Borough of Paramus Building Department 2026: Permits, Inspections & Services

The Borough of Paramus Building Department handles construction permits, building inspections, and code enforcement for properties within Paramus, Bergen County, New Jersey. Residents and contractors can contact the department at 201-265-2100, extension 2230, or visit the municipal office at 1 West Jockish Square, Lower Level.

2026 Quick Answer

Need a permit or inspection? Contact the Paramus Building Department before starting construction. The permit counter is open Monday through Friday, 8:30 a.m. to 3:00 p.m. Inspections operate Monday through Friday, 8:00 a.m. to 3:30 p.m.

The borough accepts construction permit applications using New Jersey Uniform Construction Code forms. Projects may also need zoning approval before a building permit is issued.

View the official Paramus Building Department page →

Paramus Building Department Contact Information

DepartmentBorough of Paramus Building Department
JurisdictionParamus Borough, Bergen County, New Jersey
Address1 West Jockish Square, Lower Level, Paramus, NJ 07652
Phone201-265-2100, ext. 2230
Fax201-265-5631
EmailBuilding@paramusborough.gov
Construction OfficialMichael O’Connell
Permit counter hoursMonday–Friday, 8:30 a.m.–3:00 p.m.
Inspection hoursMonday–Friday, 8:00 a.m.–3:30 p.m.
Official websiteParamus Building Department
Payment notice: The borough states that credit card payments are not accepted at the Building Department counter. Confirm currently accepted payment methods before visiting.

What Services Does the Department Provide?

Construction Permits Permit applications, plan review, and construction approvals.
Building Inspections Required inspections during construction and renovation.
Code Compliance Review of work under applicable New Jersey construction codes.
Project Guidance Permit forms, technical sections, and coordination with zoning.

The department administers construction-code requirements. Separate borough offices may handle zoning, planning approvals, variances, certain fire permits, and other project-specific approvals.

When Do You Need a Building Permit in Paramus?

Most construction, structural alterations, major renovations, and regulated electrical, plumbing, or mechanical work require permits. New Jersey’s Uniform Construction Code provides exceptions for qualifying ordinary repairs, but the classification depends on the exact work.

ProjectWhat to Check Before Starting
Home additions and new housesBuilding permit, construction plans, zoning review, and required subcode approvals.
Kitchen or bathroom remodelingBuilding, plumbing, and electrical permits depending on the work involved.
Roofing and sidingWhether the particular replacement qualifies for an exemption or needs a permit.
Decks, porches, and stepsBuilding requirements, setbacks, zoning, and structural details.
Fences, sheds, and retaining wallsLocation, height, dimensions, zoning, and applicable construction requirements.
Driveways, patios, and walkwaysParamus site work permit requirements and zoning limitations.
Swimming poolsPool construction, barriers, electrical work, zoning, and site requirements.
Generators and HVACEquipment location, applicable mechanical/electrical work, and site approvals.
Electrical panels and service upgradesElectrical subcode permit and inspections.
DemolitionApplicable demolition permit and associated utility or safety requirements.
Commercial alterationsBuilding and trade permits, zoning, fire protection, and occupancy considerations.

Paramus-specific requirement: The borough also identifies site work permits for patios, walkways, driveways, generators, air conditioners, and pool equipment. Its published instructions call for a completed site work application, permit jacket, and survey no older than 20 years showing the proposed improvement and setbacks.

See the official Paramus construction permit requirements before applying.

How to Apply for a Paramus Building Permit

Follow these steps to avoid submitting incomplete forms or applying through the wrong department.

  1. Confirm the permit requirement.

    Write down the project address, the type of work, and whether structural, electrical, plumbing, mechanical, or zoning changes are involved. Call extension 2230 if the required permit type is unclear.

  2. Open the official permit information page.

    Visit Paramus Construction Permits. Review the submission requirements and identify the UCC forms that apply to your project.

  3. Download the application forms.

    Open the borough’s Licenses & Permits page. Find the section labeled Building, Board of Adjustment, Planning & Zoning. Download the construction permit application, permit jacket, and applicable technical sections.

  4. Prepare plans and supporting documents.

    Gather the project scope, estimated construction cost, contractor information, drawings, specifications, and property survey if required. Plans generally must be signed and sealed by a New Jersey licensed architect or engineer when required by law. Applicable owner-occupied one-family homeowner drawings may instead be signed and dated by the homeowner under the borough’s stated requirements.

  5. Check zoning requirements.

    Confirm whether setbacks, lot coverage, building height, use restrictions, site work, or other zoning rules affect the project. Complete the zoning review forms when required.

  6. Submit your application.

    Contact the Building Department to confirm the currently accepted submission method. The borough publishes downloadable forms and provides them through its department. Do not assume every construction permit can be completed through the general online licensing portal.

  7. Resolve review comments and pay applicable fees.

    If plans or documents need corrections, submit the requested revisions. Confirm the permit and zoning charges with the borough before paying.

  8. Obtain the approved permit before beginning regulated work.

    Keep approved plans available at the job site and arrange the required inspections as work progresses.

Common application mistake: Submitting the construction permit paperwork without the necessary zoning documents, trade subcode forms, or survey can delay review. Check the complete document package before submission.

Which Paramus Permit Forms Do You Need?

The borough uses New Jersey Uniform Construction Code forms. Select the forms based on the actual work rather than submitting every form.

FormPurpose
UCC-F170Construction permit document identifying the project, property, contractor, and estimated work cost.
UCC-F100Construction Permit Application, including the required certification.
UCC-F110Building Subcode Technical Section for applicable building work.
UCC-F120Electrical Subcode Technical Section.
UCC-F130Plumbing Subcode Technical Section.
UCC-F140Fire Protection Subcode Technical Section.
UCC-F145Mechanical technical section for applicable residential equipment work.
UCC-F370Chimney verification for replacement of fuel-fired equipment.
UCC-F390Framing checklist for applicable new construction and additions.
Site Work ApplicationApplicable driveways, patios, walkways, equipment installations, and other site improvements.
Zoning Review FormsRequired zoning review, project information, and associated fees where applicable.

Important trade requirement: Electrical and plumbing applications generally require the relevant licensed trade professional’s signature and seal. The borough identifies an exception for qualifying work performed by a homeowner in an owner-occupied single-family dwelling. Confirm eligibility before relying on this exception.

Access the official Paramus permit forms and project handouts →

Paramus Permit Fees and Zoning Charges

Construction permit costs depend on the work performed and the applicable New Jersey Uniform Construction Code and municipal fee schedules. Building, electrical, plumbing, and mechanical permit charges may be calculated separately.

Published Zoning Review Fees

A borough zoning review fee application available online lists the following charges:

Application CategoryPublished Fee
Specified residential applications, including new dwellings, additions, add-a-levels, dormers, decks, and pools$25
Specified commercial applications, including new buildings, additions, and site plan reviews$200
Minor residential projects identified as exempt from that zoning review feeNo fee under the listed exemption

Source: Borough of Paramus Zoning Review Fee Application (PDF). This is an older published form; the fee amounts were not independently confirmed as unchanged in October 2026. Verify them before payment. A zoning-fee exemption does not mean the work is exempt from construction permits or other charges.

For the actual construction permit fee, provide the department with your project type, estimated cost, dimensions, and applicable trades. Request the current fee calculation instead of relying on an unofficial flat-rate estimate.

How to Schedule a Building Inspection in Paramus

New Jersey requires inspections at specified stages of permitted construction. The Paramus Building Department conducts inspections Monday through Friday.

  1. Confirm the inspection stage. Review your permit and approved plans to identify the required inspection.
  2. Prepare the necessary details. Have the property owner’s name, job-site address, permit number, and inspection type ready.
  3. Contact the department. Call 201-265-2100, extension 2230, and ask for the current inspection scheduling procedure.
  4. Make the work accessible. Keep the work exposed where inspection is required and make sure the inspector can safely reach the inspection area.
  5. Resolve any deficiencies. If corrections are required, complete them and arrange a reinspection before proceeding with work that depends on approval.

Inspection operating hours are 8:00 a.m. to 3:30 p.m., Monday through Friday. These are not guaranteed appointment times. Confirm the actual scheduling date, time window, and notice requirements with the department.

Common Required Inspections

InspectionWhen It Takes Place
FootingAfter footing excavation and before concrete placement.
FoundationBefore the foundation is backfilled.
Electrical roughBefore electrical wiring is concealed, as applicable.
Plumbing roughBefore applicable plumbing work is concealed.
FramingAfter required rough electrical and plumbing approvals.
InsulationBefore drywall or wall coverings are installed; the building must be protected and watertight.
Final inspectionsAt completion of the applicable permitted work, before final sign-off.
Foundation survey requirement: Paramus states that for new structures or additions over 500 square feet, or free-standing structures covered by its inspection guidance, a Foundation Location Survey must be provided before requesting the foundation/backfill inspection. Check the precise applicability with the department for your project.

Read Paramus’s official inspection requirements →

How to Check Permit Records and Application Status

Paramus lists an SDL property and permit lookup service through its official online services directory.

  1. Open Paramus Online Services.
  2. Find the option labeled SDL Portal Property/Permit Lookup.
  3. Open the linked service and review the available search fields.
  4. Search using the supported property address, permit number, or other requested information.
  5. Review available records and contact the Building Department if an application is missing or additional verification is needed.

Not every record or application status is necessarily available online. Some historical files, plans, and detailed inspection records may require a direct department inquiry or a formal records request.

Paramus Zoning Approval: Who Should You Contact?

A construction permit does not automatically authorize work that violates local zoning. Paramus regulates setbacks, permitted uses, height, site coverage, signs, and other location-specific matters.

Residential Zoning 201-265-2100, ext. 2237 Residential zoning questions and applicable commercial signage matters.
Commercial Zoning 201-265-2100, ext. 2236 Commercial zoning and related project reviews.

For decks, pools, sheds, patios, driveways, fences, additions, or other exterior improvements, verify zoning restrictions before purchasing materials or submitting construction plans.

Paramus provides residential zoning requirements, commercial zoning requirements, site work applications, generator guidance, pool checklists, and project-specific handouts through its official forms directory.

2026 Building Codes Applicable in Paramus

Paramus enforces New Jersey’s Uniform Construction Code, N.J.A.C. 5:23, together with applicable municipal ordinances. The New Jersey Department of Community Affairs adopted updated construction-code editions effective August 17, 2026.

SubcodeState-Listed 2026 Edition
Building2024 International Building Code, New Jersey edition
One- and two-family dwellings2024 International Residential Code, New Jersey edition
Electrical2023 National Electrical Code (NFPA 70)
Plumbing2024 National Standard Plumbing Code
Mechanical2024 International Mechanical Code
Fuel gas2024 International Fuel Gas Code
Low-rise residential energy2024 International Energy Conservation Code
Commercial and other residential energyASHRAE 90.1-2022
Existing-building rehabilitationNew Jersey UCC Rehabilitation Subcode, N.J.A.C. 5:23-6

Important 2026 code update: The Paramus Building Department webpage still displays some earlier adopted code editions. New Jersey’s current state code page lists updated editions with an August 17, 2026 adoption date. For a new application, verify applicable transition provisions, permit filing dates, and local requirements with the department rather than relying on the older borough webpage alone.

View New Jersey’s current adopted construction codes →

Paramus also maintains municipal construction and zoning ordinances. Review applicable local requirements when work affects land use, setbacks, site improvements, or property-specific approvals.

Certificate of Occupancy and Final Approval

Depending on the project, completion may require final inspections, construction-code sign-offs, and a certificate of occupancy or another applicable approval before the property or altered space can be occupied or used.

Paramus provides a certificate-of-occupancy application option for business and residential matters through its official licensing and permit directory.

  1. Open the Paramus Licenses & Permits page.
  2. Find the certificate-of-occupancy portal link in the Building, Planning & Zoning section.
  3. Select the applicable residential or business service.
  4. Follow the portal’s instructions and provide the requested property or application information.
  5. Confirm which inspections and approvals must be completed before issuance.

Do not assume that every renovation or property sale requires the same certificate. Requirements depend on the nature of the work and the applicable municipal and state rules.

Common Permit Problems and How to Resolve Them

ProblemPractical Next Step
Application returned as incompleteCheck missing signatures, forms, plans, contractor details, or zoning documents.
Project conflicts with zoningContact the appropriate zoning office before revising plans or seeking a variance.
Permit status not visible onlineConfirm the application number and request a status update from the department.
Inspection not approvedObtain the correction details, complete the work, and arrange reinspection.
Permit issued under older code requirementsAsk which adopted code and transition provisions apply to that permit.
Work started without a required permitContact the department promptly to determine the approval and correction process.

Working without permits: Paramus warns that unauthorized work can lead to penalties, required corrections or removal, and insurance-related complications. Its permit information references fines of $2,000 per violation. Actual enforcement depends on the applicable legal provisions and circumstances.

Excavation safety: Before digging for footings, fences, utilities, or other site improvements, contact New Jersey’s utility mark-out service by dialing 811 or using the published number 800-272-1000? The borough’s own construction permit page lists 800-272-1100 or 811. Use 811 as the primary dialing option and confirm current service instructions before excavation.

Official Paramus Building Department Resources

For projects in Bloomfield, New Jersey, see the New Jersey section of our Bloomfield Building Department guide. Paramus and Bloomfield have separate local construction offices.

Frequently Asked Questions

1. Where is the Borough of Paramus Building Department located?

The Building Department is located at 1 West Jockish Square, Lower Level, Paramus, NJ 07652. Its permit counter is open Monday through Friday, 8:30 a.m. to 3:00 p.m.

2. What is the Paramus Building Department phone number?

Call 201-265-2100, extension 2230, for building permit questions, inspection information, and construction-code assistance.

3. How do I apply for a building permit in Paramus?

Download the applicable New Jersey UCC permit forms from the borough’s official permits page, prepare the required plans and project information, complete any necessary zoning review, and confirm the submission procedure with the Building Department.

4. Do I need a permit to replace a roof or install a fence in Paramus?

Permit requirements depend on the exact work and applicable ordinary-repair exemptions. Paramus identifies roofing and fences among projects that may require approval, so confirm construction and zoning requirements before starting.

5. How do I schedule a construction inspection in Paramus?

Contact the Building Department at 201-265-2100, extension 2230, with the owner’s name, property address, permit number, and inspection type. Inspections operate Monday through Friday, 8:00 a.m. to 3:30 p.m.

6. How much does a Paramus building permit cost?

Construction permit fees vary by project scope, applicable subcodes, and municipal fee requirements. A published borough zoning form lists certain residential review fees at $25 and certain commercial review fees at $200, but these older amounts should be confirmed before payment.

7. Can I check my Paramus building permit status online?

Paramus lists an SDL property and permit lookup service on its official Online Services page. Available records vary, so contact the Building Department if the permit or status you need is not shown.

8. Does Paramus require zoning approval before a building permit?

Some projects require zoning review before construction permits can be approved, particularly additions, pools, decks, site work, and projects affecting setbacks or permitted land use. The required approvals depend on the property and project.

9. Which building codes apply in Paramus in 2026?

Paramus enforces New Jersey’s Uniform Construction Code. New Jersey adopted updated editions effective August 17, 2026, including the 2024 IBC and IRC and 2023 NEC. Confirm applicable transition rules and local amendments for your permit.

10. What happens if I build without a required permit in Paramus?

Unpermitted work may result in enforcement action, fines, required corrections, or removal of noncompliant construction. Paramus warns of penalties and potential insurance complications. Contact the Building Department to determine the proper corrective process.

Leave a Comment