Bloomington, Minnesota Building Department 2026: Permits, Inspections & Services

Need a building permit or inspection in Bloomington, Minnesota? The City of Bloomington Building and Inspections Division, part of Community Development, handles construction permits, plan reviews and building inspections within the city’s jurisdiction. Applications are submitted through the City’s online permit portal rather than through paper forms.

Quick answer — Bloomington building permits

Apply through the official Bloomington permit portal. For help with permit requirements, inspections or online registration, call 952-563-8930.

Office hours: Monday–Friday, 8 a.m.–4:30 p.m., Central Time.

Bloomington Building Department Contact Information

Official agencyCity of Bloomington — Building and Inspections Division
DepartmentCommunity Development
Office address1800 West Old Shakopee Road, Bloomington, MN 55431-3027 (Civic Plaza)
Phone952-563-8930
General emailInspections@BloomingtonMN.gov
Plan review emailPlanReview@BloomingtonMN.gov
Office hoursMonday–Friday, 8 a.m.–4:30 p.m.
Planning and zoning952-563-8920
Permit submissionOnline through CityView; contact staff for an authorized alternative if needed
Service jurisdictionCity of Bloomington, Hennepin County, Minnesota

Visit Bloomington’s official Building and Inspections page for current department announcements and registration tutorials. Appointments, counter assistance and holiday availability should be confirmed before visiting.

Which Building Permits Do You Need?

The required permit depends on your construction project. Bloomington administers building and trade permits, but zoning, engineering or fire approvals may also apply.

ProjectPermit guidance
Home additions and structural remodelingTypically require a building permit, construction plans and applicable inspections.
Deck constructionA building permit is required for an attached deck or a detached deck more than 30 inches above grade.
Roof replacementA residential roofing/siding permit is required when replacing more than one roofing square (100 square feet).
Siding replacementA residential roofing/siding permit is generally required. House-wrap and electrical inspections may also apply.
Electrical workWork such as service changes, rewiring and new circuits generally requires an electrical permit, subject to applicable exemptions.
Furnace, AC and mechanical workMechanical/HVAC permits may be required. Electrical reconnects can require a separate electrical permit.
Water heaters and plumbing changesPlumbing permits may be required; electrical work associated with equipment may need a separate permit.
Driveways and curb openingsDriveway and driveway-approach permits may be required separately.
Swimming pools and hot tubsPool/spa permits apply to qualifying installations, with electrical or plumbing permits where required.
Commercial tenant improvementsBuilding permits, plan reviews, accessibility and fire-related approvals may apply, even when changes are limited.

Projects that may not require a building permit

Bloomington’s published code guidance identifies several exemptions, including qualifying one-story detached accessory structures of 200 square feet or less, fences not exceeding 7 feet, certain low detached platforms and ordinary finish work such as painting or carpeting.

Important: A building-permit exemption does not automatically exempt the work from zoning setbacks, height restrictions, electrical permits, stormwater requirements or other applicable rules. For a shed, fence or garage, confirm the location and property requirements with Planning at 952-563-8920.

For specific deck, basement, garage, roofing, electrical and other project requirements, the City publishes official construction handouts and downloadable documents.

How to Apply for a Bloomington Building Permit Online

The CityView portal accepts Bloomington building and trade permit applications. Complete the following steps before beginning work that requires a permit.

  1. Open the official portal. Visit permits.bloomingtonmn.gov/prodportal/ and select Apply for a Permit.
  2. Register or sign in. Create an account if you are a first-time applicant. Follow the email-verification instructions. Bloomington advises completing account verification on a desktop rather than a mobile device.
  3. Select the correct permit. Choose the permit category matching your work, such as building, electrical, plumbing or mechanical. Enter the property information requested by the portal.
  4. Complete the project information. Enter the work description, estimated project valuation and applicant or contractor details. Add contractor licensing information where required.
  5. Upload supporting documents. Attach the applicable site plan, floor plans, structural drawings, specifications or other documents required for your project.
  6. Review and submit. Check the application information before submitting. Pay applicable charges when requested by the City. Some building applications submitted without a named contractor require an upfront plan-review payment.
  7. Follow the review process. Sign in to review application status, respond to correction requests and supply revised documents when requested.
  8. Obtain approval and schedule inspections. After the required permit is issued, begin authorized work and request inspections at the appropriate construction stages.
Having trouble registering? Contact Building and Inspections at 952-563-8930 or Inspections@BloomingtonMN.gov. The City generally requires online submission unless staff have arranged an alternative.

Documents to prepare before applying

  • Correct Bloomington property address and project location.
  • Clear description of the proposed work and estimated labor/material cost.
  • Applicant, property-owner and contractor information.
  • Site survey or property layout for projects involving setbacks, decks or additions.
  • Relevant drawings showing dimensions, structural details and construction materials.
  • Equipment specifications or electrical, plumbing and mechanical details when required.
  • Any necessary zoning, engineering, fire or other agency approvals.

Requirements vary by project. Use the City’s residential and commercial handouts to identify the required drawings and installation standards before uploading your application.

Bloomington Building Permit Fees in 2026

Bloomington uses a combination of flat fees, minimum fees and valuation-based charges. The final amount can include state surcharges, plan-review costs and payment-processing fees.

The following are city-published fee examples. Confirm the current amount with the permit portal or Building and Inspections before paying, since fee schedules can change during 2026.

Permit or servicePublished fee guidance
Residential roofing$100 flat permit fee
Residential siding$150 flat permit fee
Combined residential roofing and siding$250 flat permit fee
Residential electrical minimum$65; applicable surcharge additional
Residential HVAC minimum$65 plus state surcharge
Residential plumbing minimum$65 plus state surcharge
Commercial HVAC or plumbing minimum$75 plus state surcharge
Decks and general building workBased on calculated construction valuation and applicable review charges
City-conducted Time-of-Sale inspection$250

For HVAC, the City’s published base calculation is 1.5% of job valuation, and for plumbing it is 2%, subject to minimums and applicable additional charges. Building permits commonly use a valuation-based schedule rather than one universal price.

How to check your fee: Open the official fee information page, choose the relevant permit category and review its fee schedule. Where the portal offers Estimate Fees, use it with your project details. For the City’s broader 2026 schedules, see Bloomington’s official fee schedules.

Electronic payments may incur a separate processing charge. Permit applicants should review the full total before confirming payment.

How to Schedule Building Inspections

Inspections confirm that construction follows approved plans and applicable codes. Depending on the job, Bloomington may require foundation, framing, rough-in, electrical, plumbing, mechanical, insulation, house-wrap or final inspections.

Inspection scheduling steps

  1. Open the CityView portal.
  2. Sign in and find the relevant issued permit or available inspection scheduling option.
  3. Select the required inspection category and available appointment options.
  4. Submit the request and review its scheduling status or confirmation.
  5. Have the work ready and accessible. Keep the approved plans available when needed.
  6. Afterward, review the recorded inspection result and resolve any listed corrections before requesting reinspection.

Bloomington’s official solar permitting guidance confirms that inspections can be scheduled through the portal home page. Scheduling options can differ by permit type, so call 952-563-8930 if your inspection is not available online.

Before you cover construction work

Do not conceal framing, wiring, plumbing or other work that requires a rough-in or intermediate inspection before the City has approved that stage.

For siding projects, Bloomington specifically requires a house-wrap inspection before new siding is installed when that inspection applies.

Inspection availability depends on scheduling and project readiness. Do not assume that requesting an inspection guarantees same-day or next-day service.

Check Permit Status and Inspection Results

Bloomington provides public permit information and historical permit-search resources. The appropriate search depends on when the permit was processed.

Permit periodHow to search
January 30, 2017 onwardUse the current CityView system and property-address search. Applications commonly have 13-character numbers beginning with PR.
December 7, 1998–January 29, 2017Use the City’s legacy permit lookup with the seven-digit permit number.
Additional or unavailable recordsContact Building and Inspections or submit an official government data request.

For current records: Open the CityView portal, select Property Search or the permit application search option, and enter the address.

For historical permits: Use the official permit status and inspection results page.

Public records may show permit status and inspection outcomes. Access to certain submitted plans and related documents requires a registered account associated with the permit.

Bloomington Building Codes Applicable in 2026

Bloomington enforces Minnesota’s adopted state building codes. The main building and residential code framework remains based on the 2020 Minnesota State Building Code, but specific code areas have newer effective editions or amendments.

Code area2026 reference
General building and residential construction2020 Minnesota State Building Code framework, as amended
Commercial energy2024 Minnesota Commercial Energy Code, effective January 5, 2024
Residential energy2020 Minnesota Residential Energy Code
Electrical2026 National Electrical Code for permits filed on or after August 17, 2026
Earlier 2026 electrical permits2023 National Electrical Code for permits filed before August 17, 2026
Accessibility and other specialized requirementsApplicable Minnesota codes with effective amendments and supplements

Two notable updates are the 2025 additions concerning adult changing stations and window-cleaning safety features. Their applicability depends on project type and code requirements.

For authoritative code references, consult the Minnesota State Building Codes and Minnesota Electrical Codes and Standards pages.

Special Requirements for Bloomington Projects

Homeowners and contractor licensing

Bloomington allows qualifying owner-occupants to apply for permits for work on their own homesteaded homes. Taking out an owner-builder permit means accepting responsibility for project supervision, compliance and required inspections.

Most residential building contractors, remodelers and roofers must meet Minnesota’s applicable licensing requirements. Mechanical, HVAC and gas-related trade contractors may also need Bloomington-issued licensing.

Verify contractor credentials using the City’s contractor guidance and its links to Minnesota’s official licensing records.

Opening or remodeling a commercial space

Bloomington generally requires a building permit for a new business tenant moving into a new or vacant commercial space, even when no major construction is planned. This supports the City’s certificate-of-occupancy review.

Commercial applicants should prepare a dimensioned floor plan, exits, room uses, restroom layout, sprinkler information and relevant storage details. Certain structural, occupancy-use or exit changes require professional design involvement.

A Metropolitan Council Sewer Availability Charge (SAC) determination may also be required. The City’s published business guidance lists a separate City SAC charge of $2,026 per unit, in addition to applicable Metropolitan Council charges; confirm the current amount before budgeting.

Practical advice: Call Building and Inspections before signing a lease for a new commercial use, especially when changing from one type of business to another.

Reference: Bloomington’s official New Business Requirements.

Time-of-Sale inspections

Bloomington has a separate Time-of-Sale (TOS) housing inspection program. An inspection is generally required before a dwelling is listed for sale or transferred to another owner, subject to the City’s listed exemptions.

Owners can arrange an inspection through the Building and Inspections Division or an authorized independent evaluator. The City-published fee for an inspection conducted by City staff is $250.

Hazardous conditions identified during the evaluation must be addressed under program requirements. A TOS evaluation is not a substitute for a comprehensive buyer’s home inspection.

See the official Time-of-Sale inspection program for scheduling, exemptions and compliance requirements.

Permit expiration and extensions

Bloomington’s published FAQ explains that most permits expire 180 days after issuance, with the period generally restarting after an inspection. Exterior roofing and siding permits have a one-year expiration period.

If a project needs additional time, request approval from the building official before the permit expires. The City provides an online form for permit extensions, cancellations and refunds.

Construction hours

Bloomington’s published general construction-hour guidance allows work from 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 9 p.m. on Saturdays. Do not assume the same hours apply on Sundays, holidays or to noise-exception situations. Confirm any special requirements with the City.

Official Bloomington Permit Resources

Use these government resources for the tasks most frequently needed by homeowners, contractors and property owners.

Frequently Asked Questions

1. Where can I apply for a Bloomington, MN building permit?

Apply through the City’s official CityView portal at permits.bloomingtonmn.gov/prodportal/. Register for an account, choose the appropriate permit, provide project information and submit the required documents.

2. Do I need a permit for remodeling work in Bloomington?

Structural remodeling, additions, electrical changes, plumbing alterations and mechanical work commonly require permits. Ordinary finish work, such as painting or carpeting, may be exempt. Confirm requirements for your particular project before starting.

3. Does a small shed or fence require a building permit?

A qualifying one-story detached storage shed of 200 square feet or less and a fence no higher than 7 feet may be exempt from a building permit. Zoning, setbacks and other restrictions still apply, so confirm the location with Bloomington Planning.

4. How much does a residential roofing permit cost?

Bloomington’s published fee information lists $100 for residential roofing, $150 for siding and $250 for combined roofing and siding. Check the current fee schedule and applicable charges before submitting payment.

5. Can Bloomington homeowners apply for their own permits?

Yes. Qualifying homeowners living in their homesteaded property may apply for permits for their own work. An owner-builder accepts responsibility for code compliance, supervision and inspections. Other properties or situations may require licensed contractors.

6. How do I schedule a building inspection in Bloomington?

Use the official CityView portal to access inspection scheduling for an issued permit, where available. Select the required inspection and submit your request. For scheduling assistance, contact Building and Inspections at 952-563-8930.

7. Can I check an existing Bloomington permit online?

Yes. Use the CityView property or permit search for current records. Permits processed since January 30, 2017, use the newer system; older permits from December 7, 1998, through January 29, 2017, can be searched using the City’s legacy lookup with a seven-digit permit number.

8. How long is a Bloomington building permit valid?

Most permits generally expire after 180 days, with the period extended following an inspection. Exterior roofing and siding permits generally expire after one year. Extensions require building official approval.

9. Which building codes apply in Bloomington in 2026?

Bloomington follows Minnesota’s state building-code framework, including the 2020 building and residential codes with applicable amendments. The 2024 Minnesota Commercial Energy Code applies, and electrical permits filed on or after August 17, 2026, are subject to the 2026 National Electrical Code.

10. Is a Time-of-Sale inspection required before selling a Bloomington home?

Generally, yes. Bloomington requires a Time-of-Sale inspection before listing or transferring a qualifying dwelling, subject to specified exemptions. A City-conducted inspection has a published fee of $250. Call 952-563-8930 for scheduling and exemption guidance.

Need help with a Bloomington permit?

Contact the City of Bloomington Building and Inspections Division at 952-563-8930, email Inspections@BloomingtonMN.gov, or visit the official department website.

Information reviewed: October 9, 2026. Government fees, procedures, office schedules and adopted requirements may change. USBuilding.org is an independent informational resource and is not affiliated with the City of Bloomington or any government agency. The City’s official requirements control.

Leave a Comment