Key Biscayne Building Permits, Inspections & Official Services
If you are remodeling a home, replacing a roof, installing impact windows, changing an air-conditioning system, building an addition, working on a condominium unit, adding a pool or trying to close an old permit in Key Biscayne, the Village Building, Zoning and Planning Department is the place to start.
Permitting in Key Biscayne has an extra layer of importance because the Village is in Miami-Dade County’s High Velocity Hurricane Zone and is also a coastal, flood-sensitive community. A project that looks simple on paper can involve building-code, zoning, floodplain, product-approval or county review questions. Getting those pieces right before submission can save a frustrating correction cycle later.
Key Biscayne Building Department Contact Information
| Item | Current information |
|---|---|
| Department | Village of Key Biscayne Building, Zoning and Planning |
| Office | 88 W. McIntyre Street, Suite 250, Key Biscayne, FL 33149 |
| General permitting | 305-365-5512 |
| Building Official | Rene Velazco — 305-365-8902 |
| Permit processing hours posted in Accela | Monday–Thursday, 7:30 a.m.–1:30 p.m. |
| Online system | Accela Citizen Access |
| Forms | Village Forms and Resources |
| Staff contacts | Building, Zoning & Planning Directory |
The official Accela notice says there is currently no walk-through permitting service. Electronic submittal is encouraged, although the Village also states that paper applications and plans may still be accepted and scanned into the electronic system.
Do You Need a Building Permit in Key Biscayne?
New construction, additions, remodeling and regulated building, electrical, plumbing, mechanical, roofing and similar work generally enter the Village permitting process. Zoning, tree work, right-of-way activity, fire review or other approvals can also be involved depending on the project.
Do not assume that a repair is permit-free simply because it is small. The Village maintains a specific List of Minor Repairs in its Forms and Resources library, and staff can confirm whether your exact scope requires a permit.
Important 2026 Florida permit exemption
The exemption is also not something to casually assume. The owner or contractor must submit a written exemption request with documentation showing the nature and value of the work. A larger project cannot be divided into smaller jobs simply to stay below the threshold.
For Key Biscayne, the flood-hazard limitation matters. Before relying on the exemption, confirm the property’s flood classification with the Village. The Village’s flood-preparedness material directs residents with flood-zone questions to the Building Official at 305-365-8902.
You can read the current law directly at the Florida Senate’s 2026 Statutes page.
Which Building Code Applies in Key Biscayne in 2026?
As of November 3, 2026, the Village’s Accela system identifies the Florida Building Code, 8th Edition (2023) as the code currently in effect. The statewide 9th Edition (2026) is scheduled to become effective on December 31, 2026.
Key Biscayne is within Miami-Dade County, which is part of Florida’s High Velocity Hurricane Zone (HVHZ). That is particularly relevant for roofs, windows, exterior doors, shutters and other building-envelope products. Product approvals, design pressures and installation details can matter just as much as the permit application itself.
For a deeper explanation of the countywide code environment, see our Miami-Dade County Florida Building Code guide.
The official statewide code can be checked through the Florida Building Commission Building Code Information System.
What the Key Biscayne Building Department Handles
| Service | What it is used for |
|---|---|
| Building permits | New construction, additions, alterations, renovations, structural work and other regulated projects. |
| Trade permits | Electrical, plumbing, mechanical/HVAC, roofing and other regulated disciplines. |
| Plan review | Review of construction documents for building-code and applicable local requirements. |
| Zoning review | Setbacks, use, site conditions, variances and other zoning-related approvals. |
| Inspections | Required construction-stage inspections, trade inspections and final inspections. |
| Certificates | Certificates of Occupancy, Completion and qualifying temporary or provisional certificates. |
| Permit records | Permit status, application records, inspection information and available documents. |
| Building recertification | Applicable structural/electrical building recertification and related compliance processes. |
Some projects can involve other agencies or Village divisions. The official permitting page specifically points applicants to Miami-Dade environmental resources, health resources, zoning, tree permitting and other services where applicable.
How to Apply for a Key Biscayne Building Permit
- Confirm the property is under Village jurisdiction.
Use the exact property address and parcel information. Do not rely only on a Key Biscayne mailing address if the site is near a government or park boundary. - Identify the correct permit type.
Determine whether the job is building, roofing, electrical, plumbing, mechanical, solar, windows and doors, demolition, pool, fence or another permit category. - Open the official forms library.
Go to the Forms and Resources page and locate the general permit application plus any project-specific checklist or supplemental form. - Prepare plans and supporting documents.
Gather the survey, construction drawings, contractor information, product approvals, engineering, Notice of Commencement or other documents required for your scope. - Create an Accela account.
Open Accela Citizen Access. Full online services require account registration; some searches can be used with limited anonymous access. - Create the building application.
Select the Building service, start the appropriate application and enter the property, owner, contractor and project information carefully. - Upload the complete plan package.
Use clearly named files and make sure the plans, forms and supplemental documents match the scope described on the application. - Track review comments and fees in the existing record.
Respond to requested corrections through the same permit record rather than creating a duplicate application. Once the permit is issued, follow the assigned inspection sequence before covering regulated work.
The Village also continues to accept certain paper submissions. Its Accela notice states that paper documents are scanned into the portal; documents sized 8.5 × 11 or 11 × 17 are currently scanned without charge, while larger paper documents may carry a scanning charge.
What to Prepare Before You Submit
The exact package changes with the project, but preparing the basics before opening Accela usually saves time.
- Exact property address and parcel information.
- Owner name and contact information.
- Clear description and scope of work.
- Applicable contractor and qualifier information.
- Architect or engineer information when professional design is required.
- Construction plans appropriate to the work.
- Current property survey or site plan when location and setbacks matter.
- Miami-Dade or Florida product approvals where required.
- Applicable flood information and elevation documentation.
- Trade applications for electrical, plumbing, mechanical or other disciplines.
- Owner-builder documentation when legally applicable.
- Notice of Commencement when required for the project.
Useful project-specific forms already published by the Village
The Village’s document library contains dozens of project forms. Instead of searching the internet for an unofficial copy, open the official Forms and Resources page and search the document name.
| If your project involves… | Look for this Village document |
|---|---|
| General construction | Permit Application + Permit Application Submittal Checklist |
| Roof replacement | Roofing Packet Complete |
| Windows or exterior doors | Windows and Doors Permit Supplement |
| Solar | Solar Permit Form + Solar Systems Permit Checklist |
| Owner-builder work | Owner Builder Affidavit |
| Starting covered work | Notice of Commencement form, when applicable |
| Private provider | Private Provider Forms + Notice to Building Official |
| Permit closeout | Final Closeout Document Requirements + Checklist for Certificate of Occupancy and Completion |
| Fence | Fence Details |
| Tree removal | Tree Removal Permit Application |
How to Search a Key Biscayne Permit or Application
You do not need to call the department every time you want to check a record. Accela provides a public building-record search.
- Open the Key Biscayne Building Search.
- If you know the record or permit number, search by that first.
- If not, search by site address, parcel number, contractor information or contact information.
- Open the matching record and review its current status.
- Look for outstanding review activity, fees, inspections and available documents.
A permit appearing in search results does not automatically mean the project was completed properly. For property due diligence, check whether required final inspections and any applicable Certificate of Occupancy or Completion were actually issued.
How Key Biscayne Building Inspections Work
The Village’s Accela portal currently states that inspections are conducted from 10:30 a.m. to 2:00 p.m.. It also states that plumbing, mechanical and fire inspections are not offered on Friday.
Schedule an inspection online
- Open Accela Citizen Access.
- Select Schedule an Inspection under the Building services.
- Locate the issued permit or record.
- Select the inspection type required for the stage of work.
- Choose an available date and submit the request.
- Return to the permit record afterward to verify the inspection result.
Prepare the site before the inspector arrives
- Make sure the permit has actually been issued.
- Keep the approved plans and permit documents available.
- Do not cover work that still requires inspection.
- Provide safe access to the work area.
- Have required product approvals, engineering letters, affidavits or special-inspector documents available when applicable.
- Check the inspection result before moving to the next stage.
A failed inspection is inconvenient, especially when subcontractors are scheduled around it. Before requesting the visit, compare the work to the approved plan set rather than to an earlier drawing or contractor proposal.
Key Biscayne Building Permit Fees
The Village currently links an official Building, Zoning and Planning fee schedule with an effective date of March 1, 2022. Because that document predates several 2026 Florida law changes, use the amounts below as a practical reference and confirm the actual assessed charge in Accela before paying.
| Fee item in the Village schedule | Published amount |
|---|---|
| Processing fee | $33 |
| Submittal fee for additions, alterations and new construction | 50% of base permit fee, credited toward base permit fee at issuance |
| Expedited plan review processing fee | $110, plus applicable expedited review charges |
| Dry-run/courtesy review processing fee | $330, plus review time |
| Area-based residential/commercial new construction and renovations | $1.43 per total sq. ft. of floor area |
| Minimum permit fee | $100 per applicable discipline |
| Minimum for a single trade | $150 for the discipline |
| Other permit types / renovations not based on area | 2.53% of construction value under the posted schedule |
| Permit/application extension before expiration | $66 |
| Permit renewal | $110 + 13.75% of original base permit fee |
| Re-inspection for disapproved work | $82.50 beyond the included re-inspection |
| Partial re-inspection | $82.50 |
| After-hours/weekend inspection | $330 minimum; additional time after first two hours at $110/hour |
For the complete schedule, including certificates, public works, zoning, fire and other fees, use the Village’s official permit fee schedule.
Practical Ways to Avoid Permit Delays in Key Biscayne
1. Check flood conditions early
Do this before treating a small project as permit-exempt and before designing equipment locations, additions or substantial improvements. Flood requirements can change what must be shown on the plans.
2. Use the correct HVHZ product approval
For roofing, windows, doors, shutters and similar exterior components, do not upload a generic manufacturer brochure. Confirm that the proposed product and installation method are approved for the applicable Miami-Dade/HVHZ use.
3. Keep the scope consistent everywhere
The application, contract description, drawings and trade permits should describe the same job. A plan showing work that is missing from the application can trigger questions or additional permit disciplines.
4. Upload corrections to the existing application
If a reviewer requests changes, respond through the existing permit record. Starting a second application for the same work can create duplicate records and confusion.
5. Check for open or expired permits before starting another project
If you recently purchased the property, inherited an unfinished renovation or are preparing for a sale, search the address in Accela before applying. An old permit may require renewal, cancellation or final inspection.
6. Ask the right person
The Village publishes direct contacts for the Building Official, permit clerks, chief inspectors, zoning reviewer and other staff. If the issue is technical, calling the general line repeatedly may be slower than contacting the correct discipline through the official staff directory.
How to Close a Key Biscayne Permit Properly
Getting the permit issued is only the beginning. The record should also be properly completed.
- Complete every required inspection in the correct sequence.
- Correct failed inspections and request re-inspection where necessary.
- Submit required final affidavits, tests, engineering letters or as-built documentation.
- Confirm that required building, electrical, plumbing, mechanical, zoning, fire or other reviews are cleared.
- Apply for the applicable Certificate of Occupancy or Certificate of Completion when required.
- Reopen the Accela record and verify that the permit shows a final/closed status.
- Save the permit, approved plans, inspection results and final certificate with the property’s permanent records.
The Village Forms and Resources library includes both a Final Closeout Document Requirements form and a Checklist for Certificate of Occupancy and Completion. Those are useful before requesting the last inspection because they show that final approval may depend on documents as well as physical inspection.
Buying or selling a Key Biscayne property?
Search permits by address and do not treat “permit issued” as the same thing as “permit closed.” If records are incomplete, use the Village’s permitting staff or public-record process to obtain the missing permit file, approved plans, inspection history or certificate.
Nearby municipalities use different systems and procedures. If the property is outside the Village, our guides to the Biscayne Park Building Department, Bay Harbor Islands Building Department and Coral Gables Building Department explain those separate processes.
Official Key Biscayne Permit Resources
- Village of Key Biscayne Permitting — department services and official links.
- Accela Citizen Access — applications, records and inspection scheduling.
- Forms and Resources — permit forms, checklists, supplements and closeout documents.
- Building, Zoning & Planning Staff Directory — current staff and discipline contacts.
- Village Permit Fee Schedule — officially linked fee document.
- Florida Building Code — current and upcoming code editions.
Key Biscayne Building Department FAQs
1. Where is the Key Biscayne Building Department?
The Village Building, Zoning and Planning permitting office is listed at 88 W. McIntyre Street, Suite 250, Key Biscayne, FL 33149. For general permitting questions, call 305-365-5512.
2. How do I apply for a Key Biscayne building permit online?
Use the Village’s Accela Citizen Access portal. Create an account, select the Building service, start the appropriate application, enter the project and property information, upload the required plans and forms, and then track review activity through the same record.
3. What are the Key Biscayne permit processing hours?
The Village’s current Accela notice states that permits are processed from 7:30 a.m. to 1:30 p.m. Monday through Thursday and that no walk-through service is currently offered. Check the portal before making an in-person trip because procedures can change.
4. What time are building inspections performed in Key Biscayne?
The current Accela notice states that inspections are conducted from 10:30 a.m. to 2:00 p.m. It also states that plumbing, mechanical and fire inspections are not offered on Friday.
5. How do I schedule a Key Biscayne building inspection?
Open Accela Citizen Access, select Schedule an Inspection under Building, locate the issued permit, choose the required inspection type and submit the request. Keep the approved plans and permit documents available at the job site.
6. How much does a Key Biscayne building permit cost?
There is no single flat permit price. The Village’s currently linked fee schedule includes a $33 processing fee, area- or project-based permit charges, minimum discipline fees and possible plan-review, inspection and surcharge costs. The published schedule carries a March 1, 2022 effective date, so confirm the actual 2026 amount assessed in Accela before paying.
7. Which Florida Building Code applies in Key Biscayne in 2026?
As of November 3, 2026, the Florida Building Code, 8th Edition (2023), remains in effect. The 9th Edition (2026) is scheduled to become effective December 31, 2026. Projects near the transition should confirm the governing edition before finalizing plans.
8. Does work under $7,500 need a permit in Key Biscayne?
Not always, but the exemption is limited. Florida’s 2026 law provides an exemption for certain work valued at less than $7,500 on qualifying single-family residential property. It does not cover electrical, plumbing, structural, mechanical or gas work, and it does not apply to property partly or entirely in a flood hazard area. A written exemption request is also required.
9. Can a Key Biscayne homeowner pull an owner-builder permit?
The Village’s forms library includes an Owner Builder Affidavit. Whether a particular owner qualifies depends on Florida owner-builder requirements and the project circumstances, so review the affidavit and confirm eligibility with the Village before applying as owner-builder.
10. How can I search Key Biscayne permits by address?
Use the Building Search section of the Village’s Accela portal. You can search using a site address, parcel number, record information, contractor license information or contact information. If you know the permit number, that is usually the fastest search method.
Before You Start Work
The safest sequence is simple: confirm jurisdiction, determine whether a permit is required, check flood and zoning issues, use the correct Key Biscayne forms, prepare HVHZ-compliant plans and product information, submit through Accela, and wait for permit issuance before beginning regulated construction.
That preparation may feel slower than starting immediately, but it is usually much easier than stopping construction later to fix an unpermitted job, replace a non-approved product or reopen an expired permit.
Independent guide: USBuilding.org is not the Village of Key Biscayne or a government agency. Information was reviewed for 2026 using Village of Key Biscayne, Accela, Miami-Dade County, Florida Building Commission and Florida statutory resources. Permit requirements, fees, staff, inspection availability and portal procedures can change; the Village Building Official remains the final authority for a specific property or project.