Livingston County, Michigan Building Department 2026: Permits, Inspections & Services

Livingston County Building Permits, Inspections & What to Do First

Quick answer: The Livingston County Building Department handles building permits, electrical, plumbing and mechanical permits, plan review, construction inspections, permit records and occupancy approvals for much of Livingston County, Michigan. The office is at 2300 E. Grand River Ave., Howell, MI 48843. The main phone number is 517-546-3240.

You can apply for eligible permits, search existing records, pay Building Department fees and schedule inspections through Livingston County’s BS&A Online portal. Before applying, however, many projects need township land-use approval and may also need driveway, soil-erosion, well or septic approvals.

Important jurisdiction warning: the Livingston County Building Department does not issue building or trade permits for the City of Howell or Green Oak Township. Those jurisdictions operate their own permitting systems.

Building Department Livingston County Building Department
Office 2300 E. Grand River Ave., Howell, MI 48843
Main Phone 517-546-3240
Inspection Request Line 517-546-3830
Office Hours Monday–Friday, 8:00 a.m.–5:00 p.m.
Permit Counter Hours Monday–Friday, 8:00 a.m.–4:00 p.m.

First Confirm Who Actually Issues Your Permit

This is an easy step to skip, but it can prevent a wasted application. Livingston County provides Building Department services to many local communities, while townships and villages may still control zoning, land use, setbacks and site-plan approval.

The County specifically states that City of Howell and Green Oak Township are outside the Livingston County Building Department’s jurisdiction. If the project is in either location, use that municipality’s own building office instead.

Local tip: A Howell mailing address does not automatically mean that a property is inside the City of Howell. Confirm the actual municipality or township for the parcel before deciding which permit office to use.

Township or village approval may come before the County permit

For most projects, building-code approval and zoning approval are separate. Livingston County publishes local-unit requirements showing that several municipalities want zoning compliance, township-stamped plans or a stamped site plan before the County issues its building permit.

Local unit Published local requirement before/alongside County permitting
Conway TownshipTownship-stamped plans and site plan
Cohoctah TownshipTownship zoning compliance
Deerfield TownshipZoning compliance and township-stamped plans
Handy TownshipZoning compliance and stamped site plan
Brighton TownshipTownship-stamped plans
Hamburg TownshipZoning compliance, stamped plans and site plan
Howell TownshipZoning compliance plus township-stamped plans and site plan
Village of FowlervillePlans and site plan stamped by the Village
Genoa TownshipTownship-stamped plans and site plan
Hartland TownshipTownship-stamped plans and site plan
Marion TownshipZoning compliance plus township-stamped plans and site plan
Putnam TownshipZoning compliance and stamped plans
Village of PinckneyPutnam Township zoning compliance and stamped plans
City of HowellIssues its own permits; do not use Livingston County Building Department
Green Oak TownshipIssues its own permits; do not use Livingston County Building Department

For the County’s current municipality-by-municipality list, use the official zoning compliance requirements page.

How to Apply for a Livingston County Building Permit

Do not start with the permit application if your project still needs other local approvals. For new homes, additions and many larger projects, the practical order matters.

  1. Confirm jurisdiction. Make sure Livingston County Building Department serves the property. City of Howell and Green Oak Township projects go elsewhere.
  2. Get the local land-use or zoning approval. Contact the township, city or village responsible for the property. Obtain stamped plans or a site plan if that local unit requires them.
  3. Handle driveway approval when applicable. New driveway approaches and work in a County road right-of-way generally require Livingston County Road Commission approval. Start at the Road Commission Permit Office.
  4. Make sure a vacant lot has an address. Livingston County states that a vacant parcel must have an address before a building-permit application can be filed. Address assignment depends on the property’s location.
  5. Check soil-erosion requirements. Construction involving earth disturbance may require a Soil Erosion and Sedimentation Control permit or waiver through the Drain Commissioner’s office. Review the County SESC requirements.
  6. Handle well and septic approval if the property is not on municipal utilities. A new septic system requires an approved soil evaluation before the septic permit. Start with Livingston County Environmental Health.
  7. Prepare the building application and plans. Download the current application/checklist from the County’s Forms & Resources page.
  8. Submit through BS&A or follow the County’s form instructions. In BS&A choose Apply for a Permit, identify the correct property, select the permit type, describe the work and attach the required drawings and approvals.
  9. Watch the application status. An online submission is a request for a permit, not permission to begin construction. The Building Department must review and issue the permit first.
  10. Pay the required fees and keep the issued permit available. BS&A also provides fee payment, permit-record search and inspection scheduling.
Online submission detail that can save a rejected upload:

The County’s BS&A application page instructs applicants to submit plans and site plans that are clear, legible, black-and-white and drawn to scale. The portal currently states that the average plan-review time for a building submittal is about 10 business days.

For online submittals, a printing charge of $0.50 per page, rounded to the nearest dollar, has applied since December 1, 2025.

What to Prepare Before You Submit

Residential building projects

For a typical residential permit, Livingston County asks for project and property information plus detailed drawings. Requirements vary by job, but new-home and substantial residential submissions commonly include:

  • Property address, parcel/tax information, lot and section information
  • Proof of property ownership
  • Owner, contractor, architect or engineer information
  • Description and scope of work
  • Water-supply and sewage-disposal information
  • Approved land-use documents from the local municipality
  • Site plan
  • Foundation plans
  • First- and second-floor plans where applicable
  • Front, side and rear elevations
  • Framing details
  • Square footage for floors, garages, bonus areas, decks and porches
  • Required energy/insulation information
  • Applicable soil-erosion, well, septic and driveway approvals or waivers
  • Identification and builder-license information when applicable

Livingston County’s residential guidance states that signed and sealed professional drawings are required for certain projects, including residential work over 3,500 square feet, log homes, wood foundations and other alternative construction not addressed by the standard code provisions.

Commercial applications need a deeper plan set

Commercial submissions can require sealed drawings, structural calculations, occupancy information, design loads, rated assemblies, accessibility details, door and glazing schedules, electrical/plumbing/mechanical design and a list of required special inspections.

The County also makes an important distinction: electrical, plumbing and mechanical permits are separate from the building permit. Do not assume the building application automatically authorizes trade work.

Which Michigan building codes apply?

Michigan’s Department of Licensing and Regulatory Affairs currently lists the 2021 Michigan Building Code as the current building code, effective April 9, 2025. LARA separately lists the 2015 Michigan Residential Code as the current residential code for applicable one- and two-family residential work.

Because different trades and project types can involve separate state codes and amendments, verify the current code edition before finalizing plans. The official reference is the Michigan LARA Code Books page.

Livingston County Building Permit Fees in 2026

There is not one flat price for every building permit. A project can have a plan-review charge, a building-permit charge, trade-permit fees and separate zoning, driveway, soil-erosion, septic or other agency fees.

Published fixed plan-review fees

Project Published plan-review fee
New residential building / residential addition$150
Remodel / finished basement$100
Deck$150
Pole barn, garage or storage building$75
Modular home$100
Pool$125
Hot tub$75
Solar panels$100
Demolition$75
Commercial re-occupancy$100
Sign / retaining wall / basement egress window$75

Do not treat these figures as your total project cost. They are plan-review charges published by the County. Building-permit and trade-permit fees may be added separately.

Commercial plan-review calculation

Commercial construction value Plan-review calculation
$300,000 or less$450
Over $300,000 through $2.5 million0.0015 × project value
Over $2.5 million through $5 million$3,750 + 0.0005 of value over $2.5 million
Over $5 million$5,000 + 0.0004 of value over $5 million

The County’s current fee schedule also states that calculated permit fees for applicable new construction are based on the current ICC building-valuation data, project square footage and the County multiplier. Because the valuation table can be updated, use the live fee calculation or contact plan review rather than estimating a major project from an old table.

Other costs worth knowing:
  • Re-inspection fee: $80 when work is incomplete, incorrect, not ready or inaccessible.
  • 180-day building-permit extension for good cause: $75, subject to Building Official approval.
  • Temporary Certificate of Occupancy: $100.
  • Special inspection for work performed without a permit: published fee of $250.

Check the live Livingston County Building Department fee page before paying because fees and valuation tables can change.

How to Schedule Livingston County Building Inspections

Once a permit is issued, inspections must be requested at the required construction stages. Livingston County allows online scheduling through BS&A and also operates an automated inspection phone system.

Online method

  1. Open the Livingston County BS&A portal.
  2. Select Schedule an Inspection.
  3. Locate the permit record.
  4. Choose the correct inspection type.
  5. Submit the request and keep the confirmation.

Automated phone method

  1. Call 517-546-3830.
  2. Press 1 to schedule an inspection.
  3. Select the permit prefix: BLD, ELE, MEC, PLM or COD.
  4. Enter the numerical part of your permit number followed by #.
  5. Enter the three-digit inspection code.
  6. Listen to the system repeat the request before finishing the call.

The County currently accepts inspection scheduling through midnight. Requests received after midnight are processed as if received the next workday. The published cancellation cutoff is 5:00 a.m..

Useful inspection codes

Code Inspection
002Footings / post holes
004Backfill / open hole
006Compaction
008Rough building
010Insulation
016Final building
022Rough plumbing
024Final plumbing
032Rough electrical
034Final electrical
044Rough heating / mechanical
046Final heating / mechanical
One Livingston County rule that can save you $80:

Do not schedule rough building inspection code 008 before rough plumbing 022, rough electrical 032 and rough heating 044 are completed. The County specifically warns that scheduling the building rough too early can result in a failed inspection and an $80 re-inspection charge.

Similarly, the final building inspection depends on required trade finals being completed. Do not cover or conceal work before the applicable inspection.

What if an inspection fails?

Read the correction result, fix every listed item and leave the corrected work accessible. Re-inspection fees can be paid online after the rejection is posted. Once payment is received, the re-inspection can be scheduled.

Inspection results are generally available after the inspection is completed and may take up to the following day to appear. For detailed notes, the online permit record is more useful than the automated phone result.

You do not need to call the office just to check many current permit records. BS&A provides a public Building Department record search.

  1. Open Livingston County BS&A Online.
  2. Select Building Department Record Search.
  3. Search using the available property or permit information.
  4. Open the matching record.
  5. Review permit status, fees, inspections and other available record details.

This can be particularly useful before buying a property, checking whether old work was finalized, confirming whether a contractor requested an inspection or finding the status of an active application.

If you are trying to understand how county permit jurisdiction works in general, see our county building department guide. For another Michigan county example, our Clinton County Building Department guide explains a separate Michigan permit system. Township permitting can differ again; compare the process with our Canton Township building permit guide.

Certificate of Occupancy: Do Not Skip the Final Step

Finishing construction does not automatically mean the building can be occupied. When a Certificate of Occupancy is required, Livingston County will not issue it until the applicable final requirements are complete.

The County’s current process says the applicant should make sure:

  • All required inspections are completed and approved.
  • Township zoning compliance is completed and submitted when required.
  • Any required blown-cellulose insulation affidavit is completed.
  • Environmental Health has given final approval for applicable well and septic work.
  • Outstanding Building Department fees are paid.
  • The proper Certificate of Occupancy application is submitted.

Livingston County says a complete Certificate of Occupancy application generally needs a minimum of 48 hours for processing. A Temporary Certificate of Occupancy is reviewed case by case and currently carries a $100 fee.

Download residential, commercial and temporary applications from the official Certificate of Occupancy page.

What Happens If Your Permit Expires?

The County’s fee policy treats a permit as inactive after 180 days without qualifying progress. An approved inspection extends the active period for that trade another 180 days. A failed inspection does not extend the permit.

A building permit may be extended for another 180 days when good cause is demonstrated and the Building Official approves the request. The published extension fee is $75. An already expired permit is not handled the same way as a normal extension.

For expired, voided or contractor-takeover projects, the County may require a continuation permit. Depending on the situation, that can mean a new application, ownership verification, updated land-use documents, updated Environmental Health or Drain approvals and revised plans.

Practical Livingston County Tips Before You Spend Money

  • Do zoning first. A building permit does not override township setbacks, land-use rules or site-plan requirements.
  • Do not use the City of Howell just because your mailing address says Howell. Verify the parcel’s actual jurisdiction.
  • Do not start permit-required work after merely submitting online. Wait until the permit is issued.
  • Have the vacant parcel addressed before applying. The County requires an address for permit submission.
  • Think about septic early. If a home uses a private well or septic system, additions, enclosed decks, pole barns and similar changes can require Environmental Health review.
  • Check soil disturbance before excavation. The Drain Commissioner’s office notes that residential earth disturbance can require either an SESC permit or waiver.
  • Do not request an inspection just to “get on the schedule.” Work that is not ready can create a re-inspection charge.
  • Remember the permit counter closes before the office. Office hours continue until 5:00 p.m., but published permitting hours end at 4:00 p.m.
Need Official resource
Building Department Livingston County Building Department
Apply, pay, search or schedule Livingston County BS&A Online
Applications and checklists Building Forms & Resources
Residential requirements Residential Building Permits
Commercial requirements Commercial Building Permits
Inspection rules Building Inspections
Inspection codes Inspection Codes
Driveway / road approach Livingston County Road Commission Permit Office
Soil erosion Drain Commissioner SESC Program
Well and septic Environmental Health Septic Permits

Livingston County Michigan Building Department FAQs

1. Where is the Livingston County Building Department?

The office is at 2300 E. Grand River Ave., Howell, Michigan 48843. The main Building Department phone number is 517-546-3240. Published office hours are Monday through Friday, 8:00 a.m. to 5:00 p.m., while permitting hours end at 4:00 p.m.

2. Does Livingston County issue building permits for the City of Howell?

No. The County Building Department states that the City of Howell is outside its building-permit jurisdiction. Use the City of Howell’s own permitting office for property actually located inside the city limits.

3. Does Livingston County issue permits in Green Oak Township?

No. Green Oak Township issues its own building and trade permits. Do not submit a Green Oak project through the Livingston County Building Department portal.

4. Can I apply for a Livingston County building permit online?

Yes. Livingston County uses BS&A Online for services including permit applications, fee payment, Building Department record searches and inspection scheduling. A submitted application is still subject to County review before a permit is issued.

5. How long does Livingston County building permit review take?

The current online application portal states that the average building plan-review time is approximately 10 business days. Complicated projects, incomplete submissions and required corrections can take longer.

6. How do I schedule a Livingston County building inspection?

Use Livingston County BS&A Online or call the automated inspection line at 517-546-3830. Have the permit number and correct three-digit inspection code ready.

7. How much is a Livingston County building permit?

There is no single price. Fees depend on project type, valuation, square footage and required inspections. Separate plan-review, building, electrical, mechanical or plumbing charges may apply. For example, the County publishes a $150 plan-review fee for new residential buildings/additions and $100 for remodeling or finished basements.

8. Do I need township zoning approval before applying to Livingston County?

Often, yes. Many Livingston County townships require a land-use permit, zoning compliance, stamped plans or an approved site plan before or as part of the County permit process. Check the requirement for the exact municipality where the property is located.

9. Can a homeowner pull a building permit in Livingston County?

The County’s homeowner policy allows a permit to be issued to an eligible property owner for the owner’s own use and occupancy. Proof of ownership can be required. Trade work and contractor licensing rules can differ, so verify the specific permit type before filing.

10. How long does a Livingston County Certificate of Occupancy take?

The County says a minimum of about 48 hours is generally needed after a complete Certificate of Occupancy application and all required documents are received. Final inspections, zoning approval where applicable, septic/well approval and outstanding fees must be completed first.

Bottom Line

For most Livingston County projects, the fastest path is not simply “apply online.” First confirm that Livingston County has jurisdiction, complete township zoning or land-use requirements, address driveway, soil-erosion and septic issues when applicable, then submit a complete permit package through the County’s process.

Once the permit is issued, follow the inspection sequence carefully—especially the rough electrical, plumbing and mechanical inspections required before rough building inspection. Finish the project by completing all applicable finals and obtaining the Certificate of Occupancy when required.

Information reviewed November 4, 2026. Permit fees, code editions, forms, inspector assignments and local requirements can change. USBuilding.org is an independent informational resource and is not Livingston County government. Use the official links above for final submission, payment and project-specific confirmation.