Lauderdale-By-The-Sea Building Permits, Inspections & Official Services
If you are replacing a roof, installing windows or doors, remodeling a condo, building an addition, changing an air conditioner or water heater, adding a pool, installing a generator, building a fence, or starting new construction, do not begin by searching random permit websites. Start with the Town’s current permit forms and determine exactly which building, zoning, trade, Broward County, and flood-related approvals apply to your project.
Lauderdale-By-The-Sea, FL 33308
lbtsinspections@capfla.com
Open the official Lauderdale-By-The-Sea Building Division
What Does the Lauderdale-By-The-Sea Building Division Handle?
The Town contracts its building-permit and inspection services to CAP Government. The division receives permit applications, reviews construction plans, issues qualifying permits, processes plan-review corrections, coordinates required inspections, and closes permits after applicable final approvals.
Planning and zoning is related but not identical to building permitting. A construction project can comply with the Florida Building Code and still need separate zoning, setback, site-plan, right-of-way, environmental, floodplain, fire, or Broward County approval.
| User’s need | Best starting point | What to expect |
|---|---|---|
| New building permit | Town Building Division | Application, plans, supporting documents, review, fees and issuance. |
| Roof, windows, shutters or garage door | Building forms page | Project-specific packet, product approvals and wind-related documentation may be required. |
| Electrical, plumbing or mechanical work | Building Division / applicable trade permit | Separate trade permits can be required depending on scope. |
| Setbacks, use, signs or zoning | Development Services / Planning & Zoning | Confirm zoning approval before assuming a building permit can be issued. |
| County environmental or related approval | Broward ePermits OneStop | Some Town permits also require Broward County review. |
| Inspection | CAP permit portal | Request the specific inspection listed for the issued permit. |
Common Lauderdale-By-The-Sea Permit Types
The Town currently publishes separate permit packages for many common projects. Using the correct packet matters because each type can include its own supplemental forms and submission requirements.
Micro-step: Open the Town’s Building Forms & Documents page → find your exact project type → open the fillable permit package → review its checklist before uploading anything.
How to Apply for a Lauderdale-By-The-Sea Building Permit Online
The Town uses a multi-step electronic process. One detail that often confuses first-time applicants is that the permit application information and the plan/document upload functions are handled through separate parts of the electronic process.
Step 1: Download the correct permit forms
Start with the Town’s current forms page. Select the permit type that matches the actual work. Complete the applicable Broward County Uniform Building Permit Application and project-specific forms.
Step 2: Create the required online accounts
The Town explains that applicants use one account for permit/application information and inspections and another electronic plan-review account for uploading plans, documents and resubmittals.
Step 3: Enter the permit application
In the CAP permit system, be ready to enter the property address and folio, owner information, project description, construction value, owner-builder or contractor information and permit type.
Step 4: Upload plans and supporting PDFs
Plans and supporting permit documents are uploaded through the electronic plan-review/document portal. The Town states that submitted plans and documents should be uploaded in PDF format. This is also where applicants receive plan-review comments and submit corrected documents.
Step 5: Pay assessed fees
The Building Division calculates the applicable permit charges. The Town currently accepts payment by approved methods including card payments and check, depending on how the payment is made. Do not estimate your final balance only from a percentage table because additional disciplines, engineering review, surcharges or other approvals can affect the amount.
Step 6: Wait for issuance before regulated work begins
Submitting an application is not the same as receiving an issued permit. Monitor plan-review comments, respond to corrections, complete required outside approvals and confirm that the permit is actually issued before beginning work that requires authorization.
What Documents Should You Prepare?
The exact checklist depends on the permit. Do not upload a generic set of documents for every project. A window replacement needs a different package from a major addition or new home.
| Document or information | When it commonly matters |
|---|---|
| Current building permit application | Most permit submissions. |
| Property address and Broward folio number | Permit record identification and application entry. |
| Clear scope of work and construction value | Required to describe the job and calculate applicable fees. |
| Survey or site plan | Additions, new construction, pools, fences, driveways and work affecting setbacks/site layout. |
| Architectural/structural plans | New construction, structural alterations and projects requiring professional design. |
| Wind-load/product approval documents | Windows, exterior doors, shutters, roofing and other wind-sensitive products. |
| Energy calculations | Applicable new construction or alterations subject to energy-code requirements. |
| Elevation certificate/flood information | Projects affected by floodplain requirements. |
| Contractor registration documents | Licensed contractors and subcontractors working under Town permits. |
| Notice of Commencement | When required under Florida construction-lien law and the project circumstances. |
| Broward County or other agency approvals | Environmental, asbestos, fire, elevator, health, coastal or other regulated work where applicable. |
For larger additions and alterations, the Town’s published checklist can also call for contractor cost documentation, condominium or HOA approval when applicable, signed and sealed construction plans, structural calculations, wind-load calculations, product approvals, flood information, surveys, pervious/impervious calculations and other discipline-specific records.
Lauderdale-By-The-Sea Building Permit Fees in 2026
The Town adopted an updated Building Permit and Inspection Fee Schedule under Resolution 2026-25, with the schedule labeled effective July 1, 2026. Permit valuation includes the total value of labor and materials.
| 2026 fee item | Published amount |
|---|---|
| Minimum permit and plan-review fee | $90 |
| New construction | 2% of applicable total construction cost |
| Additions or alterations | 3% |
| Roofing | 1.5% |
| Swimming pool | 1.5% |
| Miscellaneous permits | 2% |
| Demolition | 1% of total demolition cost |
| Additional review discipline, including zoning | $90 each |
| Reinspection / other specified inspection | $100 per inspection, per trade, per occurrence |
| Plan revision after permit issuance | $90 per discipline, plus applicable additional permit fees |
| Change of contractor | $90 |
| Product approval/shop-drawing review after issuance | $90 |
| Permit extension before initial expiration | 5% or $95, whichever is greater |
| Work without a required permit | Double the permit fee under the published schedule |
Open Resolution 2026-25 — official 2026 fee schedule (PDF).
Important 2026 Rule: Some Single-Family Work Under $7,500 May Be Exempt
The 2026 Town fee schedule incorporates a statutory permit exemption for certain qualifying work valued at less than $7,500 on a single-family dwelling. This does not mean every small project under $7,500 can automatically be completed without a permit.
Under the Town’s adopted schedule, the exemption does not apply to:
- work on property located partially or entirely within a flood hazard area as defined by the Florida Building Code;
- electrical work;
- plumbing work;
- structural work;
- mechanical work;
- gas work; or
- a larger project divided into smaller jobs to avoid permit requirements.
To request the exemption, the owner or owner’s contractor must submit a written request and documentation showing the nature and value of the work. The Building Official determines whether the proposed work qualifies.
Notice of Commencement: Know the Current 2026 Rule
Florida’s 2026 construction-lien law requires the permitting authority to obtain applicable Notice of Commencement information before the first inspection when the direct contract is greater than $5,000. The statute provides an exception for a direct contract to repair or replace an existing heating or air-conditioning system when the amount is less than $15,000.
- Determine whether a Notice of Commencement applies to your project.
- Complete the current form with the correct owner, contractor and property information.
- Record it with the appropriate Broward County recording office when required.
- Provide the required recorded copy or recording information to the permitting authority before the first applicable inspection.
- Post the required copy at the project site.
The Town’s forms page includes a Notice of Commencement form, while Broward ePermits provides county-level instructions for associated approvals.
How to Schedule a Lauderdale-By-The-Sea Building Inspection
Once your permit is issued, the permit documents identify the inspections required for that specific project. Do not rely on a generic inspection list when your issued permit gives you a project-specific sequence.
- Find your issued permit. Have the permit number ready.
- Check the required inspection list. Confirm which inspection must occur before the next stage of work.
- Open the CAP permit portal. Sign in and open the permit under your requests.
- Select “Request an Inspection.” Choose the correct inspection and requested date.
- Submit before the cutoff. The Town publishes a 3:00 p.m. cutoff for next-day inspection requests.
- Alternative: Email the request to lbtsinspections@capfla.com.
- Check the result. Do not cover or continue past work that requires an approved inspection.
Open the Town’s official inspection instructions.
What if an inspection fails?
Read the inspector’s result carefully, correct the cited condition and request the proper reinspection. A failed inspection can result in a reinspection charge. The 2026 fee schedule lists $100 per applicable reinspection, per trade, per occurrence.
How to Search a Permit or Check Status
The CAP/Citizenserve permit system can be used to locate permit information, review activity and check inspection results. Older Town instructions indicate that a permit can be searched by permit number or property information.
- Open the Lauderdale-By-The-Sea Citizenserve portal.
- Sign in if you need access to your application dashboard or request functions.
- Use the permit search option.
- Search by the available permit or property information.
- Open the matching record.
- Review permit details, plan-review activity and inspection information available for the record.
If you cannot locate an older permit online, contact the Building Division with the property address, owner information and any permit number you have rather than submitting a duplicate application.
Contractor Registration in Lauderdale-By-The-Sea
Contractors and subcontractors performing licensed construction or alteration work must have the required registration credentials on file with the Town before applicable permits can be issued.
The Town’s published contractor-registration requirements include, as applicable:
- state registration and Broward County Certificate of Competency;
- liability insurance;
- workers’ compensation insurance or applicable exemption;
- Town of Lauderdale-By-The-Sea listed as certificate holder where required; and
- county business tax receipt.
Check the Town’s current contractor-registration instructions.
When Broward County Approval Is Also Required
A Town building permit does not necessarily replace county-level approvals. Lauderdale-By-The-Sea participates in Broward County’s ePermits OneStop system so applicants can handle associated county reviews electronically where applicable.
Depending on the work, county involvement can include environmental review, asbestos documentation, transportation concurrency, Notice of Commencement processing, elevator-related matters or another county-controlled approval.
Micro-step: Start with the Town permit → identify any county approval shown in the permit checklist or review comments → open the Town’s Broward County ePermits OneStop instructions → create/sign into the county account → submit the specific county approval → return to your Town permit record after the approval is completed.
For a deeper explanation of county-level permitting, see our Broward County Building Department guide. Nearby municipal processes can differ, which is why you should not use another city’s permit procedure for a Lauderdale-By-The-Sea property. You can also compare our Dania Beach Building Department guide and Davie Building Department guide when researching Broward County permitting differences.
Florida Building Code & Coastal Conditions in 2026
As of November 2026, the Florida Building Code, 8th Edition (2023), remains the effective statewide edition. The Florida Building Code, 9th Edition (2026), is scheduled to become effective December 31, 2026. Projects submitted around the transition should confirm which edition applies before finalizing plans.
This matters especially in Broward County because wind design, exterior openings, roofing assemblies, product approvals and related construction details are important in the High-Velocity Hurricane Zone. Lauderdale-By-The-Sea properties may also have floodplain requirements that affect elevation, substantial improvements, additions and new construction.
Do not buy windows, doors, roofing products or other regulated exterior components only because a salesperson says they are “Florida approved.” Confirm that the exact product, approval, design pressure and installation method are acceptable for the specific project.
Common Problems That Delay a Permit
| Problem | Practical next step |
|---|---|
| Wrong permit package | Return to the Town forms page and use the packet that matches the actual scope. |
| Missing contractor information | Verify Town registration and current license/insurance documentation. |
| Plans uploaded in the wrong place | Application data is entered in the permit system; plans/documents go through the electronic plan-review upload process. |
| County approval still open | Check Broward ePermits OneStop and complete the specific outside review. |
| Flood information missing | Confirm whether the project requires elevation, survey or floodplain documentation. |
| Inspection cannot proceed | Confirm permit status, correct inspection type, Notice of Commencement requirements and outstanding holds. |
| Permit expired | Contact the Building Division promptly. The 2026 schedule provides a limited reinstatement process within six months after expiration, subject to its conditions. |
| Work already started without a permit | Stop and contact the Building Division. The published fee schedule provides for double permit fees for work performed without a required permit. |
Lauderdale-By-The-Sea Building Department FAQs
1. Where is the Lauderdale-By-The-Sea Building Department?
The Town’s Building Division operates from 4501 North Ocean Drive, Lauderdale-By-The-Sea, Florida 33308.
2. What is the Lauderdale-By-The-Sea Building Department phone number?
For general building-permit assistance, call 954-640-4215. The general Building Division email is building@lbts-fl.gov.
3. Can I apply for a Lauderdale-By-The-Sea building permit online?
Yes. The Town uses CAP/Citizenserve-based online services for permit information, electronic plan review, document uploads, plan-review responses and inspections. The Town also provides paper submission for applicants unable to use the online process.
4. How do I find the correct permit form?
Open the Town’s Building Forms & Documents page and select the exact project type. Current packets include new construction, additions and alterations, roofing, windows and shutters, pools, fences, generators, air-conditioning change-outs, water heaters and other common projects.
5. How much is a Lauderdale-By-The-Sea building permit in 2026?
There is no single flat price. Resolution 2026-25 lists a $90 minimum permit and plan-review fee, with many permits calculated as a percentage of construction value. New construction is listed at 2%, additions or alterations at 3%, roofing at 1.5% and miscellaneous permits at 2%, before other applicable charges.
6. Is work under $7,500 exempt from a building permit?
Only certain qualifying work on single-family dwellings may qualify. The exemption does not cover electrical, plumbing, structural, mechanical or gas work, work in a qualifying flood hazard area, or projects split into smaller jobs to avoid permitting. A written exemption request and supporting documentation are required, and the Building Official determines eligibility.
7. How do I schedule a building inspection?
Use the CAP online permit portal and select the inspection request option for your issued permit, or email lbtsinspections@capfla.com. The Town currently publishes a 3:00 p.m. cutoff for next-day requests.
8. Do Lauderdale-By-The-Sea permits also require Broward County approval?
Some do. Depending on the project, Broward County environmental, asbestos, transportation, Notice of Commencement, elevator or other reviews may be required. The Town participates in Broward County ePermits OneStop for associated county approvals.
9. What Florida Building Code applies in Lauderdale-By-The-Sea in November 2026?
The Florida Building Code, 8th Edition (2023), remains the effective statewide edition in November 2026. The 9th Edition (2026) is scheduled to become effective December 31, 2026.
10. Can I start work as soon as I submit the permit application?
No. An application submission is not an issued permit. Complete required reviews, corrections, outside approvals and fee payment, then confirm that the permit has actually been issued before starting regulated work.
Before You Submit
For most users, the fastest path is simple: identify the exact project → download the correct Town permit packet → prepare the property, contractor, plans and supporting documents → create the required online accounts → submit the application → upload plans in the electronic review system → complete Broward County or zoning approvals if required → pay assessed fees → obtain the issued permit → request each required inspection before covering the work.
Getting the first submission right can save far more time than rushing an incomplete application. If a requirement is unclear, contact the Building Division at 954-640-4215 or building@lbts-fl.gov before paying for plans, products or construction that may not meet the project’s requirements.