Looking for the Armonk Building Department? Building permits, construction inspections, and code enforcement in Armonk, New York, are handled by the Town of North Castle Building Department in Westchester County. The office is located at 17 Bedford Road, Armonk, NY 10504. For permit questions or inspections, call 914-273-3000, extension 44.
Armonk Building Department Contact & Office Hours
| Official department | Town of North Castle Building & Engineering |
|---|---|
| Jurisdiction | Armonk, Town of North Castle, Westchester County, New York |
| Office address | 17 Bedford Road, Armonk, NY 10504 (rear annex) |
| Telephone | 914-273-3000, ext. 44 |
| Department email | building@northcastleny.gov |
| Eligible email permit submissions | Permits@northcastleny.com |
| Fax | 914-273-3554 |
| Regular hours | Monday–Friday, 8:30 a.m.–4:30 p.m. |
| Summer hours | Monday–Friday, 8:00 a.m.–4:00 p.m., from the Tuesday after Memorial Day through the Friday before Labor Day |
| Public counter restriction | Closes to the public at 2:00 p.m. on Tuesdays and Thursdays year-round |
| Official website | North Castle Building & Engineering |
Office hours are subject to holidays and government announcements. The building office is at 17 Bedford Road; the general Town Hall mailing address is 15 Bedford Road. Confirm before visiting.
Which Projects Need a Building Permit in Armonk?
North Castle generally requires permits for new construction, additions, structural alterations, demolition, and work regulated by the New York State Uniform Code or Energy Code. Some projects also require separate trade or land-use approvals.
| Project | What to check |
|---|---|
| New homes and additions | Building permit, zoning compliance, RPRC or Planning approval, construction plans. |
| Kitchen or bathroom renovation | Building permit for regulated alterations; plumbing or electrical permits where applicable. |
| Roof and window replacement | The Town lists these among residential projects eligible for email permit submission. |
| Decks, pools and sheds | Building permit applicability, zoning setbacks, coverage, and RPRC requirements. |
| Heating, cooling and boilers | Applicable building, HVAC, plumbing or electrical permits; HVAC documentation requirements. |
| Generator installation | Building permit, location survey, electrical approval and gas/plumbing permit where applicable. |
| Commercial renovations | Commercial application, occupancy classification, accessibility, fire safety and possible site-plan review. |
| Grading, fill, wetlands or rock chipping | Separate land-disturbance or specialized permits may apply. |
For decks, fences, retaining walls, pools, generators and borderline repair projects, confirm the specific requirements with the Building Department before purchasing materials or beginning work. See North Castle Town Code, Chapter 127.
How to Apply for a Building Permit in Armonk
Use the following process for a typical North Castle building permit. The submission method changes according to the project: only the categories expressly listed on the Town’s online permitting page are accepted by email.
- Check whether preliminary approval is required. Describe your project to the Building Department and confirm whether you need RPRC, Planning Board, Architectural Review Board, Zoning Board or other approvals before filing.
- Download the correct permit application. Open the official building forms page and select the residential, commercial, plumbing, HVAC or other applicable form.
- Prepare the supporting documents. Include the project description, construction drawings, required approvals, contractor license, insurance certificates and applicable fees. Standard paper building applications call for two sets of required documents.
- Submit using the approved channel. Email only eligible applications to Permits@northcastleny.com. For other projects, coordinate delivery of the completed application packet with the Building Department.
- Complete review and payment. Respond to plan-review corrections, obtain any outstanding approvals and pay the required fees. Do not begin regulated construction until the permit has been issued.
- Arrange inspections and final approval. Follow the inspection stages listed on your permit card, keep approved plans available and obtain the applicable Certificate of Occupancy or Compliance after completion.
Documents to prepare before submitting
- Completed and signed application, including owner authorization or notarization when required.
- Project address, scope of work, estimated construction value and applicable parcel identification.
- Site survey, plans and specifications appropriate to the proposed work.
- Approved RPRC or Planning determination, where required.
- Contractor’s required Westchester County license and liability coverage.
- Workers’ compensation documentation such as CE-200, C-105.2 or SI-12, as applicable.
- Disability insurance documentation such as DB-120.1 or DB-155, or acceptable exemption documentation.
- Energy-code compliance documents, structural calculations or professional plans when applicable.
North Castle requires the Town to be identified as certificate holder on applicable insurance documents. Workers’ compensation and disability proof must use acceptable state forms rather than an ordinary ACORD insurance certificate. The Town’s forms page also states that the BP-1 form is no longer accepted and directs homeowners to CE-200 documentation.
Online and Email Permit Applications: 2026 Rules
- Electrical applications using the Town’s listed inspection-service forms.
- Plumbing permit applications.
- Certain residential work: roofing, siding, replacement windows, boilers, oil tanks, kitchen renovations and bathroom renovations.
- HVAC applications, added to the email-permitting process for 2026.
Micro-steps for email submissions
- Visit the North Castle Online Permitting page.
- Open the correct application linked under the permitted category.
- Complete the form and attach the applicable insurance certificates, contractor license, plans and specifications.
- For HVAC applications, include the required Manual J and Manual S calculations along with plans and equipment specifications.
- Email the complete documents to Permits@northcastleny.com.
- Wait for the Town’s completeness confirmation. Correct and resubmit any missing information.
- After confirmation, call 914-273-3000, ext. 44, to arrange the required credit-card payment. The Town instructs applicants to pay by the next business day after confirmation; card processing fees apply.
Armonk Building Permit Fees for 2026
The following amounts come from the Town of North Castle’s published 2026 Building Department Master Fee Schedule.
| Permit or service | 2026 published fee |
|---|---|
| Residential permit application | $125 |
| Residential construction permit | $16 per $1,000 of construction cost |
| Commercial permit application | $200 |
| Commercial construction permit | $20 per $1,000 of construction cost |
| Residential Certificate of Occupancy/Compliance | $100 |
| Commercial Certificate of Occupancy/Compliance | $250 |
| Residential or commercial demolition permit | $250 |
| Revised/amended plans | $75 |
| Plumbing permit | $125 for first five fixtures; $15 per additional fixture |
| Residential electrical permit | $150 |
| Commercial electrical permit | $300 |
| Fuel oil tank removal | $150 |
| Follow-up inspection after a required inspection | Up to $100 |
| Residential temporary occupancy certificate | $200 for every 45 days |
| Commercial temporary occupancy certificate | $400 for every 45 days |
Example: residential permit fee calculation
For a residential project with an accepted construction valuation of $20,000, the published valuation-based construction fee would be $320 ($16 × 20). Adding the $125 application fee and $100 residential certificate fee gives an illustrative $545, before any additional applicable charges.
The Town’s 2026 residential application directs applicants to round construction cost up to the nearest $1,000 when determining the construction permit fee. Project-specific approvals, additional trade permits and other required services can increase the total.
How to Schedule a Building Inspection
North Castle’s published permit guide instructs permit holders to request a construction inspection by calling 914-273-3000, ext. 44, the day before the desired weekday inspection. Confirm scheduling availability and any project-specific instructions when calling.
Typical inspection stages
- Footings, foundation and preparation before concrete placement.
- Framing and structural work.
- Rough electrical, plumbing and mechanical systems.
- Fire-resistance and fire-protection components, where applicable.
- Energy compliance, insulation and related components.
- Final construction inspection after completing the approved work.
Not every project requires every inspection. Your permit card and approved plans determine the required stages. Keep the approved plans on site, and do not conceal work that must remain exposed for inspection.
If an inspection fails, correct the cited deficiencies and arrange reinspection before covering the affected work. Town Code §127-5 also allows remote inspections at the inspector’s discretion when an equivalent level of review is possible; applicants should not assume remote inspection is automatically available.
Final Certificate of Occupancy or Compliance
After construction, obtain approvals from all applicable reviewing departments and complete the required final inspections. The Building Department then determines whether the project qualifies for a Certificate of Occupancy (CO) or Certificate of Compliance (CC).
For eligible unfinished projects, the Building Inspector may issue a Temporary Certificate of Occupancy at their discretion if the relevant portion can be occupied safely. Temporary approval is not guaranteed.
RPRC, Zoning and Other Local Approvals
A distinctive part of permitting in North Castle is the Residential Project Review Committee (RPRC). It screens residential work for environmental, zoning, coverage and planning issues before directing the project to the Building Department or an appropriate review board.
RPRC review generally includes exterior residential projects and can involve additions, pools, accessory structures, wetlands and steep-slope work. Projects involving only interior alterations or renovations are excluded from the RPRC process described by the Town.
How to obtain an RPRC determination
- Visit the official RPRC Process page.
- Complete the required application and checklist.
- Prepare floor-area and gross-land-coverage worksheets, drawings and required supporting materials.
- Combine the documents into the single PDF submission requested by the Planning Department.
- Email the submission to planning@northcastleny.gov and follow the department’s fee instructions.
- Review the issued determination letter and complete any required corrections or board approvals before proceeding with the building permit.
The Planning Department is reachable at 914-273-3000, ext. 43. RPRC and Planning fees are separate from building permit fees.
Projects in regulated wetlands, floodplains, steep slopes or properties with private wells and septic systems may need additional approvals, including review by the Town Engineer or Westchester County Department of Health. Property-specific zoning should be checked using the North Castle zoning information page.
Building Codes Applicable in 2026
North Castle administers the New York State Uniform Fire Prevention and Building Code and State Energy Conservation Construction Code, together with applicable local requirements.
The 2025 New York State Uniform Code and 2025 Energy Code became effective December 31, 2025. Building permit applications submitted in 2026 generally must comply with these updated provisions, subject to applicable legal exceptions and court orders.
The updated code family addresses residential and commercial construction, plumbing, mechanical systems, fuel gas, fire prevention, property maintenance, existing buildings and energy conservation.
2026 caution: Some older North Castle guidance still references the 2020 New York State codes. Use the newer 2025 code materials for current applications. New York State also reports a court-ordered suspension affecting certain 2025 fossil-fuel equipment restrictions; this does not suspend the entire code update.
Permit Expiration, Records and Code Complaints
How long does a North Castle building permit remain valid?
Under Town Code §127-4(I), a building permit becomes invalid if authorized work is not commenced within 12 months after issuance and expires 24 months after issuance. An expired or invalid permit may be renewed through an approved application and applicable fee.
How to request existing building files
For past permits, approved plans, certificates or property building records, North Castle directs applicants to its online Freedom of Information Law (FOIL) request system.
- Open the Town’s FOIL information page.
- Choose the online public records request form.
- Identify the property address and request the specific permit, certificate or building-file records needed.
- Follow the Town’s response instructions. Access may depend on applicable public-record disclosure rules.
Reporting unsafe work or property-maintenance problems
The Building Department handles code-enforcement and property-maintenance complaints. Visit the Building & Engineering department page and select the official Building Department Complaint Form. Describe the property address, concern and relevant facts as precisely as possible.
Frequently Asked Questions
1. Does Armonk have its own building department?
No. Armonk is served by the Town of North Castle Building Department, which handles building permits, construction inspections and code enforcement for properties under its jurisdiction.
2. Where is the Armonk Building Department located?
The office is at 17 Bedford Road, Armonk, NY 10504. Regular hours are Monday through Friday, 8:30 a.m. to 4:30 p.m., with seasonal summer hours. The public counter closes at 2 p.m. on Tuesdays and Thursdays. Call 914-273-3000, ext. 44, before visiting.
3. Do I need a permit to replace a roof or renovate a kitchen in Armonk?
North Castle lists roof replacement and kitchen renovations among residential projects requiring permit review and eligible for email submissions. Plumbing, electrical or other permits may also be necessary depending on the work.
4. Can I submit a North Castle building permit application online?
Only specified applications are accepted by email, including electrical, plumbing, certain residential renovation and HVAC applications. Send eligible applications to Permits@northcastleny.com with the required documents. Other projects must follow the Building Department’s standard submission process.
5. How much does a building permit cost in Armonk in 2026?
The published residential application fee is $125 plus $16 per $1,000 of construction cost. Commercial applications are $200 plus $20 per $1,000 of construction cost. Certificate charges and other project-specific fees may apply.
6. How long does North Castle take to approve a building permit?
The Town’s published goal is approximately two to four weeks for the initial plan review. Corrections, re-reviews, workload and required outside approvals can extend the process. This is a review target, not a guaranteed permit issuance date.
7. What is RPRC approval, and do I need it?
The Residential Project Review Committee screens many exterior residential projects for zoning, site and environmental issues. Interior-only renovations are generally excluded from this process. Contact the Planning Department at 914-273-3000, ext. 43, to confirm whether your project requires review or qualifies for an exemption.
8. How do I schedule a building inspection in Armonk?
Call the North Castle Building Department at 914-273-3000, ext. 44, the day before the requested weekday inspection, following the Town’s published guidance. Keep approved plans available and do not cover work awaiting inspection.
9. Can I build a small storage shed without a building permit?
Town Code §127-4(B) exempts certain one-story detached storage sheds or similar structures associated with eligible dwellings when the gross floor area is no more than 64 square feet. Zoning, setback or other approvals can still apply, so confirm the proposed location and design before building.
10. How do I obtain an old building permit or Certificate of Occupancy in Armonk?
Use the Town of North Castle’s official online FOIL request process to request available building-file records, previous permits or occupancy certificates. Include the complete property address and specify the records you need.
Official North Castle Building Department Resources
For quick access, these primary sources cover the main tasks described in this guide:
- Building & Engineering — official department contacts, hours and services.
- Building Applications & Information — residential, commercial, plumbing, HVAC, revision and other permit forms.
- Online Permitting — eligible email submissions, document requirements and payment procedures.
- 2026 Building Fee Schedule (PDF) — official published charges.
- Building Permit Process Guide (PDF) — local review and inspection workflow; check newer state codes for 2026 work.
- RPRC Process — residential preliminary review requirements.
- FOIL Records Requests — requesting existing permit and building records.
Verify the property’s zoning, required permit type, any prior RPRC or Planning approval, the correct submission method and the applicable 2025 New York State code provisions. Obtain the issued permit before starting regulated construction.
Information reviewed: October 2026. This is an independent informational guide, not an official Town of North Castle government website. Government procedures and fees can change.