Foxboro Building Department 2026: Permits, Inspections & Services

Foxborough Building Permits, Inspections & Official Services

If you searched for the Foxboro Building Department, the official office is the Town of Foxborough Building Department / Inspections Department. Foxboro is commonly used as a shorter local spelling, but the municipality officially uses Foxborough, Massachusetts.

Quick answer: Building, electrical, plumbing, gas and sheet-metal permit applications are handled through Foxborough’s online permitting system. For permit questions, call the Building Department at 508-543-1206. The office is at Foxborough Town Hall, 40 South Street, Foxborough, MA 02035. The Town currently directs applicants to submit permit applications through its online PermitEyes portal.
DepartmentTown of Foxborough Building Department
Office40 South Street, Foxborough, MA 02035
Building CommissionerScott Shippey
Search RecordsPublic permit search

What the Foxborough Building Department Handles

The department administers Massachusetts building, electrical, plumbing and gas requirements along with Architectural Access Board rules and Foxborough zoning regulations related to construction, land use, occupancy and demolition.

Service What it means for you
Building permits New construction, additions, renovations, structural work, demolition and other regulated building work.
Electrical permits Permitting and inspection of regulated electrical installations and alterations.
Plumbing and gas Separate trade permits and inspections for plumbing and gas-fitting work.
Sheet metal / mechanical work Applicable HVAC, mechanical and sheet-metal work may require separate permitting.
Construction inspections Required inspections during work, including footing, foundation, framing, insulation and final stages when applicable.
Zoning enforcement The Building Commissioner also has zoning-enforcement responsibilities under Foxborough’s bylaws.
Certificates of occupancy New construction and qualifying changes of use must complete required inspections and departmental sign-offs before occupancy approval.
Permit records The Town provides a public PermitEyes search for applications and permits.

The official starting page for these services is the Foxborough Building Department.

Do You Need a Building Permit in Foxborough?

Foxborough’s official permitting guide states that a building permit is generally required for construction, reconstruction, alteration, repair, relocation or demolition of a building or structure, changes in use or occupancy, and installation or alteration of equipment regulated by the Massachusetts State Building Code.

That means you should check permit requirements before beginning projects such as an addition, structural renovation, new garage, major deck project, new building, demolition, pool installation, occupancy change or work involving regulated building systems.

Work the Town’s guide identifies as exempt from a building permit

The Town’s published permitting guide lists several examples that may not require a building permit:

  • A one-story detached tool or storage shed of no more than 200 square feet, subject to Foxborough location and setback requirements.
  • A fence 6 feet high or less.
  • A retaining wall retaining less than 4 feet of unbalanced fill.
  • Ordinary repairs and maintenance that do not alter the building or structure.
  • A greenhouse covered exclusively with plastic film.
Important: “No building permit” does not automatically mean “no rules.” A shed, fence or other exempt structure may still have zoning, setback, wetland, utility, health or other requirements. For example, Foxborough’s guide says detached sheds must still comply with applicable yard placement rules.

If the work is difficult to classify, call 508-543-1206 before buying materials or starting construction.

Which Permit Should You Apply For?

The correct application depends on the actual work. One project can require several permits.

Your project Likely permits or reviews to check
Home addition or major remodel Building permit plus electrical, plumbing, gas, mechanical or sheet-metal permits where those trades are involved.
New house or ADU Building permit, zoning review, trade permits, required departmental approvals and a sequence of construction inspections.
Deck Building permit and zoning/setback review.
Detached garage or large shed Building permit, zoning/setback review and potentially a plot plan.
Roofing, siding or replacement windows Foxborough’s building fee schedule specifically includes these categories; confirm the permit needed for your scope.
Swimming pool Building and related safety approvals; electrical work normally requires a separate permit.
Demolition Building/demolition permit plus other required trade or departmental clearances.
Commercial renovation Building permit, zoning/use review and applicable fire, electrical, plumbing, gas, mechanical and accessibility reviews.
Change of use or occupancy Building/zoning review and applicable certificate of occupancy requirements.

How to Apply for a Foxborough Building Permit Online

Foxborough currently accepts Building Department permit applications through PermitEyes. A new applicant must register before starting an application.

  1. Open the official permit portal.
    Go to the Foxborough PermitEyes applicant login.
  2. Create an account if this is your first application.
    Select “New User Register Here!”. Enter the requested account information and complete registration.
  3. Start the permit that matches your work.
    Choose the appropriate building, electrical, plumbing, gas, sheet-metal or other available application. Do not select a simpler permit merely because it appears faster.
  4. Enter the property and project details.
    Use the correct site address, property owner information, applicant/contractor details, construction value and a specific description of the proposed work.
  5. Attach the required plans and supporting documents.
    Upload drawings, plot plans, contractor credentials, affidavits and other documents applicable to the project.
  6. Submit the application for departmental review.
    Foxborough applications may move through Planning, Conservation, Health, Water and Sewer, Fire and Inspections depending on the project. Watch the permit account for comments or missing requirements.
  7. Pay the required fee and wait for permit issuance.
    Submitting an application is not the same as receiving a permit. Do not begin permit-required construction until the permit is issued.
Before clicking submit: Check the street address, project description, estimated construction cost, contractor information and uploaded plans. A clear application is much easier for reviewers to process than a vague description such as “renovation.”

Documents You May Need Before Applying

Requirements depend on the scope, but Foxborough’s permitting guidance identifies several documents that can be important for building-permit review.

  • Scaled construction drawings and specifications.
  • Foundation plans and details.
  • Floor plans with room dimensions.
  • Exterior elevations.
  • Framing and structural details.
  • Door and window installation details where applicable.
  • Energy-conservation information.
  • Fire-protection information when required.
  • Smoke and carbon-monoxide detector locations when a bedroom is being added.
  • A plot plan when a new structure is being located or an existing building footprint is changing.
  • Construction Supervisor License and Home Improvement Contractor information when applicable.
  • Homeowner exemption affidavit when an eligible homeowner applies under the applicable owner exemption.
  • Waste-disposal affidavit when demolition or debris removal applies.
  • Workers’ Compensation affidavit and applicable insurance information.

When is a stamped plot plan important?

Foxborough’s guide says that when a new building is being placed on a lot or an existing building footprint changes, a scaled plot plan may be required. The plan should be prepared and stamped by a registered land surveyor and show items such as lot dimensions, existing and proposed structures, setbacks, easements, septic information, flood zones and wetlands.

The Town’s guide specifically notes that a mortgage survey plan does not satisfy this requirement.

Large or structurally complex projects

The Town’s permitting guide states that plans and specifications for buildings containing more than 35,000 cubic feet of enclosed space require a Massachusetts registered architect or engineer. The building official may also require a registered design professional for structural members or building systems when appropriate.

Massachusetts currently uses the 10th Edition of the Massachusetts State Building Code, 780 CMR. The ninth/10th-edition transition ended June 30, 2025, so new 2026 applications are governed by the 10th Edition and applicable local requirements.

Foxborough Building Permit Fees

The Town’s Building Permit Fees page continues to link the fee schedule that took effect after the July 1, 2023 increase. Use these amounts for planning, but verify the amount calculated by the Town for your actual application before payment.

Residential item Published fee
Minimum building permit fee $75
Reinspection $75
New one- or two-family dwelling $0.55 per sq. ft. or 1% of construction cost, whichever is greater
Residential addition / alteration / renovation $0.55 per sq. ft. or 1% of construction cost, whichever is greater, according to the posted schedule
Foundation only $100
Detached garage, shed or similar accessory structure $0.55 per sq. ft. or 1% of construction cost, whichever is greater
Deck $0.35 per sq. ft. or $150 minimum for three inspections
Roofing / siding / replacement window $50
Above-ground pool $75
In-ground pool $100
Fireplace / chimney $150 minimum; two inspections
Residential demolition $75 plus minimum required plumbing/electrical permits per structure
Commercial / multifamily item Published fee
Minimum fee $100
Reinspection $100
New construction / alterations / renovations Schedule lists $100 for the first $1,000 plus $15 per $1,000 under its published calculation
Mechanical / sprinkler / HVAC / sheet metal $50 minimum plus 1% of contract
Demolition $100 per floor
Temporary structure / tent $100 per structure
Temporary sign $30; posted schedule states a 30-day maximum per calendar year

Check the Town’s current Building Permit Fees page before payment.

Fee rules that can save you an expensive mistake: The Town’s posted schedule says permit fees are non-refundable and non-transferable. It also states that when work requiring a permit is started before obtaining the permit, the permit fee is doubled. A residential reinspection is $75 and a commercial reinspection is $100 when the work is not ready, is unacceptable, or the building is inaccessible.

How to Request a Building Inspection

After the permit is issued, inspections must occur at the required stages. Foxborough says rough plumbing and/or electrical inspections must be completed before requesting applicable building inspections.

You can request an inspection by calling 508-543-1206 or through the permit system.

  1. Find the permit number and property address.
  2. Identify the exact inspection you need next.
  3. Make sure all prerequisite trade inspections have passed.
  4. Do not cover framing, wiring, piping, insulation or other work that still requires inspection.
  5. Call the office or open your permit account and submit the inspection request.
  6. Make sure the site is accessible and the work is actually ready.
  7. After approval, proceed to the next construction stage.

Published inspection hours

Inspection Current published schedule
Plumbing & gas Monday-Friday, 7:00 AM-8:30 AM
Electrical Monday-Friday, 3:00 PM-5:00 PM
Building Monday, Wednesday & Thursday: 9:30 AM-3:00 PM; Tuesday: 9:30 AM-3:00 PM and 4:00 PM-7:00 PM; Friday: 9:30 AM-12:30 PM

The Building Department currently states that inspections scheduled outside normal business hours incur a $400 urgency/emergency fee paid in advance.

New Home and ADU Inspection Sequence

Foxborough now publishes a particularly useful inspection order for new residential homes and accessory dwelling units. The Town describes this as the minimum sequence; a particular project may require additional inspections.

  1. Excavation/open-hole inspection.
  2. Electrical Ufer inspection when at least 20 feet of rebar is present in the footing. A licensed electrician must have the separate electrical permit.
  3. Footing inspection.
  4. Foundation inspection. Where setbacks are close, the Town may require an as-built survey. Damp proofing must be complete before this inspection.
  5. Once the structure is weather-tight, complete rough plumbing, gas and electrical inspections.
  6. After those trades pass, complete the shared rough framing, rough sheet-metal and fire-stopping inspection.
  7. Insulation inspection.
  8. Final plumbing, gas and electrical inspections.
  9. Fire Department inspection of required smoke, heat and carbon-monoxide detectors.
  10. Final building and final sheet-metal inspection.

Before requesting the final building inspection

For the new-home/ADU process, Foxborough lists several items to complete before final building inspection:

  • Complete and submit the blower-door test and HVAC duct-leakage test.
  • Mount REScheck documentation at the electrical panel.
  • Insulate hot-water pipes in unconditioned spaces.
  • Install weather stripping and door sweeps on doors leading to unconditioned spaces.
  • Obtain final approvals for plumbing, gas, electrical and required Fire Department inspections.

After final building approval, all required Town departments must sign off before the Certificate of Occupancy is issued. For this process, Foxborough states that issuance of the Certificate of Occupancy represents full project completion.

See Foxborough’s current new-construction inspection sequence.

You do not need to rely on a third-party permit website just to check a public Foxborough record. The Town links directly to the PermitEyes public-record view.

  1. Open the public permit search.
    Use the Foxborough PermitEyes public records page.
  2. Search using the information you already have.
    The search screen provides fields such as application number, issue date, site address, applicant, owner, contractor, application type, permit number and application status.
  3. Start with the site address if you do not know the permit number.
    Use a simple address search first, then narrow the result.
  4. Confirm the correct property.
    Check the owner, address, permit type and project information before relying on the record.
  5. Look at the status, not just the existence of a permit.
    An issued permit does not automatically prove that every inspection was completed or that the project received final approval.
Buying or selling a property? If a major addition, deck, finished basement, pool or renovation appears on the property but its permit history is unclear, ask the Building Department whether the relevant permit received its required final inspection instead of assuming that an old permit is closed.

Check Zoning Before You Design the Project

A project can comply with the building code and still fail local zoning rules. Foxborough zoning can affect setbacks, lot coverage, building placement, use, accessory structures, signs and other property-specific issues.

The Building Commissioner is also the Town’s Zoning Enforcement Officer for purposes of the zoning bylaws.

Simple zoning check

  1. Open the Town’s Zoning Map & Overlay District Maps page.
  2. Locate the property and identify the zoning district and any applicable overlay.
  3. Open the Foxborough General and Zoning Bylaws.
  4. Check the rules relevant to your proposed structure or use.
  5. If a setback, use or interpretation is unclear, contact the Building Department or Land Use and Economic Development before preparing final construction drawings.

This is especially important for additions, garages, sheds, commercial uses, signs, accessory dwelling units and projects close to property lines.

Wetlands and conservation can change the process

Foxborough’s official permitting guide explains that work near wetlands, potential vernal pools, rivers or streams may require Conservation Commission review. If your project is near a wet area or mapped resource area, check this before spending money on a final building design.

Can a Homeowner Pull Their Own Permit?

Massachusetts provides a homeowner exemption in certain circumstances for qualifying one- and two-family properties, and Foxborough’s permitting guide says a homeowner applying under that provision must submit a completed homeowner exemption affidavit.

That exemption should not be treated as a shortcut around contractor licensing. Massachusetts advises homeowners that when they hire a home-improvement contractor, the contractor should normally obtain the building permit. A homeowner who takes out the permit personally can become responsible for supervising code compliance and may lose certain protections available through the state’s Home Improvement Contractor Guaranty Fund.

For applicable projects, Massachusetts also requires oversight by a Construction Supervisor License holder or registered design professional unless a valid exemption applies.

Trade work is different: Do not assume a homeowner building-permit exemption allows you to perform regulated electrical, plumbing or gas work. Those trades have separate Massachusetts licensing and permitting requirements.

How Long Does a Foxborough Building Permit Take?

There is no single reliable approval time for every Foxborough project. A simple application and a new commercial development do not move through the same review path.

Foxborough’s official permitting guide explains that Massachusetts building-code provisions call for building-official review within 30 days of filing, but it also explains an important detail: for that process, an application is not considered fully filed until required departmental reviews have been completed and the application returns to the Inspections Department for plan review.

In practice, the biggest causes of avoidable delay are often:

  • Missing construction plans.
  • An unclear work description.
  • Incorrect property or owner information.
  • Missing plot plan or survey.
  • Unresolved zoning issues.
  • Planning, Conservation, Health, Water/Sewer or Fire approvals still pending.
  • Missing contractor license or registration information.
  • Required revisions not uploaded.
  • Outstanding permit fees.

Before submitting a second application, check your existing PermitEyes record and any review comments.

When Does a Building Permit Expire?

Foxborough’s published permit guide states that a building permit expires when authorized work is not started within six months of issuance and continued in good faith toward completion. Massachusetts’ current building-code guidance likewise contains a 180-day commencement rule.

If a project has stopped for a long period, contact the Building Department before simply restarting construction under an old permit.

Foxborough Building Department Contact & Hours

Official office Town of Foxborough Building Department
Address Foxborough Town Hall, 40 South Street, Foxborough, MA 02035
Phone 508-543-1206
Fax 508-543-6278
Monday 8:30 AM-4:00 PM
Tuesday 8:30 AM-7:00 PM
Wednesday 8:30 AM-4:00 PM
Thursday 8:30 AM-4:00 PM
Friday 8:30 AM-12:30 PM

Current published staff

  • Building Commissioner: Scott Shippey
  • Department Administrator: Ashley Wingert
  • Permit Coordinator: Lisa Rouillard
  • Building Inspector: Gil Bonoan
  • Electrical Inspector: Shawn P. Wills
  • Plumbing & Gas Inspector: Michael T. Eisenhauer

Staff assignments and hours can change, so use the current Town Building Department page when you need to reach a particular inspector.

Other Massachusetts Building Department Guides

Permit systems are municipal in Massachusetts, so the Foxborough process should not be used for a property in another city or town. If your project is elsewhere, these existing guides may help:

Foxboro Building Department: 10 Frequently Asked Questions

1. What is the phone number for the Foxboro Building Department?

The Town of Foxborough Building Department phone number is 508-543-1206. Use this number for questions about building permits, permit requirements and inspections.

2. Where is the Foxborough Building Department located?

The department is at Foxborough Town Hall, 40 South Street, Foxborough, MA 02035.

3. Can I apply for a Foxborough building permit online?

Yes. Foxborough directs building and inspection permit applicants to its PermitEyes online system. New users must register before starting a permit application.

4. How can I search Foxborough building permits?

Use the official PermitEyes public-record search. It provides fields for site address, application number, permit number, applicant, owner, contractor, application type and application status.

5. Does a small shed require a building permit in Foxborough?

Foxborough’s permitting guide lists a one-story detached tool or storage shed of no more than 200 square feet among its building-permit exemptions. However, the structure must still comply with applicable zoning and placement requirements, so verify setbacks before installation.

6. How much is a residential building permit in Foxborough?

The Town’s posted schedule lists a $75 residential minimum. New one- and two-family construction is listed at $0.55 per square foot or 1% of construction cost, whichever is greater. Other projects have their own fee calculations.

7. How do I schedule a Foxborough building inspection?

Call the Building Department at 508-543-1206 or use the online permit system. Make sure prerequisite electrical, plumbing or gas inspections have been approved before requesting a building inspection when they apply.

8. Can I start construction while my permit application is being reviewed?

No. Submission of an application does not mean the permit has been issued. Foxborough’s fee schedule also states that when permit-required work starts before a permit is obtained, the permit fee is doubled.

9. Which building code applies in Foxborough in 2026?

The Massachusetts State Building Code, 10th Edition of 780 CMR, is the current statewide building code in 2026, together with applicable Massachusetts amendments, Foxborough zoning bylaws and other project-specific regulations.

10. Who is the Foxborough Building Commissioner?

The Town’s current Building Department page lists Scott Shippey as Building Commissioner. Because staff can change, confirm the current listing before directing project-specific correspondence.

Before You Submit Your Permit

The easiest way to avoid an unnecessary trip or rejected application is to confirm three things first: the correct permit type, the property’s zoning limitations, and the documents required for your particular project.

For most applicants, the practical order is simple: check zoning → prepare plans and contractor information → apply through PermitEyes → respond to departmental reviews → pay the fee → wait for issuance → complete inspections in the required order → obtain final approval or a Certificate of Occupancy when required.

Information reviewed for 2026. USBuilding.org is an independent informational resource and is not the Town of Foxborough. The Town and Commonwealth control permit decisions, code interpretation, inspections, fees and official records. Verify project-specific requirements before beginning regulated work.