Los Gatos Building Permits, Inspections & Permit Help
If you are remodeling a house, replacing a roof or windows, adding a room, installing HVAC, upgrading an electrical panel, building an ADU, working on a commercial space, or trying to close an old permit, this guide shows you where to start and what to prepare before you reach the official portal.
Information reviewed for the 2026 permit process. Los Gatos fee schedules, code requirements and project-specific approvals can change, so use the linked Town services when you are ready to submit, pay or request an official determination.
Los Gatos Building Division Contact Information
Community Development Department
110 E. Main Street
Los Gatos, CA 95030
Monday-Friday
8:00 a.m.-1:00 p.m.
Monday-Friday
7:30 a.m.-4:00 p.m.
The Town also lists inspector phone hours from 7:30 a.m. to 8:00 a.m. Monday-Friday. Appointments with the Building Official are available during afternoon hours and can be arranged through the Building Division.
Do You Need a Los Gatos Building Permit?
Los Gatos states that a building permit is generally required when construction involves erection, installation, extension, repair or material alteration of a building. Electrical, plumbing and mechanical work can also require separate or combined permits.
| Project | Typical Los Gatos route | Important detail |
|---|---|---|
| Water heater replacement | Direct online residential permit may be available | Town’s streamlined route applies to same-type, same-location replacement. Relocation or tankless work may require drawings. |
| Furnace / HVAC replacement | Direct online permit for qualifying same-location work | Check the 2026 Los Gatos reach-code requirements before selecting replacement equipment. |
| Electrical service panel | Direct online permit for qualifying residential panels | The Town specifically lists residential service panels of 200 amps or less among online permit types. |
| Copper re-pipe | Direct online residential permit | Available through the Town permit system for parcels in Town jurisdiction. |
| Water-line repair or replacement | Direct online permit may be available | Confirm whether another utility or sanitation approval also applies. |
| Window replacement | Building permit required | Historic, pre-1941 or HOA properties can require additional approval. |
| Reroof | Building permit required for applicable roof work | Town FAQ states repairs or replacement of 100 sq. ft. or more require a permit. |
| Addition, new house or structural remodel | Building pre-application and plan review | Plans and supporting documents are submitted digitally. |
| Residential solar | SolarAPP+ for qualifying projects | Los Gatos directs eligible residential rooftop solar applicants to SolarAPP+. |
| Grading or work affecting public right-of-way | Public Works / Engineering may be involved | Do not assume the Building Division is the only approval required. |
If you are unsure, open the Los Gatos permit portal and choose the Permit Decision Tool. It is safer than guessing based only on the project name.
How to Apply for a Los Gatos Building Permit
The Town has moved building applications and plan review to a digital system. The practical process is:
- Confirm the property is in Town jurisdiction. Check the address and parcel before paying a designer or preparing a large submittal.
- Identify the permit type. Open the official permit portal. Use the Permit Decision Tool if you are not certain which permit applies.
- Create an Accela/Citizen Portal account. Register using your email address and confirm the registration email. Licensed professionals can add license information. Contractors obtaining permits must have a current Town of Los Gatos business license.
- Check whether your project can be permitted directly online. Qualifying residential work such as certain panel replacements, copper re-pipes, water heaters, water lines and same-location HVAC replacements can use the streamlined online route.
- For other projects, begin a Building Pre-Application. Use the Building Pre-Application service. Upload the application, plans and project documents.
- Complete intake. Building staff reviews the package to determine whether the required material is present. Missing items can stop the application from advancing.
- Pay required fees. When the application reaches the appropriate stage, the Town will notify you about applicable fees.
- Respond to plan-review comments. If corrections are issued, revise the plans and upload the resubmittal through the portal rather than sending paper plans.
- Wait for permit issuance before starting regulated work. An application being submitted or reviewed is not the same as having an issued building permit.
- Request inspections as construction reaches each required stage. Do not conceal work that still needs inspection.
What to Prepare Before You Submit
The exact package depends on the project, but the Town’s building application and residential submittal documents show the information applicants commonly need.
- Project street address and assessor’s parcel number (APN)
- Property owner name and contact information
- Applicant and contractor information
- Contractor license details and Town business license number when applicable
- Clear description of the proposed work
- Construction valuation
- Existing and proposed square footage
- Existing and proposed use for commercial projects
- Site or plot plan
- Dimensioned floor plans
- Exterior elevations where required
- Structural plans and calculations when applicable
- Title 24 energy documentation
- Mechanical, electrical and plumbing information
- Existing and proposed utility locations where required
- Planning conditions of approval for projects that already received Planning approval
- Fire-hazard, historic-property and other project-specific information
Use the Town’s Plan Check Submittal Requirements page to find project-specific checklists for new homes, additions and remodels, pools, decks, stairs, guardrails, generators, EV chargers, retaining walls and commercial construction.
Los Gatos Building Permit Fees in 2026
There is no single flat Los Gatos building permit price. Larger building permits are generally calculated from project valuation, while trade permits can include unit-based charges. Plan review, issuance, surcharges and other services can add to the total.
The Town’s FY 2026-2027 Comprehensive Fee Schedule lists the following examples:
| Fee item | FY 2026-2027 amount |
|---|---|
| Building permit issuance / reinstatement | $68 |
| Additional building permit fee | $38 |
| Residential demolition permit | $333 |
| Commercial demolition permit | $583 |
| Plan review fee | 65% of the applicable building permit fee under the valuation schedule |
| Re-inspection | $199 per hour |
| Permit / plan-check time extension | $98 per permit |
| Temporary Certificate of Occupancy | $1,373 |
The current building permit application also lists examples of trade-unit charges, including a $98 fee for service equipment of 200 amps or less, $40 for a water heater/water softener unit item, and $48 for installation, repair or alteration of certain heating or A/C equipment. These are not necessarily the total permit cost because issuance fees, plan-check charges, surcharges and other applicable fees may be added.
Best way to avoid budgeting from an outdated number: open the official Los Gatos permit fee schedule and confirm the current fiscal-year amount before payment. Town fee schedules are updated periodically.
How to Schedule a Los Gatos Building Inspection
For a next-business-day inspection, Los Gatos requires the request to be submitted by 12:00 noon. Requests received after noon move to the following business day.
Online is the easiest option because it gives you a confirmation:
- Open the official Schedule Inspection page.
- Sign in as a registered user.
- Search by permit number or property address.
- If using a permit number, enter it in the Town’s format, such as B23-1111.
- Open the correct permit record.
- Select Record Info, then Inspections.
- Choose Schedule or Request an Inspection.
- Select the required inspection and requested date.
The permit must be in an issued status before the online system will allow a building inspection to be scheduled.
Phone option: call the 24-hour Building Inspection Request Line at 408-354-6877. Leave:
- the type of inspection needed;
- requested inspection date and morning/afternoon preference;
- permit number;
- street address, not merely a lot number; and
- on-site contact name and phone number.
If required information is missing from the voicemail, the inspection may not be scheduled. The Town advises applicants not to contact an individual field inspector directly to arrange the inspection.
Published Building Division inspection hours are generally Monday-Friday, 8:00 a.m.-3:00 p.m., excluding Town holidays.
Search Los Gatos Building Permits and Property History
You do not need to create a permit-portal account just to search available building records.
- Open Building Search Records.
- Search using the property address or other available record information.
- Open the relevant permit to review available application and permit details.
The Town states that the public can view pending and issued building permits from 1994 forward through the online system. Building permit history from before 1994 may be available through Laserfiche and/or microfiche at the Building Division counter during counter hours.
The Town also publishes monthly issued-building-permit reports. These reports can include permit number, issue date, address, APN, project description, contractor, property owner, valuation and fees paid.
Building Codes Used in Los Gatos in 2026
Los Gatos entered the new California building-code cycle on January 1, 2026. The Town’s current-code information references the 2025 California Building Standards Code together with local amendments adopted through Town Ordinance 2380.
The applicable code family can include California building, residential, electrical, mechanical, plumbing, energy, fire, existing-building, green-building and other Title 24 requirements, depending on the project.
For a broader explanation of the statewide code cycle, see our California Building Code 2026 guide.
Los Gatos Reach Codes: Important for HVAC and Remodels
Los Gatos’ 2026 local amendments include reach-code requirements that can affect decisions homeowners make before purchasing equipment.
- For existing single-family homes, replacement of an air-conditioning unit can trigger a heat-pump replacement requirement under the Town’s current reach-code program.
- Existing single-family additions or remodels where gas or propane equipment is installed can have electric-readiness / pre-wiring requirements.
If you are replacing an air conditioner, furnace or other major mechanical equipment, check the current Los Gatos code and reach-code information before buying equipment. A contractor quoting a like-for-like replacement without checking the current Town rule may be working from an outdated assumption.
Wildfire and WUI Requirements
Some Los Gatos properties are in areas where wildfire-related construction requirements matter. The 2026 code cycle also brings updated Wildland-Urban Interface requirements. If your parcel is in or near a mapped fire-hazard area, check the Town’s current WUI/fire-hazard information before selecting roofing, vents, windows, siding or other exterior materials.
Los Gatos-Specific Tips That Can Save Time
Check historic status before ordering windows or roofing. The Town’s permit materials specifically ask whether a property is in a historic district or is pre-1941. Window replacement and reroof work associated with a historic property or certain HOA-controlled properties can require Planning or HOA approval.
Contractors should verify the Town business license early. Los Gatos requires contractors using the permit system to have a current Town business license. The Town’s Business License page explains the current application and renewal process.
Do not send plan-check packages by courier. The Building Division states that plan-check submittals and resubmittals are digital. FedEx, UPS and similar mail/courier plan submissions are not the normal accepted route.
Separate Building from Engineering work. A project involving grading, public right-of-way work or related civil improvements may require Public Works Engineering review in addition to a building permit. Engineering is based at 41 Miles Avenue and can be reached at 408-399-5771.
Water and sewer work may involve another agency. Los Gatos permit information notes that some water or sewer-line work may also require coordination with the West Valley Sanitation District.
Residential solar has its own shortcut. For qualifying residential rooftop photovoltaic projects, Los Gatos directs applicants to SolarAPP+ for automated code-compliance review.
Nearby process comparison: if you are working elsewhere in the West Valley area, don’t assume the same application system applies. For example, our Cupertino Building Department guide covers that city’s separate permitting process.
Los Gatos Construction Work Hours
The Building Division currently publishes the following construction work hours:
| Day | Published construction hours |
|---|---|
| Monday-Friday | 8:00 a.m.-6:00 p.m. |
| Saturday | 9:00 a.m.-4:00 p.m. |
| Sunday | No construction |
| Town-observed holidays | No construction |
Before You Start Work: Practical Checklist
- Confirm the property is inside Los Gatos Town jurisdiction.
- Check zoning, historic status and fire-hazard conditions.
- Use the Permit Decision Tool if the permit type is unclear.
- Check whether the project qualifies for a direct online permit.
- Create the Citizen Portal account.
- Verify contractor licensing and Town business-license status.
- Download the current application and project-specific checklist.
- Use the 2026 adopted-code information rather than relying only on older checklist text.
- Prepare a bookmarked plan-set PDF and separate supporting PDFs.
- Do not begin regulated work before permit issuance.
- Schedule required inspections before covering work.
- Request next-business-day inspections before noon.
- Keep the final inspection and permit records with the property documents.
Frequently Asked Questions
1. What is the Los Gatos Building Department officially called?
Building services are handled by the Town of Los Gatos Community Development Department’s Building Division. It reviews construction plans, facilitates permit issuance and conducts building inspections.
2. Can I apply for a Los Gatos building permit online?
Yes. Los Gatos uses a digital Citizen Portal for building applications and plan review. Applicants register for an account, submit the required material electronically and manage records through the portal.
3. Which residential permits can be obtained directly online?
The Town lists streamlined online options for qualifying residential work including copper re-pipes, same-location HVAC replacement, electrical service panels of 200 amps or less, same-type/same-location water-heater replacement and water-line repair or replacement. Other projects may require a Building Pre-Application.
4. How do I schedule a Los Gatos building inspection?
Log into the official permit portal, locate the issued permit, open Record Info > Inspections, and choose the scheduling option. You can also call the inspection request line at 408-354-6877 and leave the required permit, address, inspection and contact information.
5. What is the inspection request deadline?
Requests must be received by 12:00 noon for a next-business-day inspection. Requests made after noon are pushed to the following business day.
6. How much does a Los Gatos building permit cost?
The cost depends on the project. The FY 2026-2027 schedule lists a $68 building-permit issuance/reinstatement fee, but valuation charges, plan review, trade fees, surcharges and other project-specific charges can make the total higher.
7. What building codes apply in Los Gatos in 2026?
The Town moved to the 2025 California Building Standards Code cycle effective January 1, 2026, together with Los Gatos local amendments and applicable reach-code and wildfire-related requirements.
8. Do I need a permit to replace windows or a roof?
Los Gatos states that window replacement requires a permit. The Town also states that roof repair or replacement involving 100 square feet or more requires a reroof permit. Historic, pre-1941 and certain HOA properties can need additional approvals.
9. Can I search old Los Gatos building permits online?
Yes. The Town provides online access to pending and issued building permits from 1994 forward. Older records may be available through Laserfiche or microfiche at the Building Division counter.
10. Does a small storage shed need a Los Gatos building permit?
The Town’s current FAQ states that a one-story detached accessory structure used as a tool/storage shed, playhouse or similar structure may be building-permit exempt when it is 120 square feet or less and no more than 15 feet high. Planning/zoning rules still apply, and electrical or plumbing work in the structure requires permits.
Official Los Gatos Resources
- Town of Los Gatos Building Division
- Los Gatos Permit Portal
- Building Permit Applications
- Plan Check Submittal Requirements
- Building Forms and Information
- Current Permit Fee Schedule
- Current Adopted Building Codes
- Search Building Records
- Schedule a Building Inspection