Biscayne Park Building Permits & Inspections
Quick answer: The Village of Biscayne Park Building Department manages building permits, construction plan reviews, inspections, and related zoning approvals within Biscayne Park, Miami-Dade County, Florida. Building permit applications must be submitted electronically through the GeoCivix CAP portal.
For assistance, call 305-899-8000 or email building@biscayneparkfl.gov. Obtain required approvals before starting construction.
Department Address, Phone & Office Hours
| Department | Village of Biscayne Park Building, Permits & Zoning |
|---|---|
| Jurisdiction | Biscayne Park, Miami-Dade County, Florida |
| Address | 600 NE 114th Street, Biscayne Park, FL 33161 |
| Phone | 305-899-8000 |
| building@biscayneparkfl.gov | |
| Monday–Thursday | 9 AM–5 PM; closed 1–2 PM |
| Friday | 9 AM–5 PM; closed to the public at noon |
| Online applications | GeoCivix CAP Portal |
| Inspection email | inspection@biscayneparkfl.gov |
Source: Official Village Staff Directory. Public counter hours and holiday availability may change.
What Work Requires a Building Permit?
The Village requires permits for many types of construction, remodeling, exterior improvements, and building-system alterations. The exact permit and review requirements depend on the work being performed.
| Project | Important requirements to check |
|---|---|
| New homes & additions | Construction plans, property survey, zoning setbacks, Planning Board approval, and relevant trade permits. |
| Interior remodeling | Structural work, changes to electrical or plumbing systems, and applicable construction drawings. |
| Roof replacement | Roofing application, roof assembly, product approvals, and applicable design review. |
| Windows & doors | Window and door specifications, wind-load calculations, and product approvals. |
| Electrical work | Electrical permit, licensed contractor information, drawings when required, and inspections. |
| Plumbing & HVAC | Applicable trade permits, equipment information, and inspections. |
| Fences & driveways | Survey, location, materials, Village design standards, and zoning requirements. |
| Pools, spas & decks | Project plans, setback requirements, pool barriers, and relevant trade permits. |
| Solar panels & generators | Structural and electrical documents, equipment specifications, and product approvals. |
| Demolition | Demolition permit, site plans, utility coordination, and applicable safety requirements. |
Unsure whether your project needs a permit? Email the Building Coordinator with the property address, a short description of the work, and whether structural, electrical, plumbing, roofing, or exterior components will change. Request confirmation before beginning work.
How to Apply for a Biscayne Park Building Permit
Building permits are processed through GeoCivix CAP. The Village states that applications and approvals must be submitted electronically and that documents will not be accepted in person.
- Identify your permit type. Determine whether the project requires building, roofing, electrical, mechanical, plumbing, demolition, fencing, or another permit.
- Download the correct forms. Open the official forms directory. Download the permit application and relevant supporting forms.
- Check your project’s requirements. Review the Village’s project-specific checklists before preparing plans.
- Create a CAP account. Visit cap.geocivix.com/secure, select the registration option, provide the required account information, and activate your account through the registration email.
- Start a project submission. Sign in, choose the applicable project submission option, and select Miami-Dade County and the Village of Biscayne Park as the jurisdiction. Complete the current application fields for your project.
- Upload your documents. Attach completed application forms, drawings, surveys, contractor information, product approvals, and other required records as clearly named PDFs.
- Submit for review. Confirm the application and monitor your registered email and CAP account for updates.
- Respond to corrections. If reviewers request changes, upload complete revised plans and the necessary supporting explanations through your application record.
- Complete payment and issuance. After approval, follow the Building Coordinator’s invoicing and payment instructions. Download the stamped approved plans and issued permit before construction.
Avoid outdated portal instructions: Some older Village PDFs contain screenshots from previous software versions and references to another municipality. Always use the current GeoCivix URL and choose Village of Biscayne Park, not El Portal or another local jurisdiction.
Documents Commonly Required
- Completed building permit application with property and project details.
- Property owner’s contact information and required signatures.
- Licensed contractor information or applicable owner-builder documentation.
- Property survey and site plan when required.
- Architectural, structural, electrical, plumbing, or mechanical plans as applicable.
- Roofing specifications, window and door product approvals, or engineering documents where relevant.
- Notice of Commencement and any required affidavits or additional agency approvals.
- Planning Board or zoning approval where required.
Upload each plan discipline as a complete multipage PDF. Use descriptive file names, valid digital signatures when required, and updated complete sets when responding to plan-review corrections. Avoid password-protected PDFs and compressed ZIP files.
Official documents: Permit Upload Instructions.
How to Schedule a Building Inspection
The Village’s published inspection instructions direct requests to inspection@biscayneparkfl.gov by 4 PM on the day before the requested inspection.
- Locate your building permit number and identify the required inspection.
- Ensure the relevant construction stage is complete and ready for inspection.
- Email the inspection office with the permit number, property address, inspection type, preferred date, and contact telephone number.
- Wait for confirmation of the requested inspection.
- Make approved plans and permit documents available to the inspector.
- Check the inspection result and correct any deficiencies before requesting reinspection.
Important: The published deadline is a request-submission cutoff, not a guarantee of next-day availability. Confirm arrangements for holidays, special inspections, and projects involving private providers. Private-provider inspections have separate notice requirements.
Common Building Inspection Types
Depending on the approved work, inspections may include foundation, reinforcement, framing, electrical rough-in, plumbing rough-in, mechanical, roof underlayment, window and door installation, pool barriers, and final inspection.
Do not cover or conceal work that requires inspection before receiving the appropriate approval.
Reference: Village Inspection Types (PDF).
Biscayne Park Building Permit Fees in 2026
The Village publishes a Master Fee Schedule amended in June 2026 and linked from its forms directory under July 2026. The following are selected charges from that published schedule.
| Permit or service | Published fee |
|---|---|
| Minimum building permit base fee | $130 |
| New single-family or duplex construction | $12 per sq. ft. + review fees |
| Single-family or duplex additions | $12 per sq. ft. + review fees |
| Single-family or duplex alterations | $6 per sq. ft. + review fees |
| Flat or shingle roofing | $0.50 per sq. ft. + review fees |
| Tile or metal roofing | $0.70 per sq. ft. + review fees |
| Residential swimming pool installation | $2,000 + review fees |
| Window installation or replacement | $40 each + review fees |
| A/C changeout | $170 |
| Minimum plumbing permit | $130 |
| Minimum electrical permit | $130 |
| Minimum mechanical permit | $130 |
| Nonstructural plan review | $95 per hour; one-hour minimum per trade |
| Structural engineering review | $130 per hour |
| Administrative fee | $40 |
| Permit extension before expiration | $125; listed as a one-time extension |
| First reinspection occurrence | $95 |
| Second reinspection occurrence | $110 |
The published schedule also lists additional charges, including applicable state and county surcharges and a technology fee equal to 2.5% of the base permit fee. Separate trade permits and specialized reviews may increase the total.
Example: For a 100-square-foot single-family alteration, the listed $6-per-square-foot building calculation produces a $600 base amount before applicable plan review, surcharges, and separate trade permits. The Village determines the final invoice.
The Village’s payment instructions list a 2.29% transaction charge for credit or debit card payments.
Official fee document: 2026 Village Master Fee Schedule (PDF).
Fee confirmation: Published fee schedules can be amended. Biscayne Park also adopted Resolution 2026-49 concerning building-permit fees. Confirm the currently applicable rate and any amendments with the Building Coordinator before budgeting or paying.
How Long Does Permit Approval Take?
There is no verified universal approval timeline covering every Biscayne Park permit. Processing depends on the project, completeness of submitted plans, zoning requirements, reviewer comments, and other required approvals.
The Village’s upload instructions state that an approved permit application generally takes one to two business days to be invoiced after approval. This does not include the time needed for initial review or corrections.
For a pending application, check your CAP account and email. If the status is unclear, contact the Building Coordinator with your project or permit reference number.
Local Zoning, Planning & Building Codes
Planning and Design Review
Biscayne Park has local design and zoning requirements in addition to statewide building standards. New homes, additions, and certain exterior projects may need Planning and Design Review Board approval.
The board generally meets on the first and third Monday of each month at 6:30 PM. Confirm the latest meeting calendar and submission deadlines before scheduling your project.
Common considerations include lot coverage, building setbacks, exterior appearance, roofing, fences, driveways, landscaping, and neighborhood compatibility.
Official Planning and Design Review Board
Exterior House Painting
Exterior painting requires Village approval. The Village’s building guidance directs applicants to provide three proposed color swatches. Certain preapproved colors available at Village Hall may follow a simpler approval route without separate zoning approval.
Before purchasing paint, check the current paint approval form and confirm whether your selected colors need Planning Board consideration.
Applicable Florida Building Code
As of October 2026, the Florida Building Code, 8th Edition (2023), remains the operative statewide edition, subject to applicable amendments and project-specific requirements.
The Florida Building Commission’s published development schedule lists December 31, 2026 as the planned effective date for the 9th Edition (2026).
Projects filed near the transition should confirm the governing edition with the Building Department. Local zoning rules, flood regulations, and applicable product approval requirements may also apply.
Florida Building Commission — Official Code Resources
Common Permit Problems & What to Do
| Problem | Practical solution |
|---|---|
| Wrong permit category | Ask the Building Coordinator which application category applies before resubmitting. |
| Missing documents | Compare your package against the Village’s project-specific checklist. |
| Rejected plan review | Read every reviewer comment, revise the plans, and upload complete corrected files. |
| Digital signature issues | Verify that professional signatures comply with applicable requirements and that PDFs remain accessible. |
| Portal account problem | Check the registration email and activation link, then contact support or the department if needed. |
| Inspection not confirmed | Verify the request was sent to the correct inspection email before the published cutoff. |
| Permit about to expire | Contact the department before expiration to check extension eligibility and applicable charges. |
| Unapproved construction changes | Ask whether revised plans or a permit revision must be approved before continuing. |
Official Applications, Forms & Resources
| Resource | Official link |
|---|---|
| Building Department | Department Website |
| Building permit portal | GeoCivix CAP |
| Permit forms | Applications & Forms |
| Project requirements | Permit Checklists |
| PDF submission instructions | Upload Instructions |
| 2026 permit fees | Master Fee Schedule PDF |
| Planning Board | Planning & Design Review |
| Village contacts | Official Directory |
| Florida building codes | Florida Building Commission |
For projects in other Miami-Dade municipalities, see our Bal Harbour building permit guide and Aventura building permit guide. Confirm the correct municipal permitting office before applying.
Frequently Asked Questions
1. Where is the Biscayne Park Building Department located?
The department is located at Village Hall, 600 NE 114th Street, Biscayne Park, FL 33161. Call 305-899-8000 for assistance. Building permit documents must be submitted electronically.
2. How do I apply for a building permit in Biscayne Park?
Visit the GeoCivix CAP portal at https://cap.geocivix.com/secure/, create or sign in to your account, select Biscayne Park, enter your project details, upload the required PDFs, and submit the application for review.
3. Does Biscayne Park accept paper permit applications?
No. The Village’s current building forms page states that permits and approvals must be submitted electronically through the CAP portal. Documents are not accepted in person.
4. What projects require a permit in Biscayne Park?
Common permit projects include new construction, additions, renovations, roofing, windows, doors, electrical work, plumbing, HVAC, fencing, pools, and demolition. The Building Department can confirm whether an individual repair is exempt.
5. How do I schedule a building inspection?
The Village’s published instructions direct inspection requests to inspection@biscayneparkfl.gov. Include your permit number, property address, inspection type, requested date, and contact telephone number.
6. What is the deadline for requesting an inspection?
The Village’s published instructions require inspection requests by 4 PM on the day before the requested inspection. Confirm holiday schedules, special inspection requirements, and actual availability with the department.
7. How much does a building permit cost in Biscayne Park in 2026?
The published 2026 Master Fee Schedule lists a $130 minimum building permit base fee. The final amount depends on project type, area, plan review, trade permits, applicable surcharges, and any later fee amendments.
8. How long does Biscayne Park take to approve a building permit?
There is no verified standard approval time for all projects. Processing depends on project complexity, complete documents, zoning reviews, and corrections. The Village states that invoicing generally takes one to two business days after approval.
9. Do I need Planning Board approval for construction or exterior work?
New construction, additions, and certain exterior improvements may require Planning and Design Review Board approval. Check the relevant Village project checklist and confirm requirements before submitting a building permit application.
10. Which Florida Building Code applies in Biscayne Park in 2026?
As of October 2026, the Florida Building Code, 8th Edition (2023), remains in effect with applicable amendments. The 9th Edition (2026) is scheduled to take effect December 31, 2026. Confirm the governing edition for projects near the transition.
Information reviewed: October 2026, using official Village of Biscayne Park documents and Florida government resources. Fees, contact details, code editions, and submission procedures may change. USBuilding.org is an independent informational website, not an official government agency, and is not affiliated with or endorsed by the Village of Biscayne Park.