Madison County Building Permits, Inspections & Official Services
If you landed here because you need a permit, inspection, zoning answer, fee schedule, application form or old building record, the most important first step is confirming who has jurisdiction over the property. A postal address that says Edwardsville, Alton, Granite City or another Madison County community does not automatically mean the county issues the permit.
The county states that its Building & Zoning Department administers building codes for construction in unincorporated areas of Madison County. If the property is inside an incorporated city or village, that municipality may have its own building department and permit rules.
Madison County Building & Zoning Contact Information
| Need | Current county information |
|---|---|
| Department | Madison County Building & Zoning |
| Office | Madison County Administration Building, 157 N. Main Street, Suite 254, Edwardsville, IL 62025-1964 |
| Main phone | (618) 296-4468 |
| General email | zoning@madisoncountyil.gov |
| Business hours | Monday-Friday, 8:30 a.m.-4:30 p.m. |
| Lead Building Inspector | Jeff Walker — (618) 296-4668 — jmwalker@madisoncountyil.gov |
| Building Inspector | Dylan Stock — (618) 296-4664 |
| Zoning Coordinator | Jen Hurley — (618) 296-4662 |
| Stormwater Coordinator | Marc Hohlt — (618) 296-4665 |
| Public parking | The county says public parking is behind the Administration Building on North Second Street. |
First Check: Does Madison County Issue Your Permit?
This is the step that prevents the most wasted time. Madison County Building & Zoning specifically says it administers its building code for construction in the unincorporated areas of Madison County.
| Property situation | Where to start |
|---|---|
| Unincorporated Madison County | Start with Madison County Building & Zoning. |
| Inside an incorporated city or village | Check that municipality’s building or development department first. |
| You only know the mailing address | Do not assume jurisdiction from the postal city. Check the county GIS or call Building & Zoning. |
| Property near a municipal boundary | Confirm jurisdiction before paying for plans or submitting a permit application. |
Micro-step: verify the property before applying
- Start with the exact street address and, if available, the parcel identification number.
- Open the county’s GIS Viewer and locate the parcel.
- Check whether the site appears inside or outside municipal limits.
- If the boundary is unclear, call (618) 296-4468 and ask Building & Zoning to confirm the permitting authority.
- Only after jurisdiction is confirmed should you choose and submit the permit application.
If you are new to county permitting, our County Building Department guide explains why the county and a city can have different permit authority even when both appear in the same mailing address.
What Madison County Building & Zoning Handles
The department covers considerably more than issuing a piece of paper for construction. Its current county pages include building permits and inspections, zoning administration, subdivision platting, site development, stormwater and floodplain work, code enforcement, private sewage, manufactured-home matters and related land-development services.
| Service | What it can involve |
|---|---|
| Building permits | Application review, construction plans and permit issuance before regulated work starts. |
| Building inspections | Inspection of construction at required milestones after a permit is issued. |
| Zoning | Land use, setbacks, accessory structures and other zoning requirements. |
| Site development | Grading, fill, erosion and sediment control and related development review when applicable. |
| Subdivision review | Preliminary, final, minor and improvement-related subdivision applications. |
| Private sewage | County review, approval, inspection and code enforcement for private sewage systems. |
| Stormwater / floodplain | Flooding, drainage, stormwater management and floodplain requirements. |
| Code enforcement | Zoning, property maintenance and other regulated property issues. |
Do You Need a Madison County Building Permit?
For regulated construction in the county’s jurisdiction, do not begin simply because a contractor is ready. Madison County’s official permit page says a contractor must apply for a building permit and submit proposed plans before construction begins. Work starts after the plans are reviewed and the permit is issued.
The exact permit depends on the work. New houses, commercial construction, additions, significant alterations, accessory structures and projects involving electrical, plumbing, site development or private sewage can trigger different reviews or supporting forms.
How to Apply for a Madison County IL Building Permit
The county’s current permit packages make one point especially clear: review does not begin until the application and required documentation are complete. The current commercial application also states that applications may be submitted by email or in person and that permits are processed in the order received.
-
Confirm county jurisdiction.
Make sure the project is in unincorporated Madison County or otherwise under county authority. -
Open the current county forms page.
Go to Forms & Applications. Use the form currently posted by the county rather than an old PDF found through a search engine. -
Identify every approval connected to the project.
A building project can also involve zoning, site development, erosion control, a private entrance, septic/private sewage, floodplain review or another approval. -
Complete every field on the application.
Current county permit forms request information such as the parcel number, 911 address, project type, construction cost, property owner, contractors, utilities, flood-zone information and sewer or private-sewage details. -
Prepare the plans and attachments.
Do not send only the application page. The review process begins after the required supporting material is received. -
Submit using the instructions on the current permit package.
Current county building applications identify zoning@madisoncountyil.gov for completed applications. The commercial package expressly allows email or in-person submission. Follow the instructions on your specific form. -
Wait for the county’s fee request and plan review.
The current application package says county staff will call to collect fees after a complete application has been received. -
Respond completely if corrections are requested.
Missing drawings, unclear dimensions or an unresolved zoning/septic issue can hold the review. -
Do not start permit-required work until the permit is issued.
Submitting an application is not permission to build.
What Documents Should You Prepare?
Requirements change by project, but Madison County’s current application packages show what the county expects applicants to have ready.
Common project information
- Completed and signed application.
- Construction cost or project valuation.
- Township and parcel number.
- 911 address or exact location where work will occur.
- Owner and general-contractor contact information.
- Applicable licensed plumber, roofer or private-sewage installer information.
- Water supply and utility information.
- Sanitary sewer or private-sewage details.
- Flood-zone information where applicable.
Plans commonly requested
- Plot plan: current county checklists call for streets or roads, orientation, distances from property lines and distances between buildings.
- Floor plan: room layout, dimensions and relevant project details.
- Specification sheet: construction information requested by the application package.
- 911 address form: included in current building permit packages where applicable.
- Truss designs: required when pre-manufactured trusses are used.
- Commercial engineered plans: the current commercial checklist calls for commercially engineered stamped plans.
- Other approvals: projects may require a private-entrance approval, erosion-control material or private-sewage documentation.
Madison County Building Permit Fees in 2026
Madison County does not have one universal building-permit price. The amount can depend on the project type, size, construction cost and additional plumbing, electrical, sewage or other work.
The county’s current Forms & Applications page includes a document labeled Permit Fee Schedule. However, the PDF currently linked through that page uses an older file path/date. For a 2026 project, it is safer to confirm the calculated amount with Building & Zoning instead of relying on an old fee figure copied by a third-party website.
Micro-step: check the fee without guessing
- Open the official Forms & Applications page.
- Expand the Forms and Applications document list.
- Select Permit Fee Schedule.
- Find the category that matches your project.
- If the work includes multiple trades or the calculation is unclear, call (618) 296-4468.
- Use the amount confirmed by the county when you are contacted for payment.
The county’s current building application instructions state that after a complete application is received, staff will contact the applicant to collect the applicable fees before the review proceeds.
How Madison County Building Inspections Work
After an issued permit allows construction to begin, a county building inspector checks work at selected milestones. The county’s current application package says inspection requests are scheduled in the order received.
How to request an inspection
- Check the permit, approved plans and any inspection instructions you received.
- Identify the exact construction stage that is ready for inspection.
- Have the permit number, project address, inspection type and callback number ready.
- Contact Lead Building Inspector Jeff Walker at (618) 296-4668, or call the main Building & Zoning office at (618) 296-4468 if you are unsure whom to contact.
- Keep the work visible and safely accessible for the inspector.
- If corrections are identified, complete them before requesting the applicable follow-up inspection.
- Do not assume the permit is closed until all required final approvals are complete.
Building Codes Madison County Lists for 2026 Projects
The current Madison County Building & Zoning page lists substantially newer codes than some older county handouts still circulating online. For a current project, use the county’s live code list instead of assuming an older PDF remains controlling.
| Area | Code currently listed by Madison County |
|---|---|
| Building | 2024 International Building Code |
| Residential | 2024 International Residential Code |
| Mechanical | 2024 International Mechanical Code |
| Property maintenance | 2024 International Property Maintenance Code |
| Energy | 2024 International Energy Conservation Code |
| Electrical | 2023 National Electrical Code |
| Fire | 2024 International Fire Code |
| Plumbing | Illinois Plumbing Code |
| Private sewage | Illinois Private Sewage Code |
Illinois also has statewide baseline construction-code requirements effective from January 1, 2025. The Illinois Capital Development Board advises property owners and professionals to check the locally adopted code and amendments with the applicable city, village or county official. You can review the state’s current explanation on the Illinois Building Codes and Regulations page.
Madison County Shed and Accessory Building Rule
This is one local detail worth knowing before buying a prebuilt shed. Madison County’s current zoning code defines an accessory building or structure and states that a structure under 200 square feet is not subject to a building permit. However, it must still comply with accessory-structure setback requirements.
For residential districts, the county’s current accessory-use section states that an accessory structure generally must be:
- At least 5 feet from another building on the property.
- At least 5 feet from the side lot line.
- At least 7.5 feet from the rear lot line.
- At least 25 feet from a private roadway easement.
- Outside the front yard in the usual residential situation.
- Within applicable height and lot-coverage limits.
These are not a substitute for a parcel-specific zoning check. Corner lots, agricultural property, easements, floodplain conditions and the property’s zoning district can change what is allowed.
For the current legal wording, use the county’s Chapter 93 Zoning Code.
Private Sewage and Septic Projects
If a property is not served by a public sanitary sewer, involve Building & Zoning early rather than treating septic approval as an afterthought. Madison County states that its Building & Zoning Department is responsible for reviewing and approving all private sewage systems in Madison County and for private-sewage code enforcement.
Current permit packages can require private-sewage installer details, soil information, system plans, outlet-location documents and additional approvals depending on the system. The commercial application also notes that above-ground discharge systems require a discharge permit and that soil evaluations are required for submitted private-sewage permits.
Start with the county’s Private Sewage — Permits, Inspections & Complaints page or call (618) 296-4468.
How to Find an Existing Madison County Building Permit or Record
If you are buying a property, checking previous construction, trying to close an old permit or looking for inspection information, start with Building & Zoning rather than assuming an online search result contains the county’s complete records.
Have this information ready
- Exact property address.
- Parcel number if available.
- Approximate year the work occurred.
- Type of work or permit.
- Property owner’s name if known.
- Existing permit number if you have one.
Micro-step: request the record
- Call Building & Zoning at (618) 296-4468 or email zoning@madisoncountyil.gov.
- Give staff the property address and parcel number.
- Explain whether you need the permit, inspection history, final status or another document.
- If the record requires a formal public-records request, use the county’s official Public Records Center.
- Do not assume that “no online result” proves no permit ever existed; older records may require staff assistance.
Common Reasons a Madison County Permit Gets Delayed
Most avoidable delays happen before the technical review even begins. The county’s own application language makes completeness especially important.
- Applying to the county when the property is actually inside a municipality.
- Missing parcel or 911-address information.
- Incomplete or unsigned application.
- Plot plan missing property-line distances.
- Missing floor plan, specifications or truss documents.
- Missing licensed contractor information when required.
- Private-sewage documentation not included.
- Required site-development, entrance or erosion-control approval not completed.
- Zoning setbacks or proposed use not resolved before building review.
- Submitting only part of the requested document package.
For a new home or commercial project, spending a little more time assembling a complete package can save repeated email exchanges later.
Useful Madison County Forms Beyond a Basic Building Permit
The current county Forms & Applications page contains more than a standard building form. Depending on the project, useful documents include:
| Form / service | When it may matter |
|---|---|
| Accessory Building Affidavit | Accessory structure projects where the county requires the affidavit. |
| Agricultural Exemption Application | Qualifying agricultural projects. |
| Grading / Fill Permit Application | Projects involving regulated grading or fill. |
| Erosion and Sediment Control Development Application | Land disturbance where erosion-control requirements apply. |
| Manufactured Home Placement Application | Placement of a manufactured home. |
| Private Septic System Outlet Location Permit | Applicable private-sewage discharge arrangements. |
| Site Development Permit Application | Projects requiring site-development review. |
| Zoning Hearing Application | Projects requiring a zoning hearing or related relief. |
Use the live Forms & Applications page so you are working from the version currently provided by Madison County.
Related Illinois Building Department Guides
Madison County IL Building Department FAQs
1. What office handles building permits in Madison County, Illinois?
For construction under county jurisdiction, the Madison County Building & Zoning Department handles building permits and inspections. The office is at 157 N. Main Street, Suite 254, Edwardsville, IL 62025, and the main phone number is (618) 296-4468.
2. Does Madison County issue permits for every property in the county?
No. The county states that it administers its building code for construction in unincorporated Madison County. If your property is inside an incorporated city or village, that municipality may be the permit authority. Confirm jurisdiction before applying.
3. How do I apply for a Madison County building permit?
Confirm county jurisdiction, open the county’s current Forms & Applications page, complete the correct application and checklist, assemble required plans and supporting documents, and submit according to the form’s instructions. Current building application packages list zoning@madisoncountyil.gov and allow applicable submissions by email or in person.
4. What building codes does Madison County use in 2026?
The county’s current page lists the 2024 International Building, Residential, Mechanical, Property Maintenance, Energy Conservation and Fire Codes; the 2023 National Electrical Code; the Illinois Plumbing Code; and the Illinois Private Sewage Code.
5. Do I need a building permit for a small shed in Madison County?
The current Madison County zoning code says accessory structures under 200 square feet are not subject to a building permit. They still must comply with accessory-structure setback and zoning requirements, so verify placement before installing the structure.
6. How do I schedule a Madison County building inspection?
Check the inspection requirements attached to your permit, then contact the Building & Zoning office or the building inspector with your permit number, property address and requested inspection type. Lead Building Inspector Jeff Walker can be reached at (618) 296-4668. The county states that inspection requests are scheduled in the order received.
7. How much does a Madison County building permit cost?
There is no single price for every project. Fees can vary by construction type, scope, square footage and related trade or sewage work. The county’s Forms & Applications page contains its posted Permit Fee Schedule, but confirm the current calculated amount with Building & Zoning before payment.
8. What should I submit with a building permit application?
Depending on the project, the county may require a signed application, parcel and 911-address information, construction cost, contractor details, plot plan, floor plan, specifications, truss designs, utility information and separate documents for private sewage, erosion control, site access or other reviews.
9. Who handles septic or private sewage permits in Madison County?
Madison County Building & Zoning states that it reviews and approves all private sewage systems in Madison County and also handles private-sewage code enforcement. For general questions, call (618) 296-4468 or email zoning@madisoncountyil.gov.
10. How can I get an old Madison County building permit or inspection record?
Start by contacting Building & Zoning with the exact address, parcel number, approximate project year and permit type. If a formal records request is necessary, Madison County provides an official online Public Records Center for submitting and tracking requests.
Best Next Step
If your project is in unincorporated Madison County, the fastest approach is to confirm the parcel, open the current county application, assemble every item on its checklist and submit a complete package. If you are unsure about jurisdiction, setbacks, private sewage or the correct permit type, call (618) 296-4468 before paying for drawings or starting construction.
The final application, fee determination, code interpretation, permit issuance and inspection approval must come from Madison County or the municipality that actually has jurisdiction over the property.
Information check: County pages, current code listings and available permit materials were reviewed for this guide on November 4, 2026. USBuilding.org is an independent informational website and is not Madison County government. Requirements can change and property-specific conditions can affect approval, so use the responsible government office for the final determination.