Fargo, North Dakota Building Department 2026: Permits, Inspections & Services

Fargo Building Permits, Inspections and City Services: Start Here

If you searched for the Fargo North Dakota Building Department, the city office you normally need is the City of Fargo Inspections Department. It handles building-code enforcement, building permits, plan review, construction inspections and related mechanical, plumbing, electrical and property-code functions inside Fargo.

Quick answer: Fargo’s Inspections Department is located at 225 4th Street North, Fargo, ND 58102. The main phone number is 701-241-1561, and normal office hours are Monday through Friday, 7:45 a.m. to 4:30 p.m., excluding legal holidays. Most applicants can use Fargo’s official online permit system to apply, search records, monitor an application, pay fees and work with inspections.

Open Fargo Permit Portal Official Inspections Department

Fargo Inspections Department Contact Information

Official office:
City of Fargo Inspections Department

Address:
225 4th Street North
Fargo, ND 58102

Phone:
701-241-1561

Hours:
Monday-Friday
7:45 a.m.-4:30 p.m.

Permit portal:
permits.fargond.gov

Department page:
City of Fargo Inspections

The department recommends contacting staff before starting a project when the permit requirement is unclear. This is especially useful for additions, changes of use, unusual accessory structures, commercial work or projects where zoning may affect what can be built.

Do You Need a Building Permit in Fargo?

Fargo says permits are generally required for new construction, additions, remodeling, structural alterations, mechanical work, electrical work and plumbing work. The city specifically identifies projects involving Sheetrock, siding, stairs or steps, and decks as work that requires a permit.

Some basic finish work does not normally require a building permit. Fargo lists examples such as painting, installing cabinets, replacing or covering shingles, and ordinary flat patio work made from brick, paving stone or concrete when no structure will be built on it.

Project Typical Fargo permit direction
New home or commercial buildingBuilding permit and plan review required.
Home additionUse the Addition application in the permit portal.
Interior remodelA permit is generally required when the work falls within Fargo’s remodeling requirements.
Deck or raised patioUse the Deck application.
Detached garageUse the Detached Garage application. An attached garage is handled as an addition.
ShedThe portal has a separate Shed application.
FenceA Fence application is available; confirm your project’s exact requirements before construction.
Retaining wallThe portal specifically identifies retaining walls over 4 feet measured from the bottom of the footing to the top of the wall.
HVAC or mechanical workMechanical permit may be required.
PlumbingUse the plumbing permit process when applicable.
Water heaterThe city lists a water-heater permit for new installation, replacement or significant alteration of a gas water heater.
DemolitionUse the Demolition application before removing a regulated structure.
Solar systemThe portal has a Solar Energy System permit application.
Change of use or occupancyUse the Change of Use application; additional reviews may apply.

Important: Do not assume that a small project is automatically exempt. The safest approach is to describe the exact work to Inspections before construction begins if you are unsure.

How to Apply for a Fargo Building Permit Online

Fargo’s One Stop permit system is more useful than a simple application form. It can be used to submit applications, monitor progress, pay permit fees, search city permit records and access permit documents.

  1. Open the official Fargo permit portal.
    Go directly to permits.fargond.gov. Use the City portal rather than a third-party permit service.
  2. Select “Apply.”
    Fargo separates applications by structure permits, accessory permits, trade permits, fire protection, engineering, signs, zoning and other services.
  3. Choose the project that actually matches your work.
    For example, select New Building for a new principal structure, Addition for an attached expansion, Detached Garage for a separate garage, or Remodel/Renovation for qualifying interior work.
  4. Create or sign in to your portal account.
    Enter accurate owner, contractor and contact information because city staff may use the email address or phone number to request corrections or additional documents.
  5. Enter the project address and description.
    Describe the full scope of work instead of using a vague description such as “remodel.” Include the important structural or trade work involved.
  6. Upload plans and supporting documents.
    Small residential work may only need simple dimensioned drawings, while larger residential and commercial projects can require detailed plans, specifications and professional design documents.
  7. Submit the application and watch for email.
    Fargo says the application is reviewed after submission. Staff may contact you if information is incomplete or clarification is needed.
  8. Pay only after the permit is ready for issuance.
    An approved but unpaid permit is not considered issued. Do not begin regulated work until the required permit has actually been issued.

For official portal instructions, payment information and account help, use the City’s One Stop help page.

What to prepare before applying

  • Project street address.
  • Owner and applicant contact information.
  • A clear description of the entire project.
  • Plans or drawings with dimensions.
  • Estimated project value.
  • Contractor information when contractors are involved.
  • Trade information for electrical, mechanical or plumbing work when applicable.
  • Site-plan or zoning information when location, setbacks, parking or land use matters.

You do not need to call the office just to see whether a permit exists. Fargo’s permit system provides public permit and licensing searches.

  1. Open the Fargo permit portal.
  2. Use the search field or Advanced Search when available.
  3. For an address search, Fargo instructs users to enter the street address only without the city, state or ZIP code.
  4. You can also search by contractor name, license holder, reference code, or permit/license/case number.
  5. Open the matching record to review available permit information, status and inspection history.

The City’s Open Data dashboard also provides reports such as recent building permits and open commercial plan reviews. This can be useful when checking current project status or researching permit activity at a property.

Fargo Building Inspections: Scheduling and What to Expect

Work performed under a permit is subject to inspection. Fargo allows inspection-related activity through its official permit system, and the Inspections Department can also help at 701-241-1561.

Simple inspection workflow

  1. Make sure the permit has been issued. Approval alone is not the same as issuance if required fees remain unpaid.
  2. Finish only the stage of work that must be inspected. Do not cover framing, wiring or other regulated work before the required inspection.
  3. Open the permit portal. Use the inspection function associated with the permit or contact Inspections if the required inspection is unclear.
  4. Provide access. The City states that access must be provided for inspection purposes.
  5. Check the result. Permit records can show inspection history and whether an inspection passed, failed or remains unscheduled.
  6. Correct failed items before proceeding. A failed inspection can require corrections and a reinspection.

Fargo’s permit records show that projects may involve inspections such as footing, foundation, framing, energy/insulation, electrical, plumbing, mechanical and final building inspections. The exact sequence depends on the project.

Do not cover work too early. If an inspector needs to see concealed framing, wiring, plumbing or similar work, covering it before inspection can create delays and extra work.

Fargo Residential Building Permit Fees for 2026

The residential building fee schedule for one- and two-family dwellings is effective January 1, 2026. Fargo bases the main building permit fee on total project valuation.

Total valuation 2026 residential building permit fee
Up to and including $1,000 $50
$1,001-$100,000 $50 for the first $1,000 plus $5.56 for each additional $1,000, or fraction thereof.
$100,001 and above $600.44 for the first $100,000 plus $3.06 for each additional $1,000, or fraction thereof.

Other residential fees listed for 2026

Item Fee
Demolition permit$100; $50 for buildings under 400 sq. ft. and buildings without utility services.
House moving permit$300; reduced amounts apply in certain situations listed by the City.
Board of Appeals$150
Inspection outside normal business hours$75 per hour, with a two-hour minimum, or the jurisdiction’s total hourly cost if greater.
Reinspection$75 per hour, or the jurisdiction’s total hourly cost if greater.
Inspection without another specified fee$75 per hour, one-half-hour minimum, or actual jurisdiction hourly cost if greater.
Additional plan review caused by plan changes or revisions$75 per hour, one-half-hour minimum, or actual jurisdiction hourly cost if greater.
Outside consultant plan checking/inspectionActual cost, including administrative and overhead cost.

You can also use Fargo’s official residential permit fee page and calculator.

Starting work before a required permit can cost more

The 2026 residential schedule includes additional fees when required work begins before permit issuance:

Work valuation Additional fee rule
$0-$50,000Permit fee is doubled. The schedule also lists increased consequences for repeat violations.
$50,001-$500,00050% of permit fee, with a $550 minimum.
Over $500,00025% of permit fee, with a $2,000 minimum.

Commercial Building Permits and Plan Review

Commercial work can involve more departments than an ordinary residential project. Fargo’s commercial review process can include Inspections, Planning and Development, Engineering, Fire and Fargo Cass Public Health.

The normal workflow is:

  1. Optional pre-application discussion when the project needs early guidance.
  2. Project submittal to Inspections.
  3. Technical review by the relevant City departments.
  4. Review comments returned to the applicant.
  5. Applicant revises plans when required.
  6. City reviews the resubmittal.
  7. Building permit is requested after required approvals.

Fargo’s commercial page says building and parking-lot valuations must be separated. The Building Official makes the final valuation determination, and the City uses current ICC building valuation data with a local adjustment as guidance.

2026 commercial permit fee schedule

Valuation Commercial building permit fee
Up to $1,000$55
$1,001-$25,000$55 for the first $1,000 plus $12.75 per additional $1,000 or fraction.
$25,001-$50,000$361 for the first $25,000 plus $8.70 per additional $1,000 or fraction.
$50,001-$100,000$578.75 for the first $50,000 plus $6.14 per additional $1,000 or fraction.
$100,001-$500,000$885.75 for the first $100,000 plus $4.99 per additional $1,000 or fraction.
$500,001-$1,000,000$2,881.75 for the first $500,000 plus $4.87 per additional $1,000 or fraction.
$1,000,001 and above$5,316.75 for the first $1 million plus $4.64 per additional $1,000 or fraction.

When plan review is required, the 2026 schedule lists the plan-review fee as 20% of the attributable building permit fee, with a $50 minimum.

View the official commercial permit and fee page.

Commercial plan-submittal note: Fargo’s main Inspections page says new commercial building plans must still be submitted on paper even when plans have also been submitted digitally. A separate current plan-requirements page describes either one complete digital set or a wet-stamped original set plus a digital set. Because those instructions are not perfectly identical, confirm the required format with Inspections at 701-241-1561 before printing a large plan package.

Official detailed requirements are available on Fargo’s commercial plan submittal requirements page.

Permit Payments and Online Convenience Fee

Fargo’s permit portal says applicants can pay online with Visa, MasterCard or Discover. Check or money order can also be used in person. The City’s online help page states that cash is not accepted.

A 2.99% convenience fee is added to credit-card payments. Once the application is approved and required fees are paid, the permit document can be downloaded from the completed payment page or later through the applicant’s “Your Items” area.

The City’s portal also states that an approved permit that has not been paid is not issued. Regulated work should not begin until the permit has been issued.

Which Building Codes Does Fargo Use in 2026?

Fargo’s current-codes page states that the 2024 International Codes have been in effect in Fargo since July 2, 2025. The City lists local amendments to several code families, so applicants should not rely on an unamended model-code book alone.

Code area Current Fargo reference
Building2024 International Building Code with Fargo amendments
Residential2024 International Residential Code with Fargo amendments
Mechanical2024 International Mechanical Code with local amendments
Fuel gas2024 International Fuel Gas Code with local amendments
Existing buildings2024 International Existing Building Code with local amendments
Energy2024 International Energy Conservation Code with local amendments
Property maintenance2024 International Property Maintenance Code with local amendments
Electrical2023 National Electrical Code; Fargo identifies July 1, 2024 as its effective date.
Plumbing2018 North Dakota State Plumbing Code / Uniform Plumbing Code reference listed by Fargo.

Use the City’s current building codes page for Fargo amendments and the latest adopted-code links.

North Dakota also maintains a statewide building-code program. The state says the 2024 editions forming the updated North Dakota State Building Code took effect January 1, 2026. Fargo’s local amendments and enforcement procedures still matter for projects inside Fargo.

Contractors, Licensing and Homeowner Electrical Work

If a contractor is doing the work, ask who is responsible for pulling the permit before work begins. Fargo recommends checking contractor licensing rather than assuming a contractor is properly registered.

North Dakota’s Secretary of State says a contractor performing a job exceeding $4,000 generally must hold a North Dakota contractor license. You can verify a contractor through the official North Dakota contractor search.

Can a Fargo homeowner do their own electrical work?

Fargo allows a limited electrical self-wire process. The City says you may perform your own wiring only when you own and occupy the single-family home. The self-wire option does not apply to rental property, mobile homes, day-care properties or homes used for other businesses.

The homeowner must submit the electrical self-wire application and a schematic showing information such as circuitry, wire size and overcurrent protection. Fargo identifies both rough-in and final electrical inspections as required stages for this type of work.

Review Fargo’s official electrical self-wire requirements before doing the work.

Forms, Handouts and Project-Specific Requirements

Fargo publishes project documents that can answer details that do not fit into a general building-permit application. The City’s forms library includes resources for:

  • Residential permit applications
  • Commercial building permit applications
  • Detached garages and sheds
  • Patio decks
  • Residential fences
  • Egress windows
  • Single-family construction
  • Electrical self-wire work
  • Mechanical permits
  • Accessibility requirements
  • Floodproof construction
  • Signs
  • Special inspections
  • Rental and code-enforcement fees

Before drawing plans from memory or using a generic internet diagram, check the official Fargo Forms & Publications page. A Fargo-specific handout can contain requirements that a generic construction guide misses.

Common Mistakes That Can Delay a Fargo Permit

  • Using the wrong permit type. A detached garage, addition, remodel, deck and new building are separate applications in the Fargo portal.
  • Submitting an incomplete project description. Explain the full work, not just one portion of it.
  • Leaving dimensions off plans. Even a simple residential sketch should clearly show measurements.
  • Starting before issuance. Fargo’s fee schedules contain additional charges for work started before a required permit is issued.
  • Covering work before inspection. Hidden work may need to be reopened if the required inspection was skipped.
  • Ignoring trade permits. Building approval does not automatically replace electrical, mechanical or plumbing requirements.
  • Assuming contractor licensing equals a city permit. Contractor licensing and project permitting are separate requirements.
  • Using an outdated code edition. Fargo is now working with its adopted 2024 International Codes and local amendments.
Related regional guide: Contractors and property owners who also work in Minnesota can compare the process with our Bloomington, Minnesota Building Department guide. Permit portals and inspection rules are local, so never assume Fargo and another city use the same procedure.

Fargo Building Department FAQs

1. What is the phone number for the Fargo Building Department?

The City of Fargo office handling building permits and inspections is the Inspections Department. Its main phone number is 701-241-1561.

2. Where is the Fargo Inspections Department located?

The office is at 225 4th Street North, Fargo, ND 58102, at Fargo City Hall.

3. What are Fargo Inspections Department office hours?

The City lists normal office hours as Monday through Friday, 7:45 a.m. to 4:30 p.m., except legal holidays.

4. Can I apply for a Fargo building permit online?

Yes. Use the official City of Fargo Permitting & Licensing portal at permits.fargond.gov. Applicants can submit many permit types, track applications and handle related permit tasks online.

5. How do I search for an existing Fargo building permit?

Open the official permit portal and use its permit search. Fargo says a basic search can use a street address without the city, state or ZIP code, or you can search by contractor name, reference code or permit/case number.

6. Do I need a permit for remodeling in Fargo?

Fargo generally requires permits for remodeling projects and structural alterations. The City also specifically identifies work involving Sheetrock, siding, stairs or steps, and decks as requiring permits. Ask Inspections when the scope is uncertain.

7. How much is a residential building permit in Fargo in 2026?

For one- and two-family dwellings, the 2026 schedule starts at $50 for projects valued up to $1,000. Higher-value projects use a valuation-based formula. Additional trade, review or inspection fees can also apply.

8. How do I schedule a building inspection in Fargo?

Inspection services are available through Fargo’s official permitting system, and applicants can contact the Inspections Department at 701-241-1561 when they need help identifying or arranging the correct inspection.

9. What building code does Fargo use in 2026?

Fargo states that its adopted 2024 International Codes have been effective since July 2, 2025, together with local amendments. The City also lists the 2023 National Electrical Code and the applicable North Dakota plumbing code among its current references.

10. Can I start construction after my Fargo permit application is approved?

Do not treat approval alone as permission to begin. Fargo’s permit portal states that an approved permit with unpaid required fees is not issued. Pay the required fees, obtain the issued permit and follow any required inspection conditions before beginning regulated work.

Before You Start Your Fargo Project

For most homeowners and contractors, the fastest path is simple: identify the correct permit type, prepare a clear scope and dimensioned plans, apply through Fargo’s official portal, respond promptly to review questions, pay the permit fee after approval, obtain the issued permit, and schedule inspections before work is covered.

If your project is unusual, commercial, structurally complex, or involves several City departments, calling 701-241-1561 before submitting can prevent unnecessary revisions. The official portal should be the final place you use to submit, pay, download the permit and work with live City records.

Permit fees, forms, codes and procedures can change. The 2026 fee information above reflects City of Fargo schedules effective January 1, 2026; verify live status in the official permit system before submitting or paying.

Leave a Comment