Bloomfield Township Building Permits and Inspections
The Bloomfield Twp Building Department, officially the Building Division of Bloomfield Township in Oakland County, Michigan, handles residential and commercial building permits, construction plan reviews, inspections, and building-code compliance.
To apply for a permit, use the Township’s official permit instructions and application forms. To schedule an inspection, sign in to BS&A Online with an account linked to your permit. For assistance, call 248-433-7715.
Applying for a permit? Identify the permit type, prepare the required plans, and submit the application through an authorized Township channel.
Scheduling an inspection? Open your linked permit in BS&A Online and choose the inspection scheduling option.
Service area: Bloomfield Township, Oakland County, Michigan. Do not confuse this jurisdiction with Bloomfield Township in Missaukee County, Michigan, or Bloomfield Township, New Jersey.
Building Division Address, Phone and Hours
| Department | Bloomfield Township Building Division |
|---|---|
| Jurisdiction | Bloomfield Township, Oakland County, Michigan |
| Office address | 4200 Telegraph Road, Bloomfield Hills, MI 48303-0489 |
| Mailing address | Bloomfield Township Hall, c/o Building Division, P.O. Box 489, Bloomfield Hills, MI 48303-0489 |
| Phone | 248-433-7715 |
| building_dept@bloomfieldtwpmi.gov | |
| Office hours | Monday–Thursday, 7:00 AM–5:30 PM Eastern Time, excluding applicable closures |
| Planning & zoning | 248-433-7795 |
| Official website | Planning, Building & Ordinances Department |
The department is located on the lower level of Bloomfield Township Hall. If you plan to visit, confirm office availability and bring your project address, application documents, and any existing permit number.
What Projects Need Building Permits?
Bloomfield Township requires permits for many construction, renovation, demolition, and installation projects. Depending on the work, building, electrical, mechanical, plumbing, zoning, or other approvals may apply.
| Project | What to check |
|---|---|
| New homes and commercial buildings | Building permit, plan review, zoning compliance and required trade permits |
| Home additions and structural remodeling | Building permit and any relevant electrical, plumbing or mechanical permits |
| Kitchen and basement renovations | Building approval for regulated alterations and separate trade permits where applicable |
| Decks, sheds, fences and pools | Building or ordinance permits depending on the structure and project details |
| Roofing, siding and window replacement | Township permit requirements; certain minor home projects qualify for online applications |
| Furnaces, air conditioning and generators | Mechanical, electrical and possible location or screening approvals |
| Plumbing and electrical work | Applicable plumbing or electrical permits |
| New or enlarged driveways | Building permit and any applicable site or drainage approvals |
| Demolition | Demolition permit, utility disconnection requirements and supporting documents |
Common exception: The Township states that walkways and patios built on grade do not require a building permit. However, other zoning, drainage, association or site requirements may still apply.
For a shed, fence, pool, generator or accessory structure, confirm the exact permit requirements before purchasing materials or hiring a contractor.
How to Apply for a Bloomfield Township Building Permit
Applications are accepted in person or by mail. Online applications are also available for eligible minor residential projects and certain trade permits.
Step 1: Download the Correct Application
Open the official Building Division forms page and locate the project-specific application or complete permit packet.
Available categories include:
- Residential new construction
- Residential additions and alterations
- Residential and commercial demolition
- Commercial construction and alterations
- Decks and driveways
- Electrical, mechanical and plumbing work
- Generator installations
- Fences and ordinance-regulated structures
- Soil filling, removal and other site work
Choose the complete packet when one exists. It may contain required drawings, inspection lists, fee schedules and additional application forms.
Step 2: Prepare the Required Documents
The exact checklist depends on your project. Common requirements include:
- Completed permit application
- Property address and relevant parcel details
- Owner and contractor contact information
- Clear description of the proposed work
- Site plan or surveyed plot plan
- Foundation plans, floor plans and elevations when applicable
- Construction details and material specifications
- Contractor license information when applicable
- Subdivision or homeowners association comments when required
- Additional zoning or agency approvals where necessary
The Township’s published paper-submission guidance calls for three plan sets for residential projects and five for commercial projects. Confirm whether electronic submission is accepted for your particular application before printing multiple sets.
Residential plans involving 3,500 square feet or more of livable space may require a Michigan-licensed architect’s or engineer’s signature and seal under the Township’s stated requirements. Commercial building plans generally require professional signing and sealing.
Step 3: Check Zoning and Other Approvals
Before submitting, confirm building setbacks, lot coverage, property restrictions and whether the proposed structure is permitted at your location.
Projects may also require approval relating to soil erosion, septic systems, wells, driveway culverts, drainage or other site conditions. Bloomfield Township identifies Oakland County agencies as potential reviewing authorities for some of these matters.
For zoning questions, contact the Planning Division at 248-433-7795.
Step 4: Submit Your Application
In person or by mail: Send the completed application, required plans and application payment to:
Bloomfield Township Hall
Building Division
4200 Telegraph Road
Bloomfield Hills, MI 48303-0489
Checks must be payable to Bloomfield Township. The Township also identifies money orders and available online payment options.
Online: Certain minor residential projects and electrical, mechanical and plumbing permits may be submitted through BS&A Online.
Step 5: Pay the Fees and Complete Plan Review
Application fees are due with submission. Missing payment can cause an application to be considered incomplete.
The Building Division reviews the documents and may request missing information, revised drawings or other approvals.
Do not begin permit-required construction before the permit is issued.
How to Use the Online Permit Portal
For an eligible online application, follow these steps:
- Open BS&A: Visit Bloomfield Township’s BS&A portal.
- Confirm your municipality: Make sure it shows Bloomfield Township in Oakland County, Michigan.
- Sign in: Create an account if necessary, or sign in with your existing credentials.
- Select the service: Open the available Building Department service or permit application option for your project.
- Complete the application: Provide the property, applicant, contractor and proposed-work information requested.
- Attach documents: Upload required drawings, site plans or supporting documents.
- Submit: Review the information, complete the submission and retain your confirmation.
For qualifying minor residential online projects, the Township requires proposed plans. Exterior changes also require a site plan, plus association comments where applicable. Drawings must remain readable when printed on 11-by-17-inch paper.
The Township’s official forms page also provides a contractor guide explaining the BS&A application process.
Bloomfield Township Building Permit Fees
Permit fees vary according to construction type, project size, plan review, trade work and additional agency approvals.
The figures below are published Township reference amounts. Building permit charges appear in a schedule effective July 1, 2021; they have not been independently confirmed as unchanged for every application in 2026. Obtain a current fee calculation before payment.
| Fee category | Published amount |
|---|---|
| Residential new construction, additions or alterations | $0.90 per square foot |
| Commercial new construction, additions or alterations | $0.75 per square foot |
| Accessory buildings, pools and decks | $0.40 per square foot |
| Minimum building permit fee | $120 |
| Residential demolition | $300 |
| Commercial demolition | $500 |
| Paving or driveway permit | $120 |
| Residential building application fee | $250 |
| Commercial building application fee | $500 |
| Residential or commercial building plan review | $0.15 per square foot |
| Minor-project plan review | $30 |
| Reinspection | $75 |
Other charges may include electrical, mechanical and plumbing permits, Fire Department reviews, site grading, revisions or outside consultant reviews.
For trade permits, published schedules also identify application fees, base fees and individual inspection or equipment charges. These amounts are separate from the main building permit fee where applicable.
Official fee references: Plan Review Fees and Building Division Fee Schedules.
How to Confirm Your Total Permit Cost
- Identify the property address and exact project type.
- Determine the proposed construction square footage, where relevant.
- Identify separate electrical, plumbing or mechanical work.
- Contact 248-433-7715 and request the current fee calculation.
- Ask whether additional plan-review, zoning, engineering or inspection charges apply.
For online Township payments, a valid receipt number may be required before paying. Obtain that number from the Building Division rather than submitting a payment without an associated application.
How Long Does Building Permit Approval Take?
Bloomfield Township’s official permit page reports that plan review is taking approximately 10 business days. Its published guidance also recommends allowing up to two weeks for typical building plan review.
Commercial projects may require approximately two additional weeks because relevant trades and the Fire Marshal may also review the plans.
These are estimates, not guaranteed issuance dates. Incomplete applications, corrections, zoning issues or additional agency approvals can increase processing time.
Bloomfield Township Building Inspections
Inspections are required for permitted work. The Township uses BS&A Online for inspection scheduling, and your account must be linked to the relevant permits.
How to Schedule an Inspection
- Open the website: Go to www.bsaonline.com.
- Sign in or register: If you do not have an account, select the registration option. Call 248-433-7715 to request that your account be linked to your Township permits.
- Confirm the municipality: Select Bloomfield Township, Oakland County, Michigan.
- Open your permit activity: Select Services, then View My Building Department Activity, followed by the Permits tab.
- Choose the permit: Locate your permit and select Schedule Inspection.
- Complete and confirm: Follow the prompts and retain the confirmation email if one is issued.
On mobile devices, use the website menu to access Services. Turning your phone horizontally may reveal inspection options that are not visible in portrait orientation.
Official Inspection Scheduling Instructions ↗
Inspection Deadlines and Cancellations
Advance scheduling: Township construction packets specify scheduling by 5:00 PM at least one working day before the requested inspection.
Cancel or reschedule: The official inspection page states that cancellations must be made before 5:00 PM the day before the scheduled inspection. Use the cancellation option under your permit’s inspection activity in BS&A.
Inspection arrival time: Call 248-433-7715 between 7:00 AM and 8:00 AM on the scheduled inspection day for an approximate arrival window.
Inspector access: You generally do not need to meet the inspector, but access to the inspection area must be available.
Common Construction Inspection Stages
- Foundation: Footings and foundation work before applicable stages are concealed.
- Rough framing: Framing and related structural construction.
- Trade inspections: Electrical, plumbing and mechanical installations.
- Insulation: Applicable insulation and energy-code work.
- Final inspection: Completed construction and remaining permit requirements.
The exact inspections depend on the approved plans and permit conditions. Township construction packets require relevant trade inspections before certain rough-frame and final building inspections.
Keep approved drawings available at the job site, ensure work is ready before requesting inspection, and do not conceal work requiring approval.
Can’t Find Your Permit in BS&A?
Check these common problems before contacting the office:
- You selected Bloomfield Township in Missaukee County instead of Oakland County.
- You are signed into an account that is not linked to the permit.
- Your permit appears on a later page of the permit list.
- Your account has not been authorized for inspection scheduling.
- Mobile screen orientation is hiding available controls.
If the portal requests a PIN or displays an authorization error, call the Building Division to confirm the correct account permissions.
Michigan Building Codes Used in 2026
Bloomfield Township enforces applicable Michigan construction codes together with local zoning and ordinance requirements.
| Code category | Officially identified code |
|---|---|
| Building | 2021 Michigan Building Code, effective April 9, 2025 |
| Residential | 2015 Michigan Residential Code remains applicable while enforcement of the 2021 update is stayed |
| Mechanical | 2021 Michigan Mechanical Code |
| Plumbing | 2021 Michigan Plumbing Code |
| Electrical | 2023 National Electrical Code with Michigan Part 8 rules |
| Commercial energy | 2021 Michigan Commercial Energy Code |
| Local requirements | Applicable Bloomfield Township zoning and ordinances |
Official resources:
- Michigan LARA — Current Construction Codes
- Michigan LARA — Rulemaking and Residential Code Status
- Bloomfield Township — Building Division Forms
Final Approval and Certificate of Occupancy
Where a Certificate of Occupancy is required, completing construction or passing the final building inspection does not automatically authorize occupancy.
Before occupancy, the required building, electrical, mechanical, plumbing and other applicable inspections or approvals must be completed.
- Finish permitted construction and correct outstanding violations.
- Complete required trade and building inspections.
- Resolve applicable site grading, fire or other approval conditions.
- Submit the appropriate Certificate of Occupancy request.
- Wait for the Township to issue the required occupancy authorization.
The Township also provides temporary occupancy procedures. A temporary occupancy request requires applicable permits to have at least partial final inspection approval without safety violations.
Commercial tenant changes may require a separate change-of-occupancy application, particularly when the use of the space changes.
Official Certificate of Occupancy Information ↗
Other Important Local Requirements
Homeowner Permits and Contractor Licensing
Bloomfield Township allows homeowners to apply for permits, subject to its requirements. The permit holder remains responsible for compliant construction, and a homeowner affidavit may be required.
When hiring a contractor, verify applicable Michigan licensing and confirm who will obtain permits and schedule inspections.
Subdivision and Zoning Rules
Township permit approval does not override subdivision deed restrictions. Where an association applies, check its requirements before finalizing your plans.
Building setbacks, lot coverage, accessory-structure placement and screening requirements may affect your project.
Utility Locating Before Excavation
Before digging, arrange underground utility locating through MISS DIG 811. Utility marking and building permits serve different purposes; one does not replace the other.
Existing Permit Records and Building Plans
Bloomfield Township states that some residential plans associated with permits issued after 1988 may be available through public-records requests.
Use the Township’s official public-records request portal to request available documents. Records may be incomplete or subject to disclosure restrictions.
For the separate City of Bloomfield Hills, use our Bloomfield Hills Building Department guide. Our Bloomfield building department directory helps distinguish similarly named jurisdictions in other states.
Frequently Asked Questions
1. Where is the Bloomfield Township Building Department located?
The Bloomfield Township Building Division is located at 4200 Telegraph Road, Bloomfield Hills, MI 48303-0489, in Oakland County. The office is on the lower level of Township Hall.
2. Do I need a permit for home renovations in Bloomfield Township?
Many renovations require permits, including structural modifications, additions, kitchen remodeling and regulated electrical, mechanical or plumbing work. Requirements depend on the project scope. Call 248-433-7715 if you are unsure.
3. Can I apply for a Bloomfield Township building permit online?
Eligible minor home projects and certain electrical, mechanical and plumbing permits can be submitted through BS&A Online. Other applications may require Township forms and submission in person or by mail.
4. What documents do I need for a building permit?
Common requirements include an application, property details, construction drawings, a site plan and applicable contractor information. Subdivision comments, zoning approval or additional agency documents may be necessary depending on the project.
5. How much does a building permit cost in Bloomfield Township?
Costs depend on the project. A Township building fee schedule effective July 1, 2021 lists a $120 minimum building permit fee and $0.90 per square foot for residential new construction, additions and alterations. Confirm current charges before applying.
6. How long does Bloomfield Township take to approve building permits?
The Township reports approximately 10 business days for plan review and recommends allowing up to two weeks for typical projects. Commercial reviews or applications requiring corrections and additional approvals may take longer.
7. How do I schedule a building inspection in Bloomfield Township?
Sign in to BS&A Online using an account linked to your Township permits. Select Bloomfield Township in Oakland County, open Building Department Activity, locate your permit and choose Schedule Inspection.
8. How do I cancel or reschedule an inspection?
Open your linked permit in BS&A Online, locate the inspection and use the cancellation option. The Township requires cancellation before 5:00 PM the day before the scheduled inspection. Contact 248-433-7715 if you need assistance.
9. Which building codes apply in Bloomfield Township in 2026?
Michigan identifies the 2021 Building Code, 2021 mechanical and plumbing codes, and 2023 NEC with state rules. The 2015 Michigan Residential Code remains applicable during the court-ordered stay of the residential update. Verify current status before submitting plans.
10. Do I need a Certificate of Occupancy after construction?
Where required, a Certificate of Occupancy must be issued before the building or space is occupied. Final inspection approval alone does not provide occupancy authorization. Contact the Building Division for the applicable certificate requirements.
Official Resources and Forms
Information reviewed: October 9, 2026. Government fees, procedures, code rules, office hours and online services may change. USBuilding.org is an independent informational resource and is not operated by or affiliated with Bloomfield Township. Confirm project-specific requirements with the responsible government authority.