Juno Beach Building Permits, Inspections & Official Services
If you are remodeling a home, replacing a roof or windows, installing air conditioning, building an addition, putting up a fence, planning demolition, checking an old permit, or trying to schedule an inspection in Juno Beach, the Town of Juno Beach Building Department is the local office responsible for building permits, permit records and construction inspections within the Town.
The Juno Beach Building Department is located at 340 Ocean Drive, Juno Beach, FL 33408. The main Town number is 561-626-1122. Published Building Department hours are Monday through Friday, 8:00 a.m. to 4:00 p.m. Permit applications, contractor registration, permit searches, payments and inspection requests are handled through MGO Connect.
Juno Beach Building Department Contact Information
| Service | Current information |
|---|---|
| Department | Town of Juno Beach Building Department |
| Address | 340 Ocean Drive, Juno Beach, FL 33408 |
| Main phone | 561-626-1122 |
| Building Official | Buck Evans — 561-222-1800 |
| Permit / License Coordinator | Janice Daley — 561-656-0304 |
| Permit / License Coordinator | Wendy Delfino — 561-656-0302 |
| Office hours | Monday–Friday, 8:00 a.m.–4:00 p.m. |
| Permit portal | MGO Connect |
| Forms | Juno Beach Building Permit Forms |
| Inspections | Official inspection instructions |
Staff assignments and direct numbers can change. For an active permit, use the current Town directory or the contact shown inside the MGO record.
How to Apply for a Juno Beach Building Permit
The Town uses MGO Connect for permitting. Do not begin by uploading random documents or selecting the closest-looking permit category. First confirm the project scope, property address and whether zoning, floodplain, coastal or architectural review applies.
-
Open MGO Connect.
Go to the MGO Connect Customer Portal and create an account if you do not already have one. -
Register the contractor first when applicable.
Contractors must complete Town contractor registration before they can submit permit applications. -
Prepare the exact project documents.
Depending on the job, this may include plans, a survey, product approvals, affidavits, contractor information, an A/C change-out form, private-provider documents, a Sea Turtle Lighting Permit application, or other supporting material. -
Select “Apply Online For A Permit.”
Choose the permit type that matches the actual work rather than selecting a generic category just to start the application. -
Enter the property, owner and job information carefully.
Verify the Juno Beach address, project description and job valuation before submitting. -
Upload all required documents.
Incomplete applications create avoidable review comments. Use readable files and make sure submitted plans match the scope described in the application. -
Pay the amount requested at application.
Juno Beach’s 2026 HB 803 guidance states that permit fees are requested when an application is submitted. Additional charges can be assessed during review. -
Watch the MGO record for comments.
Respond to corrections or requests for additional documentation through the existing record rather than starting a second application. -
Pay any remaining balance and obtain the issued permit.
An application under review is not the same as an issued building permit. Wait for the required approval before beginning regulated work.
The Town’s own permit FAQ summarizes the process as: create the MGO account, register the contractor, wait for verification, then use “Apply Online For A Permit.” If you are stuck before submission, call 561-626-1122.
Building Permit Forms: What You May Need
Juno Beach maintains a dedicated forms library. Instead of downloading a form from an unofficial permit website, start with the Town’s current Building Permit Forms page.
| Form or document | When it may matter |
|---|---|
| Building Permit Application | General building permit applications and project information. |
| Air Conditioning Change Out Form | Required documentation for applicable A/C replacements. |
| Appearance Review Application | Projects subject to Town architectural/appearance review. |
| Owner Builder Affidavit | Qualifying owners proposing to act as their own contractor. |
| Final Cost of Construction Affidavit | Closeout documentation where applicable. |
| Change of Contractor Form | When the contractor attached to an active permit changes. |
| Expired Permit Notice | For extension, renewal or reopening questions. |
| Private Provider documents | When using a qualified private provider for plan review and/or inspections. |
| Residential Permit Exemption Request | Certain qualifying single-family projects under Florida HB 803. |
| Sea Turtle Lighting Permit forms | Certain exterior lighting, windows and glass doors within the Sea Turtle Protection Zone. |
The Town also publishes separate building affidavit forms for roofing, plumbing, mechanical work, owner-builders, surveys, demolition and final construction cost.
Important 2026 Change: Some Small Residential Work May Qualify for a Permit Exemption
Florida HB 803 took effect July 1, 2026 and changed how certain small single-family residential projects are handled. In Juno Beach, this is not an automatic “under $7,500 means no permit” rule.
Basic Juno Beach eligibility conditions
- The property must be a single-family residential property.
- The job cost must be less than $7,500.
- The property cannot be partly or entirely within a Special Flood Hazard Area.
- The work cannot include structural, electrical, plumbing, mechanical or gas work.
- The project cannot be artificially divided into smaller jobs to avoid permitting.
Work that still requires a permit regardless of the low project value
- Electrical work
- Plumbing work
- Mechanical work, including air-conditioning systems
- Gas work
- Structural work
- Work on properties in a Special Flood Hazard Area
- Commercial property work
- Multifamily, condominium and apartment projects
- Window replacements
The Town explains that cosmetic, nonstructural work such as interior painting, flooring replacement, cabinet replacement and some drywall repairs may potentially qualify, but the Building Official makes the final determination.
Micro steps to request the exemption
- Open the Town’s 2026 permit-processing update page.
- Download the Residential Permit Exemption Request.
- Enter the property, owner, project description and total value of the work.
- Attach a proposal, contract, estimate, invoice or other documentation showing scope and cost.
- Complete the owner certification and required signature/notarization sections.
- Submit the form and supporting documents to Buildingdepartment@juno-beach.fl.us.
- Wait for the Town’s written approval or denial before starting work.
Even an approved building-permit exemption does not erase zoning, setback, HOA, floodplain or other local requirements.
How to Schedule a Juno Beach Building Inspection
All Building Department inspections are scheduled online through MGO Connect. Published inspection hours are 8:00 a.m. to 4:00 p.m., Monday through Friday, excluding legal holidays.
- Sign in to MGO Connect.
- Open the active permit for the property.
- Go to the inspection area and select the required inspection type.
- Choose the requested inspection date.
- Submit the request before the 4:00 p.m. cutoff.
- Check the permit record for scheduling information and results.
- If you need a narrower arrival window, contact the assigned inspector directly by text message only. The Town says inspectors can provide a two-hour window rather than an exact arrival time.
Do not cover framing, wiring, plumbing, structural connections or other work that still requires inspection. If an inspection fails, correct the listed issue before scheduling the applicable reinspection.
View the current Building Department inspector directory.
Permit Fees and Payment in 2026
There is no safe single-dollar estimate for every Juno Beach permit because the final charge can depend on the project, valuation, disciplines involved, plan review, inspections, revisions and other applicable requirements.
The Town’s 2026 HB 803 information says it continues to request permit fees when the application is submitted. Additional fees may be added during review. When the application is approved, the applicant is notified of any remaining balance, and the permit is issued after the balance is paid.
How you can pay
- Online: permit fees can be paid by credit card through MGO Connect.
- In person: the Town FAQ states that Town Center accepts cash or checks.
Private provider fee reductions
The Town’s 2026 HB 803 packet lists a 25% building-permit fee reduction for plan review and a 25% reduction for inspections when qualifying private-provider services are used. Structural, electrical, mechanical and plumbing disciplines are handled separately, while services such as landscape, zoning and engineering are not included in that private-provider reduction.
Use the amount assessed in your MGO application as the practical current figure rather than relying on an older fee table copied from another website.
Palm Beach County impact fees changed in 2026
For projects subject to Palm Beach County impact fees, Juno Beach notes that the updated schedule became effective January 1, 2026. The assessment is based on the fee schedule in effect on the permit issuance date, not the original application date. For impact-fee questions, the Town lists the Palm Beach County Impact Fee Office at 561-233-5025.
Juno Beach Contractor Registration
A contractor cannot simply create an MGO account and immediately start submitting Juno Beach permits. The Town requires contractor registration.
- Sign in to MGO Connect.
- Select “Apply for Contractor Registration.”
- Upload a copy of the contractor’s active State of Florida or applicable county license.
- Upload the certificate of insurance for workers’ compensation and liability coverage.
- List Town of Juno Beach, 340 Ocean Drive, Juno Beach, FL 33408 as the certificate holder.
- Wait for registration verification.
- Once approved, return to MGO and begin the actual permit application.
If you are a property owner considering an owner-builder permit, do not use owner-builder status simply because a contractor suggests it is easier. Review the Town’s owner-builder affidavit and make sure you qualify and understand the responsibilities you are assuming.
How to Search Juno Beach Building Permits and Records
MGO Connect is also the Town’s primary permit-search system.
- Open MGO Connect.
- Create a free account if the system requires one for the information you need.
- Search using the permit number when known.
- If you do not have the permit number, use the available property or project search fields.
- Open the matching record and review its status, inspections and available permit information.
For older or broader Town records that are not available in MGO, Juno Beach also provides a public-records process. Records can include ordinances, resolutions, meeting materials and other municipal documents. Use the Town’s public records request portal when the document you need is not available through the ordinary permit search.
Juno Beach-Specific Rules That Can Change Your Project
This is where Juno Beach differs from a generic Florida permitting guide. A small coastal town can have project requirements that do not appear obvious from the words “building permit.”
1. Sea Turtle Protection Zone
The Town’s Sea Turtle Lighting Permit rules apply to properties within 600 feet landward of the mean high-water line, and the Town specifically warns that this can include properties on the west side of Ocean Drive.
Within this zone, a Sea Turtle Lighting Permit may be required for:
- new exterior lighting;
- replacement or modification of exterior lighting;
- installation or replacement of windows with a line of sight to the beach; and
- certain new glass doors and related coastal-facing glazing.
New exterior lighting can require both the Sea Turtle Lighting Permit and a Juno Beach building permit. For help determining whether your property falls in the zone, the Town directs applicants to Code Compliance at 561-627-0818.
Official Sea Turtle Lighting Permit information for windows and glass doors
2. Flood-zone properties need extra attention
Flood status matters before you assume a project qualifies for the 2026 $7,500 residential exemption. The Town’s HB 803 guidance excludes property located partly or entirely within a Special Flood Hazard Area from that exemption.
Juno Beach maintains floodplain information and Elevation Certificate resources, and Town staff can help with flood-map determinations. Start with the Town’s Flood / Floodplain Information before submitting a project where elevation or flood-zone status may affect the design.
3. Major demolition has special local requirements
Juno Beach Ordinance No. 781 added additional requirements for complete or major demolition permits. The application must address preservation of native vegetation and include an erosion-control plan, parking plan, construction-screening plan and truck-logistics plan.
The property owner must also provide the required affidavit concerning notice to owners of properties within 300 feet of the demolition. If reconstruction does not begin within the Town’s specified period after demolition, landscaping requirements can apply.
4. Architectural review may come before the building permit
The Town’s current building FAQ states that an Architectural Review Board application is required when a major renovation exceeds 50% of the improvement value of the structure and/or for certain new residential construction not located in a Planned Unit Development. The Town says this step occurs before the permit application is submitted.
If you are uncertain whether the property is in a PUD or whether the project triggers appearance review, contact Juno Beach Planning & Zoning at 561-626-1122 before spending time on a full building submission.
5. A/C replacements have their own Town checklist
For an air-conditioning change-out, the Town FAQ says both the condenser and handler must be changed. The location of the condenser also affects what you submit:
- Roof: provide a marked Google Earth or Palm Beach County Property Appraiser aerial showing the location.
- Ground: provide a survey with the condenser location marked.
- Through-wall unit: identify that configuration on the permit plan.
- Submit the Town’s A/C change-out form showing both the existing and replacement systems.
A property survey is required for a replacement condenser so the Town can verify the equipment meets setback requirements.
6. Fence replacements require easement releases
Juno Beach’s permit FAQ states that easement releases are required for any fence installation or replacement. Do not assume replacing a fence in the same location eliminates that requirement.
7. Construction hours are restricted
| Day | Permitted construction hours |
|---|---|
| Monday–Friday | 7:00 a.m.–6:00 p.m. |
| Saturday | 9:00 a.m.–5:30 p.m. |
| Sunday | No construction |
| Legal holidays | No construction |
8. Construction roll-off containers
The Town states that it is contracted with WM and permits WM roll-offs for construction sites. If a contractor plans to place a different company’s dumpster at the property, verify the current rule before ordering it. Code Compliance can be reached at 561-627-0818.
9. Recent coastal erosion and damaged structures
If your project involves storm, wave or erosion damage, do not treat it like an ordinary cosmetic repair. Structural support, floodplain rules and emergency conditions can change what should happen first.
Check the Town’s October 28, 2026 coastal update.
Which Florida Building Code Applies in November 2026?
As of November 3, 2026, the Florida Building Commission identifies the Florida Building Code, 8th Edition (2023) as the statewide edition currently in effect. Its effective date was December 31, 2023.
The Florida Building Commission’s published 2026 update schedule identifies December 31, 2026 as the planned effective date for the 9th Edition (2026). Projects submitted close to the code transition should confirm the applicable edition with the Juno Beach Building Department rather than assuming the new edition already applies.
Florida Building Commission official site
Common Reasons a Juno Beach Permit Gets Delayed
| Problem | What to do before submitting |
|---|---|
| Contractor not registered | Complete MGO contractor registration and upload the license and insurance documents first. |
| Wrong permit type | Use the project scope, not a vague description, to select the permit category. |
| Missing survey | Check whether setbacks, equipment location, fences or site work make a current survey necessary. |
| Coastal requirements missed | Check the Sea Turtle Protection Zone before replacing windows, glass doors or exterior lighting. |
| Flood status overlooked | Confirm whether the property lies in a Special Flood Hazard Area before relying on a permit exemption. |
| Architectural review skipped | Ask Planning & Zoning whether ARB/appearance review is required before the building application. |
| Incomplete demolition package | Include the locally required erosion, parking, screening, logistics and notification material. |
| Work started too early | Wait until the permit or written exemption determination is issued. |
| Inspection requested too late | Submit the request through MGO by 4:00 p.m. the day before the requested inspection. |
Permit Expiration and Renewal
Do not assume an issued permit remains active indefinitely. Juno Beach provides an expired-permit process and tells applicants to contact the permitting staff when an extension or renewal is needed.
The Town’s current FAQ directs expired-permit questions to permitting@juno-beach.fl.us or the permit coordinator. Its 2026 HB 803 guidance also states that a building permit issued for a single-family dwelling expires one year after issuance or on the effective date of the next Florida Building Code edition, whichever is later, subject to the applicable law and permit circumstances.
For a real project, monitor the permit in MGO and resolve an approaching expiration before the permit becomes an enforcement or re-permitting problem.
Nearby Palm Beach County Building Guides
Juno Beach operates its own Building Department, so do not submit a Town project to a neighboring municipality just because the property is nearby. If your project is actually located elsewhere in Palm Beach County, these published guides may help:
A postal address or nearby landmark does not replace a jurisdiction check. Use the government responsible for the actual parcel.
Juno Beach Building Department FAQs
1. What is the Juno Beach Building Department phone number?
The main Town of Juno Beach Building Department number is 561-626-1122. The office is at 340 Ocean Drive, Juno Beach, FL 33408.
2. How do I apply for a Juno Beach building permit?
Create an MGO Connect account, complete contractor registration when applicable, select “Apply Online For A Permit,” enter the project information, upload the required plans and forms, pay the requested application charges and monitor the record for review comments.
3. How do I schedule a Juno Beach inspection?
Schedule inspections through MGO Connect. The Town lists inspection hours as 8:00 a.m.–4:00 p.m. Monday through Friday, excluding legal holidays, with a 4:00 p.m. cutoff on the day before the intended inspection.
4. Can I pay a Juno Beach permit fee by credit card?
Yes. The Town states that credit-card payments are available online through MGO Connect. For in-person payment at Town Center, the Town FAQ states that cash or checks are accepted.
5. Is every home-improvement project under $7,500 permit-exempt in 2026?
No. Juno Beach requires a written exemption request and Town approval. The exemption is limited to qualifying single-family residential work and excludes structural, electrical, plumbing, mechanical and gas work, properties in applicable flood hazard areas, commercial and multifamily projects, and window replacements.
6. Do I need a permit just to paint a house in Juno Beach?
The Town’s building FAQ states that ordinary interior or exterior painting does not require a building permit. Other zoning, appearance or property-association requirements may still apply in a specific situation.
7. Does a Juno Beach A/C replacement require a survey?
If the condenser is located on the ground, the Town requires a survey with the replacement condenser location marked so setback compliance can be checked. Roof and through-wall installations have different location-document requirements.
8. What are the allowed construction hours in Juno Beach?
The Town lists construction hours as Monday through Friday from 7:00 a.m. to 6:00 p.m. and Saturday from 9:00 a.m. to 5:30 p.m. Construction is not allowed on Sundays or legal holidays.
9. Do replacement windows near the beach need an extra permit?
They can. Properties within the Sea Turtle Protection Zone may require a Sea Turtle Lighting Permit for qualifying replacement windows or glass doors with a line of sight to the beach, in addition to the building permit. The zone extends 600 feet landward from the mean high-water line and may include property west of Ocean Drive.
10. How do I find an old Juno Beach permit?
Start with MGO Connect and search the available permit records. If the permit, plans or older municipal documents are not available there, use the Town’s public-records portal or contact the Building Department with the property address and known permit information.
Before You Start Work
The fastest path through Juno Beach permitting is usually not rushing to submit. First confirm exactly what you are building, check whether the property has flood, coastal, setback or appearance-review issues, gather the correct Town forms, register the contractor, and then submit one complete MGO application.
For coastal properties especially, a window replacement, exterior light, demolition, condenser, fence or seemingly small renovation can trigger a local requirement that is easy to miss if you look only at statewide rules.
Independent-site notice: USBuilding.org is an informational resource and is not operated by the Town of Juno Beach. Permit rules, staff assignments, fees, forms, emergency conditions and portal procedures can change. For a decision affecting a specific property or active permit, the Town of Juno Beach Building Department is the final authority. Information reviewed for November 2026.