Los Angeles Building Permits 2026: LADBS, Fees, Inspections & Services

Los Angeles Building Permits: What to Do First in 2026

If you need a building permit inside the City of Los Angeles, the main agency is the Los Angeles Department of Building and Safety, commonly called LADBS. It handles building permits, plan checks, construction inspections, electrical, plumbing and HVAC permits, grading, code enforcement and building records.

Quick answer: Use PermitLA when your work qualifies for an Express Permit that does not need plan review. Use ePlanLA when drawings must be reviewed. After the permit is issued, request LADBS inspections before covered work is concealed. If you only need to research an existing property or old permit, start with PRISM or the Permit and Inspection Report instead of filing a new application.

A Los Angeles permit project can feel confusing because zoning, plan review, permits, clearances and inspections may involve different systems. The easiest way through it is to identify your jurisdiction first, then choose the correct permit path before spending money on drawings or submitting an application.

First Check: City of Los Angeles or Los Angeles County?

This is the step that can save the most wasted time. A postal address containing “Los Angeles” does not automatically mean LADBS controls the property.

Property location Likely permit authority What to do
Inside City of Los Angeles limits Los Angeles Department of Building and Safety Use LADBS, PermitLA or ePlanLA.
Unincorporated Los Angeles County Los Angeles County Public Works – Building and Safety Use the County permit system rather than LADBS.
Independent city such as Beverly Hills That city’s own building department Apply with the municipality where the property is located.

Micro-step: Open the official ZIMAS property system, enter the property address and review the parcel and zoning information. If the property does not appear as a City of Los Angeles parcel, verify the responsible jurisdiction before starting an LADBS application.

For broader LADBS contact and department information, see our Los Angeles Building Department guide. For comparison, an unincorporated community such as Altadena generally follows the process explained in our Altadena Building Department guide, while Beverly Hills has its own municipal process covered in our Beverly Hills Building Department guide.

Which Los Angeles Permit Website Should You Use?

The most common mistake is opening the right department but the wrong system. Use this table before creating an application.

Your task Official tool Best use
Simple qualifying permit PermitLA Express permits with no plan check required.
Submit construction drawings ePlanLA Electronic plan review, corrections and permit processing.
Schedule an inspection LADBS Inspection Request Request an inspection after the applicable permit has been issued.
Check permit or inspection information Permit and Inspection Report Search by address, permit/application number or plan-check number.
Search historical records LADBS PRISM Permits, scanned records, certificates and other property documents.
Check zoning ZIMAS Parcel, zoning and land-use research before design or filing.
Book in-person service BuildLA Appointments and development-service connections.
Find forms and current bulletins LADBS Forms & Publications Applications, correction sheets, 2026 bulletins and technical documents.
Angeleno account: LADBS online permitting systems use the City’s Angeleno account. If you have not used the systems before, create or sign in to your account before beginning the permit application so you are not interrupted midway through the filing process.

What Permits Does LADBS Handle?

LADBS permit and review work includes much more than a standard building permit. Depending on the scope, your project may involve one or several disciplines.

  • New buildings and structures
  • Room additions and structural alterations
  • Interior modifications and floor-plan changes
  • Change of use or occupancy
  • Demolition or building removal
  • Electrical work
  • Plumbing work
  • Mechanical and HVAC systems
  • Fire sprinkler systems
  • Grading
  • Elevators and pressure vessels
  • Signs and sign structures
  • Retaining walls, shoring and certain fences
  • Disabled-access review
  • Green-building requirements
Do not assume “small job” means “no permit.” Permit requirements depend on the exact work, valuation, location, structure, safety impact and trade involved.

A useful 2026 building-permit exemption

The current Los Angeles Building Code includes an exemption for work regulated by that code valued at $2,500 or less, provided the work does not affect structural stability or public safety, is not being done to comply with a Department order, and does not involve a change of use or occupancy.

That does not mean every project below $2,500 is automatically permit-free. Electrical, plumbing, mechanical, zoning or another permit requirement may still apply. When the scope is unclear, confirm the exact work with LADBS before starting construction.

Express Permit or Plan Check?

This decision determines which online system you use.

Express Permit

An Express Permit is for qualifying work that does not require plan review. LADBS’s 2026 Express Permit bulletin includes examples such as certain same-size residential window and door replacements, non-structural kitchen or bathroom remodels, re-stucco work, qualifying re-roofs, selected drywall repairs, water-heater replacements, plumbing fixtures, qualifying HVAC work and selected electrical installations.

The exact conditions matter. For example, a kitchen remodel with structural changes is not the same as a non-structural kitchen remodel.

Micro-step:

  1. Review the official 2026 LADBS Express Permit bulletin.
  2. Find the category matching your work.
  3. Read all conditions attached to that category.
  4. If it qualifies, open PermitLA.
  5. Sign in and complete the permit application.
  6. Pay the calculated fees and obtain the issued permit before beginning regulated work.

Counter, Expanded Counter and Regular Plan Check

LADBS uses different plan-check paths depending on project size and complexity.

Review type Typical use Published LADBS guidance
Counter Plan Check (CPC) Minor projects that qualify for over-the-counter review LADBS describes qualifying projects as generally reviewable in about 45 minutes or less and potentially completed the same day when compliant.
Expanded Counter Plan Check (ECPC) Projects more involved than CPC but less complex than Regular Plan Check Published guidance says corrections are typically provided about 5–7 business days after submittal for qualifying projects.
Regular Plan Check (RPC) Large, complex or otherwise non-qualifying projects Review can take weeks depending on project complexity and Department workload.

Examples in the 2026 qualification bulletin include small one-story residential additions and certain minor alterations for CPC, while qualifying ADU conversions, some new one-story detached ADUs and larger accessory projects may fall into ECPC. A plan-check engineer makes the final determination.

You can review the official 2026 LADBS plan-check qualification bulletin before submitting.

How to Apply for a Los Angeles Building Permit

  1. Confirm the jurisdiction.
    Search the property in ZIMAS. Do not prepare a City of Los Angeles permit application until you are reasonably sure LADBS is the correct authority.
  2. Write down the exact scope of work.
    Be specific: roof replacement, bathroom remodel, wall removal, ADU, electrical service upgrade, addition, new structure, demolition or change of use.
  3. Check zoning before design gets expensive.
    Review zoning, lot information, setbacks and property conditions in ZIMAS. A code-compliant building design can still be delayed if zoning requirements are missed.
  4. Decide whether the project is Express or needs plan check.
    Compare the work with the LADBS Express Permit list. If plans must be reviewed, prepare for ePlanLA instead of PermitLA.
  5. Create or sign in to your Angeleno account.
    Use the same City account when accessing the applicable Los Angeles online construction services.
  6. Prepare the project documents.
    Gather the property information, scope, owner/applicant information, drawings, calculations and project-specific supporting documents that apply.
  7. Submit through the correct portal.
    Use PermitLA for qualifying no-plan-check work. Use ePlanLA for projects requiring electronic plan review.
  8. Respond to corrections and required clearances.
    A plan checker may request revisions. Some projects also need sign-off from Planning, Fire, Public Works, Sanitation, LADWP or another agency.
  9. Pay fees and obtain permit issuance.
    An application or approved plan check is not the same as an issued construction permit. Confirm that the permit has actually been issued before beginning regulated work.
  10. Build in inspection stages.
    Request required inspections before work is concealed. After all applicable stages are approved, request the final inspection and any required Certificate of Occupancy.

What Should You Prepare Before Applying?

The exact submittal package depends on the project, but having the following information ready can prevent simple delays:

  • Property address and parcel information
  • Clear description of the proposed work
  • Existing and proposed building use
  • Owner information
  • Applicant, contractor or authorized-agent information
  • Estimated construction valuation
  • Plot or site plan when required
  • Existing and proposed floor plans
  • Elevations and sections when applicable
  • Structural plans and calculations when required
  • Electrical, plumbing or mechanical information where applicable
  • Energy and green-building documents when applicable
  • Geotechnical or grading documents for projects that require them
  • Required agency clearances
For a small residential addition: LADBS’s 2026 guidance for qualifying one-story additions identifies items such as a dimensioned plot plan, floor plan and framing information. Do not upload a set of drawings with only the proposed room shown and no relationship to the existing property.

For statewide code context, see our California Building Code 2026 guide. Los Angeles also applies local amendments and project-specific requirements, so the statewide code alone is not enough for a City of Los Angeles permit.

Los Angeles Building Permit Fees and Timing

There is no single flat Los Angeles building-permit price. Building permit costs can depend on construction valuation, permit type, plan review, trade work, grading, inspections, surcharges and other services associated with the project.

Micro-step to estimate fees:

  1. Open the official LADBS Fee Schedules page.
  2. Use the Permit Fee Calculator linked by LADBS.
  3. Enter the project information requested by the calculator.
  4. Review separate trade or grading fee schedules if they apply.
  5. Treat the result as an estimate until LADBS calculates the actual application charges.

How long are permits and plan checks valid?

Item Current rule to know
Plan check A plan check generally expires if a permit is not secured within 18 months after plans are filed for checking, subject to approved extensions.
Building permit The current Los Angeles Municipal Code generally makes a permit valid for two years.
Work not started The permit can expire if the authorized work is not commenced within 12 months after issuance.
Work stopped A permit can expire when authorized work has been suspended, discontinued or abandoned for a continuous 12-month period.

Extensions can depend on the permit and circumstances, so do not wait until the last week to address an approaching expiration.

2026 code detail: Los Angeles also provides a combined building-mechanical permit path for certain qualifying one- and two-family dwelling and ADU work. Separate trade permits can still be necessary in specific circumstances, so let the permit system and plan-check staff determine the correct combination for your project.

How Los Angeles Building Inspections Work

Getting a permit is not the end of the process. LADBS requires permitted work to be inspected at the appropriate construction stages.

Common inspection points can include:

  • Excavation and foundations
  • Concrete work
  • Framing
  • Shear-wall or roof nailing
  • Electrical rough work
  • Plumbing rough work
  • Mechanical and HVAC work
  • Fire sprinkler work
  • Grading
  • Green-building items
  • Final inspection
Do not cover work before its required inspection. LADBS states that construction is not approved until it has been inspected and accepted. If framing, wiring, piping or another required item is hidden too soon, you may have to uncover it.

Request an inspection step by step

  1. Confirm the applicable permit is issued and active.
  2. Complete only the work needed for the inspection stage.
  3. Leave all inspected work visible and safely accessible.
  4. Open the official inspection request service.
  5. Enter the permit and project information.
  6. Select or request the applicable inspection.
  7. Keep the confirmation information.
  8. Have the permit, approved plans and Building Card available at the job site when applicable.

LADBS currently states that a next-day inspection can be requested when the request is made before 2:00 p.m., subject to availability.

You can also request inspection assistance by calling 3-1-1 within Los Angeles or (213) 473-3231 from outside the Los Angeles area.

What should be at the job site?

  • Copy of the applicable permit
  • Approved plans when plan review was required
  • Building Card for applicable building permits
  • Safe access to the work
  • Equipment required for the inspector to access the work, such as a ladder when appropriate

How to Check a Los Angeles Permit, Inspection or Old Record

For an active permit or inspection

Use the official Permit and Inspection Report. The system can search using information such as a street address, 15-digit permit/application number, plan-check/job number or code-enforcement request number.

Micro-step:

  1. Open the Permit and Inspection Report.
  2. Choose the search information you have.
  3. Enter the property address or project number carefully.
  4. Open the matching project.
  5. Review permit status, inspection information and related project records.

For permit history and scanned property records

Use LADBS PRISM. It is designed for searches involving construction, permitting, inspections, certificates and code-enforcement records.

Micro-step: search by address in PRISM

  1. Open PRISM.
  2. Select the address search.
  3. Enter the street number and street name.
  4. Use filters or a date range if the result list is large.
  5. Open the relevant record.
  6. Review available documents, permit history or record timeline.
Buying or remodeling an older property? Search records before assuming an existing room, addition, converted garage or second unit was legally permitted. The physical existence of construction does not by itself prove permit approval.

LADBS Development Services Centers

Most permitting can begin online, but LADBS also maintains in-person Development Services Centers. Services and hours differ by location.

Office Address Current published counter hours Useful note
Metro / Downtown 201 & 221 N. Figueroa St., Los Angeles, CA 90012 Mon, Tue, Thu, Fri: 7:30 a.m.–4:30 p.m.
Wed: 9:00 a.m.–4:30 p.m.
Broadest range of LADBS services. Qmatic tickets are not issued after 4 p.m.
Van Nuys 6262 Van Nuys Blvd., 2nd Floor, Room 251, Van Nuys, CA 91401 Mon, Tue, Thu, Fri: 7:30 a.m.–4:30 p.m.
Wed: 9:00 a.m.–4:30 p.m.
Permits, records, plan check and inspection. Qmatic tickets stop after 4 p.m.
West LA 1828 Sawtelle Blvd., 2nd Floor, West Los Angeles, CA 90025 Mon–Fri: 9:00 a.m.–5:00 p.m. Mechanical or electrical plan-check services are currently listed for Tuesdays and Thursdays.
South LA 8475 S. Vermont Ave., Los Angeles, CA 90044 Tue & Thu: 7:30 a.m.–12 p.m. and 1–4:30 p.m. Express Permit, Counter Plan Check, plan submittal and code enforcement.
San Pedro 638 S. Beacon St., San Pedro, CA 90731 Tue & Thu: 7:30 a.m.–12 p.m. and 1–4 p.m. Permits, plan submittal, inspection and code enforcement.

Before driving across Los Angeles, check the current LADBS locations page. Online PermitLA and ePlanLA work does not require an in-person counter appointment, while in-person services may require scheduling through BuildLA.

Local Tips That Can Prevent a Los Angeles Permit Delay

Check property conditions before drawing the project

Los Angeles parcels can be affected by hillside rules, methane zones, fire-hazard requirements, historic resources, grading conditions, airport-related restrictions and other location-specific rules. A drawing that works on one Los Angeles lot may not work on another.

Do not treat Planning clearance and building plan check as the same thing

A project can satisfy structural building-code requirements and still need City Planning approval for use, setbacks, parking, density or another land-use condition.

Expect another agency when the project touches public infrastructure

Depending on the scope, clearances may involve City Planning, the Los Angeles Fire Department, Bureau of Engineering, Bureau of Sanitation, LADWP, Los Angeles Housing Department, Transportation, Cultural Affairs or County Health.

Read the correction list before resubmitting

Do not simply upload a new drawing set after fixing one obvious comment. Work through every plan-check correction and make sure the revised drawings, calculations and written responses agree with each other.

Keep the scope consistent everywhere

The permit application, architectural plans, structural plans and contractor description should describe the same project. Small inconsistencies can create avoidable questions during review or inspection.

Wildfire repair and rebuilding

The West LA location at 1828 Sawtelle Boulevard also operates as an L.A. One-Stop Rebuilding Center. LADBS recommends electronic plan submission through ePlanLA for repair and rebuilding projects, while in-person assistance is also available.

A Simple Los Angeles Permit Checklist

  • Confirm the property is actually within City of Los Angeles jurisdiction.
  • Check zoning and parcel conditions before finalizing plans.
  • Write a precise scope of work.
  • Check whether the project qualifies for an Express Permit.
  • Create your Angeleno account.
  • Use PermitLA or ePlanLA—not both for the same purpose.
  • Prepare drawings and calculations appropriate to the project.
  • Resolve plan-check comments completely.
  • Complete required outside-agency clearances.
  • Pay fees and confirm the permit is issued.
  • Keep approved documents available during construction.
  • Request inspections before work is covered.
  • Complete final inspection and retain the final project records.

Los Angeles Building Permits FAQs

1. What department issues building permits in the City of Los Angeles?

The Los Angeles Department of Building and Safety, commonly called LADBS, handles building permits, plan review and construction inspections for properties within City of Los Angeles jurisdiction.

2. What is the difference between PermitLA and ePlanLA?

PermitLA is primarily used for qualifying permits that do not require plan review. ePlanLA is the electronic system used to submit plans and supporting documents when a project requires plan check.

3. Can I get a Los Angeles building permit online?

Yes. LADBS provides online permitting for projects both with and without plan review. Use PermitLA for qualifying Express Permits and ePlanLA for projects requiring electronic plan review.

4. What work can qualify for an Express Permit?

Examples in the 2026 LADBS Express Permit bulletin include certain non-structural residential remodels, same-size window or door replacements, qualifying re-roofs, selected plumbing work, water-heater replacement, HVAC work and qualifying electrical installations. Each category has conditions that must be checked before applying.

5. How much does a Los Angeles building permit cost?

There is no single flat price. Fees vary with construction valuation, permit type, plan review, trade work, grading and other project requirements. Use the official LADBS Permit Fee Calculator and fee schedules for an estimate.

6. How long is a Los Angeles building permit valid?

The current Los Angeles Municipal Code generally makes a permit valid for two years, but it can expire if work is not commenced within 12 months or if permitted work is suspended, discontinued or abandoned for a continuous 12-month period. Project-specific extensions should be discussed with LADBS before expiration.

7. How long is a Los Angeles plan check valid?

A plan check generally expires if the permit is not secured within 18 months after the plans are filed for checking, although LADBS may grant an extension when qualifying circumstances are documented.

8. How do I schedule an LADBS inspection?

Use the LADBS online inspection-request service after the permit is issued. LADBS currently states that requests submitted before 2:00 p.m. may be scheduled for the next day, subject to availability. You may also call 3-1-1 locally or (213) 473-3231 from outside Los Angeles.

9. How can I find old building permits for a Los Angeles property?

Start with LADBS PRISM. Search using the property address, assessor information, legal description or document number. For active permit and inspection information, use the separate Permit and Inspection Report system.

10. Is the Los Angeles City building department the same as Los Angeles County Building and Safety?

No. LADBS serves the City of Los Angeles. Unincorporated Los Angeles County areas generally use Los Angeles County Public Works Building and Safety, while incorporated cities such as Beverly Hills may operate their own permitting departments.

Before You Submit

The fastest permit route is not always the portal with the shortest form. It is the route that matches the property, project and required review from the beginning. Confirm jurisdiction, check zoning, identify whether plan review is required, prepare a complete submittal and keep the work open for required inspections.

Use LADBS or another responsible government agency for the final property-specific determination, permit issuance, payment and inspection approval. Requirements, fees, office schedules and online systems can change, so verify the live official service before completing the final transaction.

USBuilding.org is an independent informational resource and is not the Los Angeles Department of Building and Safety or another government agency.