Broward Building Department 2026: Permits, Inspections & Services

Broward County Building Permits, Inspections & Official Services

Quick answer: The Broward County Building Code Division provides building permitting, plan review, inspections, code enforcement, contractor licensing and elevator services for the Broward Municipal Services District (unincorporated Broward County), Fort Lauderdale-Hollywood International Airport, and certain jurisdictions served under interlocal agreements.

Important: Broward County does not issue ordinary building permits for every property in every incorporated city. Many municipalities operate their own building departments, so confirm the property’s actual permitting jurisdiction before applying.

Office2307 W. Broward Boulevard, Suite 300
Fort Lauderdale, FL 33312
Published HoursMonday–Friday
8:00 AM–3:30 PM Eastern

Does Broward County Handle Your Building Permit?

This is the first question to answer. The county Building Code Division directly serves the Broward Municipal Services District (BMSD), which covers unincorporated areas, and it also performs certain services at Fort Lauderdale-Hollywood International Airport and for jurisdictions that contract with the county.

Property situationWhere to start
Unincorporated Broward County / BMSDBroward County Building Code Division.
Inside an incorporated Broward municipalityCheck that city’s building department first. Some municipalities use county services through agreements.
Fort Lauderdale-Hollywood International Airport constructionBroward County provides building-code services, but the submission process differs from ordinary BMSD ePermits.
Unsure which government controls the parcelConfirm the municipality/unincorporated status before paying fees or uploading plans.
Do not use the mailing city alone. A postal address can show Fort Lauderdale or another city name even when the parcel is in an unincorporated area. Permitting jurisdiction follows the property’s legal governmental boundary, not simply the postal city.

What Permits and Services Does the Broward Building Department Handle?

Depending on the project and jurisdiction, the Building Code Division deals with structural building work and regulated electrical, plumbing, mechanical, roofing and related construction. Separate zoning, environmental, fire, drainage or development approvals may also be required.

Project or serviceWhat to expect
New homes and buildingsBuilding plans, applicable trade permits, zoning/development review and staged inspections.
Additions and remodelingBuilding review plus electrical, plumbing or mechanical permits when those systems are affected.
Roof replacementRoofing permit, product/wind documentation and applicable inspections.
Electrical workPermits for regulated electrical installation, alteration or service work.
HVAC / mechanicalMechanical permitting for applicable air-conditioning and ventilation work.
PlumbingPlumbing permit and inspections for regulated installations and alterations.
Pools, fences, driveways and accessory workPermit requirements depend on scope; zoning and other reviews may apply separately.
Contractor licensingThe division administers county contractor licensing and enforcement functions.
ElevatorsRegional elevator permitting, inspections, certificates and safety enforcement.
Building Safety Inspection ProgramApplicable older buildings may be subject to Broward’s periodic structural/electrical safety inspection requirements.

How to Apply for a Broward County Building Permit

For eligible BMSD projects, Broward County uses its ePermits system. The county’s current electronic-permitting guide describes the following workflow.

  1. Confirm Broward County is the correct authority.
    Verify that the job site is in the BMSD or another area for which the county is handling the permit.
  2. Determine the master permit and trade permits.
    Identify the main project and all affected disciplines—building, roofing, electrical, plumbing, mechanical or other required approvals.
  3. Prepare the current permit application and plans.
    Use Broward County’s current Uniform Permit Application and gather the plans, survey/site information and supporting documents required for your scope.
  4. Create an ePermits account.
    Open the official ePermits portal, choose Register, enter the required account information, validate the email sent by the system and complete the user profile.
  5. Start the application.
    After signing in, choose Submit Application and select BCS Master Permit. Accept the terms, enter the required property, owner, applicant and permit-holder information, and add related parties if applicable.
  6. Upload the project documents.
    Upload plans and supporting files for the permit type. Broward’s guide instructs applicants to classify at least one uploaded file as a supplemental document when required by the portal workflow.
  7. Watch for the county email.
    If the application is accepted, staff sends the permit/application number and instructions for paying the application or initial plan-review fees. If rejected at intake, the response explains what must be corrected.
  8. Complete plan review corrections.
    Monitor the application for reviewer comments. When replacing a rejected document, Broward instructs applicants to upload the corrected version using the same document name as the file it replaces.
  9. Pay final permit charges and download approvals.
    The permit is not issued until required fees are paid. After approval, download the approved plans, documents and permit card and keep the required copies available for inspections.
Current county website notice: Broward County states that website-upgrade work can make ePermits temporarily unavailable. If the portal is unavailable, use the permitting/forms resources on the official Building Code Division page or contact the division at 954-765-4400.

When ePermits may not be available for your application

Broward’s current BMSD electronic-permitting guide lists several situations that require another submission method. These include owner-builder permits, Fort Lauderdale-Hollywood International Airport permits, certain interlocal-agreement jurisdictions, and applications for which physical plan review is required.

For a physical BMSD submission, the county guide calls for completed permit applications, two sets of plans and applicable supporting documents at the Building Code Division office.

Documents to Prepare Before Applying

The exact package depends on the project, but preparing these items before starting the application can prevent avoidable intake and plan-review delays.

  • Current Broward County Uniform Permit Application.
  • Property address and parcel/folio information.
  • Clear description and valuation of the proposed work.
  • Applicable site plan or survey.
  • Construction plans defining the work for each affected discipline.
  • Structural calculations, product approvals or engineering documents when applicable.
  • Contractor/qualifier license information.
  • Current general-liability and workers’ compensation coverage where required.
  • Development, environmental, zoning, fire or other agency approvals when applicable.
  • Recorded Notice of Commencement when required.

Notice of Commencement: important 2026 rule

Broward’s electronic-permitting instructions state that a recorded Notice of Commencement is required for applicable projects with a job value of $5,000 or more, or $15,000 or more for qualifying air-conditioning replacement or repair work. The county instructs applicants to provide the required recorded documentation before the first inspection.

Florida’s current construction-lien law also requires a Notice of Commencement for qualifying improvements and requires applicable recording information to be supplied to the permitting authority before inspections proceed. Use the county’s Notice of Commencement form and follow the current recording requirements for your project.

Broward County Building Permit Fees in 2026

Broward does not charge one flat amount for every permit. The county’s currently published Building Code fee schedule uses minimum fees and, for major disciplines, valuation-based calculations. Plan review, reinspections, surcharges and other services can add to the permit total.

Published chargeAmount / calculation
Permit application processing fee$125, nonrefundable and additional to applicable permit fees
Minimum permit fee$125
Minimum roofing permit fee$250
Structural permitGreater of minimum fee or 3.0% of job value up to $9,999,999.99; 2.5% for job values over $10 million
Electrical permitGreater of $125 minimum or the applicable 3.0% / 2.5% valuation calculation
Mechanical permitGreater of $125 minimum or the applicable 3.0% / 2.5% valuation calculation
Plumbing permitGreater of $125 minimum or the applicable 3.0% / 2.5% valuation calculation
Preapplication plan review$98 per hour
Preinspection$100
First reinspection for same violation$100; subsequent repeated reinspections may increase in $100 steps
Minor plan change after issuance$98 per hour or fraction
Permit extension$50
Expired permit$125 minimum; other renewal rules and charges apply
Change of contractor$75
Work performed without required permitPublished schedule lists a double fee

These are selected charges from the Broward County fee schedule currently published by the Building Code Division. Plan review, statutory surcharges, specialty services and project-specific charges can change the final amount. Review the official fee schedule (PDF) before budgeting.

Expired permits and extensions

The published county fee schedule states that an expired permit may generally be renewed within 180 days after expiration by paying one-half of the original permit fee, subject to the minimum charge and applicable conditions. After that 180-day period, a new permit may be required and the project can become subject to newer regulations and full permitting fees.

How to Schedule a Broward Building Inspection

After the permit is issued, Broward provides an online BCS Request Inspection system.

  1. Find the permit number. Use the issued permit documents or fee statement.
  2. Locate the Phone Access Code. Broward’s permitting guide states that this code appears on the Fee Statement.
  3. Open Request Inspection. Enter both the permit number and Phone Access Code.
  4. Select the required inspection. Request the inspection that matches the current stage of work.
  5. Prepare the job site. Approved plans, documents and the permit card should be available as required. Do not conceal work that still needs inspection.
  6. Check the result. If corrections are required, complete them before requesting the next inspection or reinspection.

Common inspection stages

Depending on the permit, inspections can include foundation or footing, slab, framing, roofing, rough electrical, rough plumbing, mechanical, insulation, fire-related work and final inspections. Your issued permit and approved plans—not a generic list—determine which inspections are required.

High-Velocity Hurricane Zone: Broward County is within Florida’s High-Velocity Hurricane Zone. Wind-resistance details, approved products, roofing systems, openings and installation documentation can therefore be especially important during plan review and inspection.

You can search Broward building permits without starting a new application. The county’s BCS search supports searches using a property address, folio number or parcel ID.

  1. Open the Broward Permit Search by Address.
  2. Choose the search method: address, folio number or parcel ID.
  3. If using an address, enter the requested street fields. The county portal specifically instructs users not to enter unit or suite information in that address search.
  4. Open the matching property record and review available permits and permit activity.

What ePermit statuses mean

StatusPractical meaning
SubmittedThe electronic application has been received and is awaiting or undergoing intake/review.
Plan ReviewApplicable disciplines are reviewing the submitted documents.
Waiting for CustomerReview comments or rejected items require action from the applicant.
Reviews CompletePlan review is approved; pricing or issuance steps may still remain.
Pending / Waiting for PaymentAn outstanding fee must be paid.
Ready to IssueReview is substantially complete, but final permit/subpermit issuance requirements remain.
Permit IssuedThe permit has been issued and permitted work may proceed subject to its conditions.
Permit Final / CompletedRequired final approvals have been completed for the applicable permit or master permit.

Which Building Code Applies in Broward County in 2026?

Code transition: As of October 19, 2026, the Florida Building Code, 8th Edition (2023) remains the effective statewide edition. The 9th Edition (2026) is scheduled to become effective on December 31, 2026.

This distinction matters for applications submitted near the end of 2026. Projects submitted after the new code becomes effective may need to comply with the 9th Edition requirements.

Broward’s Board of Rules and Appeals (BORA) also publishes Broward-specific technical amendments, interpretations, forms and building/fire-code resources. Check applicable county amendments in addition to the statewide code.

Certificate of Occupancy, Completion & Final Approval

Passing an individual inspection does not necessarily close a project. New construction, changes of occupancy and certain other projects require final documentation and a Certificate of Occupancy (CO), Certificate of Completion (CC), Temporary CO or another final approval.

Broward’s current permitting packet states that the applicable CO/CC package should be submitted to Building Permitting before scheduling the final building inspection.

Depending on the project, the final package can require items such as:

  • Permit card showing applicable approved final inspections.
  • Final survey.
  • Soil-treatment documentation.
  • Insulation certificate.
  • Special or threshold inspector certification.
  • Zoning/landscape final approval.
  • FEMA final survey and elevation certificate where applicable.
  • Fire final approval.
  • Residential air-leakage / blower-door documentation.
  • Energy Performance Level documentation.
  • Applicable water, stormwater, development or environmental releases.

Only the documents relevant to your project are required. Check outstanding agency holds before requesting final building approval.

Other Broward Building Department Services

Contractor licensing and complaints

The Building Code Division regulates county contractor licensing and handles complaints involving applicable county-licensed contractors and unlicensed activity. For assistance, call 954-765-4400. Complaints concerning Florida state-licensed contractors can also fall under the Florida Department of Business and Professional Regulation.

Elevator safety

Broward County provides regional elevator permitting and enforcement and administers requirements connected with elevator certificates, inspections and alterations. Elevator work uses specialized applications and procedures rather than the ordinary residential building-permit workflow.

Building Safety Inspection Program

Broward’s Building Safety Inspection Program applies periodic structural and electrical safety reviews to qualifying existing buildings. The published fee schedule lists a $350 processing fee for applicable recertification applications and $50 for qualifying extension requests. Building owners should use BORA’s current program requirements rather than assuming an ordinary construction inspection satisfies recertification obligations.

Official Broward Building Resources

TaskOfficial resource
Building department informationBroward County Building Code Division
Apply electronicallyBroward ePermits
Search permits by address / folioBCS Permit Search
Request an inspectionBCS Request Inspection
Permit fee scheduleBuilding Permit Fees PDF
Building-code amendments / BORABORA Forms & Code Resources
Florida building codesFlorida Building Commission

Related Florida Building Department Guides

If your project is elsewhere in Florida, permitting procedures and fees can be completely different. These USBuilding.org guides cover other Florida jurisdictions:

Broward Building Department FAQs

1. Where is the Broward County Building Department located?

The Broward County Building Code Division lists its office at 2307 W. Broward Boulevard, Suite 300, Fort Lauderdale, FL 33312. Published office hours are Monday through Friday, 8:00 AM–3:30 PM, excluding county-observed holidays.

2. What is the Broward Building Department phone number?

Call 954-765-4400 for Building Code Division assistance, including permitting questions, forms and permit-status help.

3. Does Broward County issue permits for every city in the county?

No. The county directly serves the Broward Municipal Services District and certain other jurisdictions/services. Many incorporated municipalities maintain their own building departments. Confirm jurisdiction before applying.

4. Can I apply for a Broward building permit online?

Eligible BMSD applications can be submitted through Broward’s ePermits system. Owner-builder permits, certain contract-jurisdiction permits, airport projects and some applications requiring physical plan review use different submission procedures.

5. How do I search Broward County building permits by address?

Use the county’s BCS Permit Search by Address. You can search using the requested address fields, folio number or parcel ID and then review available permit records for the matching property.

6. How do I schedule a Broward building inspection?

Open the BCS Request Inspection system after your permit is issued. Enter the permit number and the Phone Access Code shown on the permit Fee Statement, then select the appropriate inspection.

7. How much does a Broward County building permit cost?

Costs vary by scope and valuation. The published minimum permit fee is $125 and the minimum roofing permit fee is $250. Structural, electrical, mechanical and plumbing permits can use valuation-based calculations, with plan-review fees and other charges added separately.

8. When is a Notice of Commencement required in Broward County?

Broward’s current permitting guidance requires recorded Notice of Commencement documentation for applicable projects valued at $5,000 or more, with a $15,000 threshold identified for qualifying air-conditioning replacement and repair work. Submit required documentation before the first inspection.

9. Which Florida Building Code applies in Broward County in October 2026?

As of October 19, 2026, the Florida Building Code, 8th Edition (2023), remains effective. The 9th Edition (2026) is scheduled to become effective December 31, 2026. Broward-specific amendments and interpretations may also apply.

10. What should I do if my Broward permit is waiting for customer action?

Open the application in ePermits and review the plan-review comments or rejected documents. Correct the requested information and upload the replacement through the existing application. Broward’s guide instructs applicants to retain the same document name when replacing a corrected plan-review file.

Before starting construction: Confirm the property jurisdiction, identify every required permit and outside approval, use the current forms, resolve plan-review comments, obtain the issued permit, and schedule inspections before regulated work is concealed. For a property-specific decision, contact Broward County Building Code Division at 954-765-4400 or building@broward.org.

Information reviewed for 2026. USBuilding.org is an independent informational resource and is not affiliated with Broward County Government. Fees, portals, office procedures, code editions and project requirements can change; the responsible government authority controls property-specific permitting decisions.

Leave a Comment