East Hampton, New York Building Department 2026: Permits, Inspections & Services

East Hampton Building Permits & Inspections: What to Do in 2026

If you are planning construction, an addition, renovation, deck, pool, accessory structure, demolition, or another regulated project in East Hampton, the most important first step is surprisingly simple: make sure you are using the correct East Hampton Building Department.

Quick answer: For property under the Town of East Hampton, Building Department applications are submitted online through the Town’s OpenGov portal. The Town Building Department is currently located at 300 Pantigo Place, Suite 110, East Hampton, NY 11937, and the main number is 631-324-4145. If your property is actually inside the incorporated Village of East Hampton, a separate Village Building Department handles the project.

First: Town of East Hampton or Village of East Hampton?

This distinction can save you from preparing an application for the wrong government. An East Hampton mailing address does not by itself prove that the Town Building Department is your permit authority.

Property jurisdiction Building office Where to start
Town of East Hampton jurisdiction Town of East Hampton Building Department Use the Town’s OpenGov digital permitting system.
Inside incorporated Village of East Hampton Village of East Hampton Building Department Use the Village’s building requirements rather than the Town permit application.

The Town Building Department serves Town jurisdiction that includes communities such as East Hampton, Springs, Amagansett, Montauk and Wainscott, subject to municipal boundaries and any incorporated-village jurisdiction.

Do not skip the jurisdiction check. The Village of East Hampton maintains a separate Building Department at 88 Newtown Lane, East Hampton, with a published phone number of 631-324-4150. Its permit documents and fee structure are different from the Town’s.

If you are unsure, give the property address to the appropriate office before paying for plans or submitting a permit application.

East Hampton Town Building Department Contact & 2026 Hours

The Town posted an office-hours update effective October 26, 2026.

Department Town of East Hampton Building Department
Current address 300 Pantigo Place, Suite 110, East Hampton, NY 11937
Phone 631-324-4145
Office / counter drop-off hours Monday-Friday, 8:30 a.m.-3:30 p.m.
Licensed contractors — inspector counter Monday-Friday, 8:30 a.m.-9:00 a.m.
General public — inspector counter Monday-Friday, 9:00 a.m.-10:30 a.m.
Building inspector phone period The department currently lists inspector counter/phone availability during the morning period; call 631-324-4145 before making a special trip.

Some older Town PDF forms still show Suite 104. The current Building Department webpage lists Suite 110, so use the current department page when visiting or mailing something.

How to Apply for an East Hampton Building Permit Online

The Town says Building Department applications are now submitted digitally through OpenGov. Counter payment is not accepted, so the online process is important even if you plan to visit the office for a question.

  1. Confirm the permit jurisdiction. Make sure the parcel is under the Town of East Hampton rather than the Village or another municipality.
  2. Open the official portal. Go directly to the Town of East Hampton OpenGov portal.
  3. Create an OpenGov account. Choose Sign Up, then use the secure-portal registration option. The Town’s current account instructions say the password must contain at least eight characters, including an uppercase letter, lowercase letter and digit.
  4. Complete your profile. After logging in, open My Account → Profile and enter your name, phone number and address. The saved profile can be reused for later Town OpenGov applications.
  5. Select the Building Department application you need. The Town currently accepts online applications including building permits, rental registration, rental tenant updates, updated Certificates of Occupancy and Letters of Buildability.
  6. Upload the project documents. Your exact checklist depends on the work. Surveys, plans, insurance, construction-cost information and outside approvals may be required.
  7. Submit the application and watch the portal. OpenGov sends notices to the email attached to your profile when payment is due, a permit is issued, or a reviewer leaves a comment.
  8. Reply inside OpenGov. The Town specifically instructs applicants to answer reviewer comments through the comment boxes in the application rather than replying to the automatic notification email.
  9. Pay the assessed fee online. The Town currently states that counter payments are not accepted.
  10. Wait for the actual permit before starting regulated work. The Town’s building-permit instructions state that work covered by the application cannot begin before the building permit is issued.

You can also read the Town’s official OpenGov account instructions.

What to Prepare Before You Submit

A complete package reduces avoidable back-and-forth. The Town’s published permit application and Building Department FAQ identify several documents commonly required for building work.

Item What the Town may need
Property survey A raised-seal survey showing the parcel, property lines, existing and proposed structures, setbacks, driveways, parking areas, sewage-disposal information and other applicable site details.
Clearing information If the permit includes clearing, the Town states that a licensed surveyor’s staked survey showing the clearing limitations or envelope is required.
Construction plans The posted instructions call for complete residential plans and specifications; commercial applications may require additional plan sets. Current digital-upload requirements should be followed in OpenGov.
Contractor information Applicable licensed contractor details and required insurance documentation.
Workers’ compensation A Workers’ Compensation certificate may be required for a general contractor, with the Town listed as certificate holder as applicable.
Project cost The Building Department asks for the cost of construction because the standard building-permit fee is calculated from estimated construction cost.
Energy compliance Applicable New York State Energy Code documentation and any locally required energy/HERS material for the project.
Other approvals Zoning Board, Architectural Review Board, Planning, Suffolk County Health Services or other agency approvals may be needed depending on location and scope.

Use the official Building Permit Application and Instructions together with the live OpenGov application. Older PDF instructions can contain legacy submission details, so the current portal should control when the two differ.

Projects shown on the Town’s building application

The Town’s application covers work such as new residential or commercial construction, additions, interior alterations, porches, decks, attached or detached garages, accessory structures, sheds, swimming pools, spas/hot tubs and fireplaces. Your project’s exact permit and approval requirements depend on its scope, zoning district and property conditions.

East Hampton Building Permit Fees

The Town’s current Building Department page continues to reference the amended fee schedule adopted through Resolution 2024-1310. The amounts below are useful for budgeting, but always check the assessed amount in OpenGov before paying because project-specific calculations can change.

Permit / service Published Town fee
Standard building permit 0.5% of estimated construction cost, plus a $300 Certificate of Occupancy fee
Certificate of Occupancy $300
Updated Certificate of Occupancy $600
Letter of Buildability $150
Demolition permit $1,000
Gunite swimming pool $1,000
Vinyl swimming pool $500
Tennis, pickle or paddle-ball court $1,000
Other listed sports courts $500
Solar permit / solar storage No Town permit fee listed in the referenced resolution
Geothermal system No Town permit fee listed in the referenced resolution
I/A septic system No Town permit fee listed in the referenced resolution

View the Town’s official fee resolution.

How online payment works

The Building Department currently states that payments are not accepted at the counter. Published online processing charges are:

  • Credit card: 2.99% plus $0.99.
  • E-check: $2.25 flat fee.
Town and Village fees are not interchangeable. The Village of East Hampton’s published fee schedule uses a different construction-permit calculation. Confirm jurisdiction before estimating your permit budget.

What Building Inspections Should You Expect?

The inspection sequence depends on what you are building. East Hampton’s official Building Department FAQ gives the following examples for residential work:

Possible inspection stage When it may occur
Footing / foundation At the required foundation stage, including the applicable waterproofing stage.
Strapping Before work is concealed when required.
Rough plumbing Including the required water test on waste and vents.
Framing The Town’s example places this after roof, siding and windows are installed.
Fireplace / chimney Masonry, prefab fireplaces and wood-stove work can require separate inspection stages.
Insulation Before insulation work is concealed as required.
Pool inspections May include drywell inspection or rebar inspection for a gunite pool.
Final inspection After permitted work is completed and required preliminary inspections/approvals are satisfied.

This is an example sequence, not a universal checklist. Your approved plans and permit record determine which inspections apply.

How to avoid a failed or wasted inspection visit

  • Do not cover work that still needs to be inspected.
  • Keep the issued permit and approved project information available at the site.
  • Make sure the inspector can safely access the work.
  • Complete prerequisite inspections before requesting a later-stage inspection.
  • Resolve reviewer or inspector comments rather than assuming the next inspection closes them automatically.
  • Plan the final inspection early. The Town’s posted permit instructions advise applicants to plan ahead for final inspections.

How to Get Old Permits, COs, Surveys or Property Records

If you are buying a house, selling a property, planning a renovation or trying to legalize old work, existing Building Department records can be as important as a new permit.

The Town provides a Building Department Research Request Form. The form allows requests for items such as:

  • final surveys;
  • surveys showing well and septic locations;
  • property cards / parcel history;
  • Certificates of Occupancy;
  • open building permits;
  • vacant-land buildability information; and
  • plans that can be pulled and emailed when available.

Micro-step: submit a property research request

  1. Open the official research-request PDF.
  2. Enter the Suffolk County Tax Map number if known.
  3. Add the owner’s name and property address.
  4. Check the exact records you want.
  5. Add your contact name, phone number and email.
  6. Email the completed request to buildingdepartment@ehamptonny.gov.

The Town’s request form asks users to allow a minimum of three business days for processing. More complicated or older property files may naturally require additional time.

Useful before buying or renovating: Ask specifically for open permits and existing Certificates of Occupancy. A structure physically present on a property is not automatically proof that it was permitted and properly closed out.

If you are researching another Suffolk County municipality, permitting can be completely different. For example, see our Brookhaven, New York Building Department guide for properties located in the Town of Brookhaven.

Updated Certificate of Occupancy Rules in 2026

This is especially important for East Hampton property sales.

Town Code was amended to require an updated Certificate of Occupancy when ownership changes, subject to specified exceptions. However, the Town placed enforcement of the updated-CO requirement on a temporary stay through December 31, 2026.

The stay does not mean updated CO applications disappeared. The Building Department continues accepting and processing applications. The Town has told sellers to continue applying, and ordinary Certificates of Occupancy are still required for improvements that require one.

According to the Town’s 2026 FAQ, the stay means a person who cannot obtain the updated CO during the pause will not be charged with a violation solely for that updated-CO requirement. Other property violations can still be enforced.

The Town also reported that roughly six out of ten updated-CO applications were requiring additional review because improvements had been made without building permits. That is one reason checking permit and CO history before a closing can save stress later.

If you are selling property in 2026

  1. Request the property’s existing COs and open-permit history early.
  2. Compare those records with structures and improvements actually on the property.
  3. Continue the updated-CO application process where applicable.
  4. If an old deck, pool, addition, finished area or other improvement does not match the records, ask the Building Department what legalization process is required.
  5. Do not withdraw an already-filed updated-CO application merely because the enforcement stay is in effect.

Read the Town’s official 2026 Updated CO FAQ.

Which Building Code Applies in East Hampton in 2026?

Do not rely on old permit PDFs that still refer to older editions of the New York State code.

For permit applications in 2026, New York State has adopted the 2025 Uniform Code and 2025 Energy Conservation Construction Code. The new statewide code framework became fully effective on December 31, 2025.

The statewide framework includes the 2025 New York State residential, building, plumbing, mechanical, fuel gas, fire, property-maintenance and existing-building codes, together with the applicable Energy Code.

Check the New York Department of State’s current code-adoption page for statewide updates.

East Hampton local zoning still matters

State building-code compliance does not replace East Hampton zoning. Your project may also need to comply with setbacks, lot coverage, building coverage, gross floor area, clearing, environmental restrictions and other local requirements.

One important Town change effective July 1, 2025 concerns maximum gross floor area for a single-family residence. The Town’s Building Department notice describes the maximum as 7% of lot area plus 1,500 square feet, or 10,000 square feet, whichever is less, subject to the complete zoning provisions and definitions applicable to the parcel.

For projects involving flood-hazard areas, wetlands, sanitary systems, significant clearing or other sensitive conditions, additional Planning, Suffolk County, state or environmental approvals may be required before or alongside the building permit.

A Practical East Hampton Permit Checklist

If you want the shortest path from idea to legal construction, use this order:

  1. Confirm Town vs. Village jurisdiction.
  2. Check existing permits and COs if the project affects an older property.
  3. Confirm zoning feasibility before spending heavily on final construction drawings.
  4. Prepare the survey and professional plans required for your project.
  5. Collect contractor insurance and licensing information.
  6. Obtain outside approvals if Health, Planning, ZBA, ARB or another agency is involved.
  7. Create your OpenGov account.
  8. Submit the complete application digitally.
  9. Monitor OpenGov comments and answer reviewer requests inside the application.
  10. Pay the assessed fee online.
  11. Do not start permit-required work before issuance.
  12. Complete inspections in the correct sequence.
  13. Request final inspection and close the permit.
  14. Keep the final CO/compliance record with your permanent property documents.
Best time-saving move: If the property is older or you recently bought it, check the Building Department file before finalizing a major design. Discovering an unclosed permit or undocumented improvement after plans are complete can change the project.

East Hampton Building Department FAQs

1. Is the Town of East Hampton Building Department the same as the Village Building Department?

No. The Town and incorporated Village have separate Building Departments. Confirm the property’s actual municipal jurisdiction before submitting an application.

2. Can I apply for an East Hampton Town building permit online?

Yes. The Town requires Building Department applications to be submitted digitally through its OpenGov portal. Create an OpenGov account first, complete your profile, choose the correct application and upload the required documents.

3. Where is the East Hampton Town Building Department?

The current official Building Department page lists 300 Pantigo Place, Suite 110, East Hampton, NY 11937. The phone number is 631-324-4145.

4. How much is an East Hampton Town building permit?

The Town’s referenced fee resolution calculates the standard building-permit fee at 0.5% of estimated construction cost, with an additional $300 Certificate of Occupancy fee. Special projects such as demolition and pools have separate published fees.

5. What documents do I need for a building permit?

Requirements depend on the project, but commonly include a completed application, survey, construction plans, contractor information, applicable insurance, construction-cost documentation, energy-code material and any required approvals from other agencies or boards.

6. How do I schedule or prepare for an East Hampton building inspection?

Follow the inspection requirements attached to the permit and the instructions provided through OpenGov or the Building Department. Do not conceal work before a required inspection, and make the approved project information available to the inspector.

7. Can construction begin while my permit application is being reviewed?

Not for work that requires the building permit. The Town’s permit instructions state that work covered by the application cannot begin before the permit is issued.

8. How do I get an old Certificate of Occupancy or open-permit record?

Use the Town’s Building Department Research Request Form. It can be used to request COs, open permits, property history, surveys and certain plans. The form directs applicants to email it to buildingdepartment@ehamptonny.gov and asks for at least three business days for processing.

9. Do I still need an updated Certificate of Occupancy when selling in 2026?

The Town has paused enforcement of the updated-CO requirement through December 31, 2026, but it continues processing applications and advises sellers to continue applying. The stay does not eliminate ordinary CO requirements or other property violations.

10. What building code applies to an East Hampton permit in 2026?

New permit applications are subject to the applicable 2025 New York State Uniform Code and 2025 Energy Conservation Construction Code, effective December 31, 2025, together with East Hampton Town zoning and other applicable local requirements.

Before You Submit

For most East Hampton Town projects, the practical path is: confirm jurisdiction → check property history → verify zoning → prepare plans and survey → submit through OpenGov → respond to review comments → pay online → receive the permit → complete inspections → close the project with the required certificate.

Permit procedures, office hours and local rules can change. Use the official East Hampton Town Building Department page and your OpenGov application for the final project-specific instruction.

USBuilding.org is an independent informational resource and is not the Town or Village of East Hampton. Applications, payments, inspections and official determinations must be completed through the responsible government agency.

Leave a Comment