start with the Building Division. The City also says the Building Division can guide applicants through minor exterior improvements such as windows or roofing when the building is not historic.
Projects involving new structures, additions, changes in use, site design, setbacks, architectural review, zoning questions or other land-use issues may need Planning involvement.
Permits, plan review, code compliance and construction inspections
PlanningDivision@CityofGilroy.org
Zoning, land use, planning entitlements and site-related review
Gilroy Building Permit Fees in 2026
Gilroy does not have one flat building-permit price. Fees depend on factors such as project valuation, permit type, plan review, trade work, revisions, inspections and other City services.
The City’s current comprehensive fee schedule is effective July 1, 2026. Building permit fees use the City’s published valuation methodology, while additional charges can apply to plan review, deferred submittals, revisions and other services.
| 2026 fee item | Current published basis |
|---|---|
| Building plan check | 75% of building permit fee |
| Deferred submittal | $172 plus applicable division hourly rate; 2-hour minimum noted |
| Plan revisions | $172 plus applicable division hourly rate; 2-hour minimum noted |
| Expedited building plan check | 150% of building permit fee for first-round review |
| Reinspection fee assessment | $102 plus applicable division hourly rate |
| Building technology fee | 5% of permit fees |
These figures are useful for understanding the fee structure, but your actual invoice is project-specific. Review the City’s current Comprehensive Fee Schedule before budgeting a permit.
How can permit fees be paid?
Gilroy currently provides several payment options:
- Online: credit card or e-check through GO Permit.
- Walk-in: credit card or check at the Building and Planning counters for applicable permit payments.
- Mail: send a check with a copy of the invoice to the Community Development Department at City Hall.
- Drop box: the City identifies a drive-through drop box near Seventh and Rosanna Streets.
The City’s GO Permit page currently states that credit-card payments carry a 2.95% service fee and e-check payments carry a $1.50 flat fee. Confirm these charges on the payment screen because payment-processing fees can change.
How to Schedule a Gilroy Building Inspection
After a permit is issued, required work must be inspected at the appropriate stages. Do not cover work that must remain visible for inspection.
For permits beginning with BLDR or BLDNR, the City directs permit holders to use GO Permit for inspection requests. Older permits consisting of eight numerical digits use the City’s alternate inspection-request process.
Inspection scheduling micro-steps
- Open the permit in GO Permit.
- Confirm the permit is issued and identify the inspection that is actually ready.
- Select the required inspection type.
- Choose an available request date and submit the inspection request.
- Check the portal afterward. The City says the appointment should show as Scheduled when confirmed.
- If confirmation is unclear, call 408-846-0235 or email inspect@cityofgilroy.org.
What should be ready before the inspector arrives?
- The permit must be available at the construction site.
- The City’s approved plans marked as the job copy should be onsite.
- Work being inspected should be complete, visible and accessible.
- Do not pour concrete, close walls or conceal regulated work before the required inspection.
- Correct earlier inspection items before requesting the follow-up inspection.
Common inspection stages can include foundation work, under-floor plumbing/mechanical/electrical, exterior nailing, rough framing and trades, insulation, drywall/lath and final inspection. The exact sequence depends on the permit and project.
Which Building Codes Apply in Gilroy in 2026?
For permit applications submitted on or after January 1, 2026, Gilroy enforces the 2025 California Building Standards Code together with the City’s local amendments.
| Code area | Gilroy 2026 reference |
|---|---|
| Building | 2025 California Building Code |
| Residential | 2025 California Residential Code |
| Electrical | 2025 California Electrical Code |
| Mechanical | 2025 California Mechanical Code |
| Plumbing | 2025 California Plumbing Code |
| Energy | 2025 California Energy Code |
| Existing buildings | 2025 California Existing Building Code |
| Green building | 2025 California Green Building Standards Code / CALGreen |
| Fire | 2025 California Fire Code |
| Property maintenance | 2024 International Property Maintenance Code |
| Pools and spas | 2024 International Swimming Pool and Spa Code |
The City adopted local building-code amendments through Ordinance 2025-06 and fire-code amendments through Ordinance 2025-07. For a broader explanation of California’s current code cycle, see our California Building Code 2026 guide. Gilroy’s local amendments still control where they validly modify the statewide standards.
Gilroy design criteria worth knowing
The City’s current applicable-codes page lists several local design values that can matter when plans are prepared:
- Seismic Design Category: D.
- Wind: 92 mph, Surface Roughness Category C and Wind Exposure C.
- Climate Zone: 4.
- Presumptive soil bearing: 1,500 psf or as established by the soil report.
- Soils: Gilroy notes expansive-soil conditions and states that a soil report is required for new construction projects.
- Maximum rainfall: 1.5 inches per hour.
Use the City’s Applicable Codes and Design Criteria page when preparing plans. Project-specific engineering can require more precise values than a general web summary.
Gilroy Construction Hours
Gilroy’s construction-hours ordinance generally limits construction activity to the following hours unless a valid permit or approval provides otherwise:
| Day | General construction hours |
|---|---|
| Monday–Friday | 7:00 a.m.–7:00 p.m. |
| Saturday | 9:00 a.m.–7:00 p.m. |
| Sunday | Generally prohibited |
| Specified City holidays | Generally prohibited |
The ordinance includes a separate provision allowing a resident personally performing improvements or maintenance on that resident’s single residence to perform qualifying work on Sundays and City holidays from 9:00 a.m. to 6:00 p.m.. Other exceptions can require approval from the Building Official.
Common Permit Problems — and the Practical Fix
| Problem | Best next step |
|---|---|
| You are unsure which permit type to choose | Call Building Division with the property address and exact scope before submitting the wrong application. |
| Your application is waiting on another department | Check whether Planning, Fire, Engineering or another approval is still outstanding. |
| Plans were returned with corrections | Answer every comment and upload a coordinated revision package rather than replacing only one affected sheet. |
| You cannot find an older permit online | GO Permit’s current guide says online record search covers roughly 1999 forward; request older records through the City. |
| An inspection cannot be scheduled | Confirm the permit is issued, the correct inspection sequence is available and prerequisite inspections are complete. |
| Inspector cannot approve the work | Review the correction, keep the work exposed, correct the issue and request the required reinspection. |
| You discovered unpermitted construction | Contact Building Division before concealing, remodeling or assuming the existing work can remain as-is. |
Official Gilroy Building Resources
| Official resource | Use it for |
|---|---|
| Building Division | Department information, codes, permit and inspection services |
| GO Permit | Online permit-system instructions and payment information |
| GO Permit portal | Applications, permit search, status, payments and inspections |
| Forms & handouts | Applications, project checklists and construction guidance |
| Building inspections | Inspection scheduling rules and preparation requirements |
| Fee schedule | Current City fees and building valuation information |
| Applicable codes | 2026 code cycle, local amendments and design criteria |
| Planning Division | Zoning, land use and planning-review questions |
Gilroy Building Department FAQs
1. Where is the Gilroy Building Department located?
The City of Gilroy Building Division is part of Community Development at 7351 Rosanna Street, Gilroy, CA 95020. The main building-related phone number is 408-846-0451.
2. Can I apply for a Gilroy building permit online?
Yes. Gilroy uses its GO Permit Community Self-Service system for online building permit applications, plan-review tracking, payments and other permit functions.
3. How do I search for a Gilroy building permit?
Sign in to GO Permit, open the Home area, choose Search Permit and Plan History, select Permit, then search by permit number, address or another supported field. The City’s current guide says online record search covers approximately 1999 to the present.
4. How do I schedule a building inspection in Gilroy?
Permits beginning with BLDR or BLDNR should use GO Permit. Open the permit, select the eligible inspection and submit the request. Gilroy currently advises that inspection appointments are running approximately 72 hours out.
5. What should I have ready for a Gilroy inspection?
Keep the permit onsite, have the City-approved job-copy plans available, make the inspection area accessible and leave required work exposed until the inspector approves it.
6. What building code does Gilroy use in 2026?
New applications submitted on or after January 1, 2026 use the 2025 California Building Standards Code together with Gilroy’s adopted local amendments, including Ordinance 2025-06 and applicable fire-code provisions.
7. How much does a Gilroy building permit cost?
There is no single flat permit price. Fees vary with project valuation, permit type, plan check, revisions, trade work and other applicable City charges. Use the Comprehensive Fee Schedule effective July 1, 2026 and the City’s final invoice for the project-specific amount.
8. Does a remodel need Planning approval in Gilroy?
Not every remodel does. Gilroy states that many all-interior projects can begin with the Building Division. Projects affecting land use, zoning, site design, new structures or other planning issues may require Planning review.
9. What are Gilroy’s normal construction hours?
General construction hours are 7:00 a.m. to 7:00 p.m. Monday through Friday and 9:00 a.m. to 7:00 p.m. Saturday, with construction generally prohibited on Sundays and specified City holidays unless an applicable exception or approval applies.
10. Where can I find Gilroy building permit forms and checklists?
Use the City’s Building Division Forms, Handouts and Policies page. It includes permit applications and guidance for residential plans, ADUs, reroofing, solar, EV charging, remodels, demolition, commercial construction and other common projects.
Before You Submit
The fastest path is usually simple: confirm the property is inside Gilroy, identify whether Planning review is needed, use the City’s project-specific checklist, submit through GO Permit, respond completely to plan-check comments, pay the official invoice and schedule inspections before regulated work is concealed.
For a 2026 project, do not rely on old 2022-code checklists found elsewhere on the web. Gilroy is now enforcing the 2025 California Building Standards Code for applicable new applications, together with local amendments. Use the City’s current portal and official forms for the final permit action.
USBuilding.org is an independent informational resource and is not affiliated with the City of Gilroy. Permit requirements, fees, inspection availability and project-specific approvals can change. The City of Gilroy and other responsible agencies make the final determination for an individual property or project.