Quick answer: Building permits, construction plan review and building inspections inside the City of Long Beach are handled primarily by the City of Long Beach Community Development Department, Building and Safety Bureau. The Development Permit Center is at 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802. For permit help, call 562-570-PMIT (7648).

If you are remodeling a home, replacing windows, adding an ADU, upgrading electrical service, installing plumbing or HVAC, building an addition, opening a commercial space or checking an old permit, this guide explains which Long Beach service to use and what to prepare before you reach the City.

Building & Safety phone 562-570-PMIT (7648)
Permit Center 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802
2026 code cycle 2025 California Building Standards Code + Long Beach Municipal Code
Inspection requests Building inspection requests must be submitted online, not by phone

Long Beach Building & Safety Contact Information

Service Current information
Agency City of Long Beach Community Development Department – Building and Safety Bureau
Permit Center 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802
Permit assistance 562-570-PMIT (7648)
Community Development general line 562-570-LBCD (5223)
Permit Center hours Mon, Tue, Thu, Fri: 8:00 a.m.–4:00 p.m.
Wednesday: 9:00 a.m.–4:00 p.m.
Lunch closure Noon–1:00 p.m.
Official Building & Safety page Long Beach Building & Safety
Local time-saving tip: Appointments are encouraged. The City also accepts walk-ins, but its appointment page says walk-ins are not accepted from 11:30 a.m. to 1 p.m. or after 3:30 p.m. If you need plan review rather than a simple information question, scheduling ahead is usually the safer option.

Do You Need a Long Beach Building Permit?

Most construction, alterations, replacement work and repairs require permits when the work affects regulated building, electrical, plumbing or mechanical systems. A small job is not automatically exempt.

Long Beach does publish specific exemptions. The examples below are useful for an initial check, but zoning, coastal, historic and trade-permit requirements can still apply even when a building permit is not required.

Work Long Beach rule to know
Small detached shed / playhouse May be exempt when no more than 120 sq. ft. and 8 ft. high, with no plumbing, electrical or mechanical installation.
Fence Wood, vinyl, wrought iron and similar fences up to 6 ft. 6 in. may be exempt from a building permit.
Retaining wall / planter box May be exempt up to 4 ft. high when it does not support a surcharge or sloping earth.
Deck, private walkway or driveway May be exempt when no more than 30 in. above adjacent grade.
Small roof repair Application of roofing up to 100 sq. ft. on an existing structure within a 12-month period may be exempt.
Drywall / plaster repair Patch or repair totaling up to 10 square yards may be exempt.
Interior paint and common finishes Painting, wall treatments and similar minor interior decoration generally do not require a construction permit.
Do not assume replacements are exempt. Long Beach specifically identifies projects such as replacement windows, patio covers or gazebos, and replacement of sinks, toilets or dishwashers as examples of work that can require permits.

Before buying materials, use the City’s official Do I Need a Permit? page or call 562-570-PMIT with the exact property address and work description.

Which Permit Process Applies to Your Project?

Long Beach does not put every project through the same process. Choosing the correct review path first can save a wasted trip or an incomplete application.

Permit path Typical projects What happens
Express Permit Some window replacements, limited kitchen/bathroom repairs, reroofing and other qualifying simple work No construction-plan submittal is required when the work satisfies the Express Permit rules.
Over-the-Counter Plan Review Qualifying minor additions, some ADUs, residential patios, minor tenant improvements and selected fire work Plans are reviewed during an in-person Permit Center appointment.
Submitted Plan Review New construction, larger additions, significant alterations and complex projects Plans are formally submitted and routed to the applicable review groups before permit issuance.

Express permits have important limits

Long Beach Information Bulletin IB-058 explains that an Express Permit is intended for relatively simple construction where plans, calculations and reports are not required for plan review.

Examples listed by the City include qualifying like-for-like window or door replacement, limited kitchen or bathroom repair, certain reroofing, some stucco work, small framing repairs and qualifying electrical, plumbing or mechanical work.

Coastal and historic properties are different: IB-058 states that projects in a Coastal Zone, Historic District or qualified historical building do not use the normal Express Permit path.

How to Get a Building Permit in Long Beach

  1. Confirm the project address is under City of Long Beach jurisdiction. Do not choose a permit office only from the mailing address. Special locations can involve additional Harbor, coastal, Fire, Health, Public Works or other approvals.
  2. Write down the complete scope. Include structural work, windows, electrical, plumbing, HVAC, demolition, grading, signs and other work. A project involving several trades may use the City’s consolidated APP-001 Development Permit Application.
  3. Check whether the work is exempt, Express, OTC or Submitted Plan Review. Use the City’s permit pages before preparing a large plan package.
  4. Check Planning conditions early. Zoning, historic-district status, coastal-zone location, setbacks, land use or other Planning rules can affect a project even when the building work itself is straightforward.
  5. Prepare the correct application and owner/contractor forms. For plan-review projects, prepare drawings and required calculations or technical documents.
  6. Schedule the correct Permit Center service. For OTC or submitted plan review, use the official appointment system and describe the project clearly in the appointment notes.
  7. Submit plans and pay plan-check fees when required. Long Beach states that digital PDF application materials may be brought on a USB device for applicable in-person submissions.
  8. Respond to every plan-check correction. Revised plans should address the comments from Building, Planning, Fire, electrical, plumbing, mechanical, Health or other reviewing agencies assigned to the project.
  9. Obtain the issued permit before regulated construction starts. Approval of a drawing or submission does not by itself authorize work.
  10. Schedule inspections at each required construction stage. Do not conceal work that still requires inspection.
  11. Complete final inspection and occupancy approval when required. New construction, additions and changes of occupancy may require a Certificate of Occupancy after the necessary approvals are complete.
Owner vs. contractor: Long Beach states that permits may be issued to properly licensed contractors with an active Long Beach business license or to eligible homeowners of one- or two-family dwellings under the City’s owner-builder rules. Contractors with employees must provide workers’ compensation information as required.

Forms and Documents to Prepare

The exact package depends on the job. For a typical project, prepare the address, owner information, applicant information, contractor information when applicable, a clear work description and the documents required for your permit path.

Form Typical use
APP-001 Development Permit Application for projects involving more than one scope such as building, grading, fire, electrical, mechanical, plumbing, landscape or signs.
APP-011 Express Building Permit Application
APP-012 Express Electrical Permit Application
APP-013 Express Plumbing Permit Application
APP-014 Express Mechanical Permit Application
FORM-005 California Licensed Contractor’s Declaration and Owner-Builder’s Declaration
FORM-006 Permit proxy used when an authorized representative acts in place of the owner, owner-builder or contractor.
FORM-028 Plot plan used for applicable Express and OTC applications.

Download the current versions instead of keeping an old copy on your computer: Long Beach Building & Safety Applications and Forms.

Plan requirements

For work requiring construction documents, Long Beach states that plans should generally be at least 18 x 24 inches, drawn at a scale of at least 1/4 inch per foot, and clearly show the location, nature and extent of the proposed work and compliance with applicable codes.

Long Beach Building Permit Fees in 2026

There is no single flat building-permit price. Fees can include the building permit, plan review, electrical/plumbing/mechanical permits, Planning review, state surcharges and project-specific charges.

The City’s current Building Permit & Plan Check Fee schedule lists fee changes effective May 20, 2026. The standard building plan-check fee is generally 85% of the building permit fee, with a minimum of $154.

Construction valuation Building permit fee shown by City schedule
Up to $500 $101
$501–$2,000 $101 for first $500 + $3 per additional $100 or fraction
$2,001–$20,000 $149 for first $2,000 + $16 per additional $1,000 or fraction
$20,001–$50,000 $441 for first $20,000 + $11 per additional $1,000 or fraction
$50,001–$100,000 $786 for first $50,000 + $10 per additional $1,000 or fraction
$100,001–$1,000,000 $1,264 for first $100,000 + $6 per additional $1,000 or fraction
$1,000,001+ $6,506 for first $1 million + $6 per additional $1,000 or fraction
Budgeting shortcut: Long Beach says that for many construction projects, total plan-check, permit, inspection and other agency fees may be roughly 2% of building costs. Treat that only as early budgeting guidance—the actual invoice depends on the project.

Other current charges can matter. The City’s fee schedule lists off-hour inspections at $328 per hour when approved by the Building Official and special inspections at $235 per hour. The City’s inspection FAQ also states that a $113 reinspection fee may be assessed when work is not ready, corrections remain incomplete, approved plans are unavailable or the inspector cannot access the site.

Construction and demolition recycling costs

For projects subject to Long Beach’s Construction & Demolition Debris Recycling Program, the City’s current schedule lists a processing charge of $230 for residential projects and $425 for commercial/industrial projects. The applicable waste-diversion deposit is listed as 3% of project valuation, with a minimum of $1,712 and maximum of $56,999.

Always confirm the current amount on the official Long Beach fee schedules before paying.

How to Schedule a Long Beach Building Inspection

This is one place where knowing the City’s exact process matters: Building inspection requests are not accepted by phone. They must be submitted through the Building & Safety inspection page.

  1. Open the official Building Inspection page.
  2. Use the online inspection-request form.
  3. Submit the request by 3:00 p.m. on the business day before the requested inspection day.
  4. If the request arrives after 3:00 p.m., the City’s inspection bulletin states it will be scheduled for the second business day following the request.
  5. On the inspection day, check the posted daily schedule. Long Beach says schedules are normally posted by 8:00 a.m. or earlier.
  6. Keep approved plans, construction documents and the job inspection card available at the site.
  7. Provide safe access, including appropriate ladders, lighting and a clear work area when needed.
Need to cancel? Email DV-CancelInspections@longbeach.gov with your name, project number and project address. The City says the cancellation email must arrive by 8:00 a.m. on the inspection day.

Residential inspectors provide combined trade inspection services for one- and two-family dwellings and related accessory structures. Commercial inspection services are separated by trade for multifamily, commercial and industrial buildings.

For Health or Fire inspections, do not use the normal building-inspection request as a substitute. The Building Inspection page currently lists 562-570-4132 for Health inspections and instructs applicants to contact the Fire Inspector identified on the job or permit notice card for Fire inspections.

How to Check a Long Beach Permit, Plan Review or Building Record

Long Beach provides separate search options depending on what you need.

You need What the City search uses
Plan review status Use the project/application number assigned when the project was screened and routed for review.
Permit status or permit history Search building-permit information, including project number, description and inspection final date when available.
Historical records Search by property address for available Certificates of Occupancy, plot plans, reports and other archival construction records.

Micro-step: search a permit by address

  1. Open the City’s Project Status Search Tools.
  2. Select Building Permit Status Search by Address or General Building Permit Records Search by Address.
  3. Enter the street address using the format requested by the City.
  4. Review the project number, project description and final-inspection information available for the record.
  5. If nothing appears, do not assume no permit exists—the City warns that not all addresses and statuses are available through the online search.

If the record cannot be located online, use the City’s Permit Status / Records page. Historical architectural plans generally cannot simply be downloaded online. Long Beach directs users to the Resource Center at the Permit Center to view architecturally drawn plans in its records system, subject to applicable access rules.

Which Building Code Applies in Long Beach in 2026?

For projects submitted on or after January 1, 2026, Long Beach states that projects must comply with the 2025 California Building Standards Code together with applicable provisions of the Long Beach Municipal Code.

The statewide code set includes the California Building, Residential, Electrical, Mechanical, Plumbing, Energy, Fire, Existing Building, Historical Building and CALGreen standards, among other parts.

Do not design a 2026 project from an old 2022-code checklist. The code edition is tied to the rules in effect for the applicable submittal. Confirm current requirements before completing drawings or engineering.

Official code information: Long Beach Building Standards Code.

Plan-check applications also have an expiration period

The City’s Plan Review Service states that a plan-review application is valid for 12 months from the permit-application date. The Building Official may consider extensions of up to 180 days each when the required conditions are met. Extension requests should be made before the application expires.

After a permit is issued, the City’s current building-permit page states that it becomes void if authorized work is not started within 90 days, or when work is suspended or abandoned for 90 days after it begins. For an older or inactive permit, confirm the current record with Building & Safety before restarting work.

Long Beach Local Issues That Can Change Your Permit

1. Coastal Zone

Long Beach has substantial coastal areas, so a project near the shoreline may require more than a building permit. The Planning Bureau states that development in the City’s coastal zone generally requires either a Local Coastal Development Permit or a Coastal Permit Categorical Exclusion, depending on the project and location.

There are also different coastal jurisdictions: some areas are handled by Long Beach, some City decisions are appealable to the California Coastal Commission, and some locations fall under Coastal Commission permit jurisdiction.

2. Historic districts

Permit exemptions and Express Permit assumptions can change for historic properties. Long Beach advises property owners to contact Planning at 562-570-6194 before beginning work on property in a Historic District.

3. Additional agency approvals

Some projects may need separate approvals from Fire, Health, Public Works, the Harbor Department, air-quality regulators or utility agencies. Building & Safety’s inspection guidance notes that these requirements should generally be identified during the review process, but checking them early can prevent a permit from reaching “approved” status while another clearance remains unresolved.

4. Right-of-way work is not just a building permit

If a dumpster, construction activity or equipment will occupy the public sidewalk or street, a Public Works permit may be required. Long Beach specifically says a dumpster placed in the public right-of-way requires Public Works approval, while a container entirely on private property does not require that particular right-of-way permit.

Practical Ways to Avoid Long Beach Permit Delays

  • Check zoning, coastal-zone and historic-district conditions before paying for final construction drawings.
  • Give Building & Safety the complete scope instead of describing only the largest part of the project.
  • Use the current APP and FORM documents from the City’s website.
  • If plans are required, make sure drawings clearly match the project description on the application.
  • Bring digital PDF files in the format requested for your appointment.
  • Do not assume an Express Permit applies to a coastal or historic property.
  • Resolve Planning, Fire, Health, Public Works or Harbor clearances as early as possible.
  • Do not begin regulated work until the permit is issued.
  • Submit inspection requests before the City’s 3:00 p.m. cutoff.
  • Do not cover framing, wiring, plumbing or other work that still requires inspection.
  • Keep approved documents and the inspection card available on site.
  • Complete final inspection instead of leaving a permit open after construction is physically finished.
A small detail that can save a second visit: when booking an in-person appointment, include the project address and a short but specific scope of work in the appointment notes. The City asks for this information and may use it to determine the correct service before you arrive.

Make Sure You Are Using the Right California Building Department

Long Beach Building & Safety is for projects within Long Beach’s jurisdiction. If the property is in another city, do not submit to Long Beach just because the location is elsewhere in Los Angeles County.

For other California jurisdictions, these existing guides may help you compare the correct local process: Los Angeles Building Department, Carson Building Department, Anaheim Building Department, and Buena Park Building Department.

Official Long Beach Permit Resources

Permit procedures, forms, counter schedules and fees can change. Use the information above to prepare your project; use the linked City of Long Beach service at the final submission, payment or inspection-request step.

Long Beach Building Department FAQs

1. Where is the Long Beach Building Department?

The City of Long Beach Building and Safety Bureau serves customers through the Development Permit Center at 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802. The main permit-assistance number is 562-570-PMIT (7648).

2. Do I need a permit to remodel a house in Long Beach?

Often, yes. Structural changes, window replacement, electrical, plumbing, mechanical work and many kitchen or bathroom projects can require permits. Some minor finish work and specifically listed small repairs are exempt. Check the City’s Do I Need a Permit page using your exact scope.

3. Can a homeowner apply for a Long Beach building permit online?

Not every permit is available through a general homeowner self-service system. Long Beach’s Internet Permitting Request service is limited to registered California-licensed contractors with a pre-authorized PIN for qualifying simple projects. Homeowners should use the Permit Center instructions for their specific permit type.

4. What is the cutoff for requesting a Long Beach building inspection?

Building inspection requests should be submitted online by 3:00 p.m. on the business day before the requested inspection date. Requests received after 3:00 p.m. are scheduled for the second business day following the request under the City’s published inspection procedure.

5. How much does a Long Beach building permit cost?

The amount depends on construction valuation, plan review, trades and other required services. The current building-permit schedule begins at $101 for valuations up to $500, and standard building plan review is generally 85% of the building permit fee with a $154 minimum. Additional project-specific fees may apply.

6. How do I check a building permit in Long Beach?

Use the City’s Project Status Search Tools. You can search plan-review status by project/application number and building-permit status or historical records by address. If an older record is not available online, contact Building & Safety or use the Permit Center’s records service.

7. What building code does Long Beach use in 2026?

Beginning January 1, 2026, Long Beach requires applicable projects to comply with the 2025 California Building Standards Code together with the Long Beach Municipal Code and other applicable local requirements.

8. What projects qualify for an Express Permit in Long Beach?

Qualifying simple work can include certain like-for-like window or door replacements, limited kitchen and bathroom repairs, some reroofing, stucco, framing repair and eligible trade work. The exact limits are listed in Information Bulletin IB-058. Coastal-zone and historic-property projects do not use the standard Express Permit path.

9. How long is a Long Beach building permit valid?

The City’s current permit guidance states that an issued permit becomes void when authorized work is not started within 90 days of issuance or when work is suspended or abandoned for 90 days after it starts. Plan-review applications generally have a separate 12-month validity period.

10. Do coastal or historic Long Beach properties have extra permit requirements?

Yes. Development in the coastal zone may require a Local Coastal Development Permit or Coastal Permit Categorical Exclusion in addition to construction permits. Historic District properties can require Planning review before work begins. Confirm the address with Long Beach Planning before relying on normal permit exemptions or Express Permit rules.

Best Way to Start Your Long Beach Project

For most people, the safest order is simple: confirm the property is in Long Beach jurisdiction, check zoning and coastal or historic conditions, decide whether the work is exempt, Express, OTC or full plan review, download the current forms, and then use the official Permit Center only when you are ready to submit.

That preparation matters because the permit itself is only one part of the process. A successful Long Beach project may also involve Planning, Fire, Public Works, Health, Harbor or utility requirements, followed by inspections and final approval. Knowing those steps before construction begins can prevent corrections, repeat inspections and unfinished permit records.