American Fork Building Department 2026: Permits, Inspections & Services

Building Permits & Inspections in American Fork, Utah

The American Fork Building Department handles building permit reviews, construction inspections, and building-code compliance within American Fork City, Utah County. Homeowners and contractors can submit building projects online through CityInspect, but some projects require zoning clearance before the building permit application.

Start here: Identify your project type, check the city’s permit checklist, obtain zoning clearance if required, and submit your plans through the official portal. Schedule inspections before covering any work that needs approval.

Department Contact Information

Office Address

275 East 200 North
American Fork, UT 84003

Phone Number

801-763-3060

Office Hours

Monday–Thursday
7:00 a.m.–5:30 p.m.
Mountain Time

Official Website

americanfork.gov

Key contacts: Dan Loveland, Chief Building Official; Andrew Baxter, Plans Examiner; and Lori Faught, Permit Specialist. The city lists the department’s main telephone number for assistance with applications and inspections.

These are the Building Department’s published hours and location. They differ from the general City Hall address and hours. Confirm holiday schedules before visiting.

Which Projects Need a Building Permit?

American Fork requires permits for many construction, alteration, and building-system projects. Common examples from the city’s published guidance include:

ProjectPermit guidance
New homes and additionsBuilding permit and plan review generally required.
Basement finishing or remodelingCheck the city’s basement/remodel checklist and applicable trade permits.
Detached garages and shedsStructures over 200 sq. ft. are listed as requiring permits. Smaller structures must still meet zoning requirements.
Decks, patio covers and poolsListed among projects requiring permits.
Roofing, exterior siding and solarListed among permit-related projects; confirm the scope and required application.
Electrical, plumbing, gas or HVAC workPermits generally apply to regulated installation, replacement and alteration work.
Fences and retaining wallsCheck applicable permit requirements, height restrictions, setbacks and zoning rules.
Commercial constructionBuilding review plus other zoning, fire or development approvals may be required.

Small-shed exception: The city’s FAQ states that buildings under 200 square feet generally do not require a building permit, but they must comply with applicable setbacks and municipal regulations. This is not an exemption from zoning rules, utility easements or other applicable approvals.

For uncertain projects, call 801-763-3060 before purchasing materials or beginning construction.

How to Apply for a Building Permit

American Fork uses CityInspect for its online building-permit process. The city specifically directs applicants to complete zoning clearance first when their project requires it.

  1. Confirm the property and project. Check that the address falls under American Fork City’s permitting authority. Identify whether the work is residential, commercial, accessory construction or a trade-specific project.
  2. Review the required documents. Open the official building checklists and select the checklist for your project.
  3. Complete zoning clearance if applicable. Review the Zoning Clearance Letter checklist. Sign in to CityInspect, select the Planning & Zoning module, and submit the Zoning Clearance Letter application with the required documents.
  4. Start the building permit application. After receiving required zoning clearance, access the city’s building-permit workflow through CityInspect. New users can register for an account here.
  5. Upload complete construction documents. Enter the property and project details, provide contractor or owner-builder information, and upload the required plans and documents. Check that all uploads are readable and complete.
  6. Respond to plan-review comments. Monitor your application, submit corrections if requested, and complete the required payments.
  7. Obtain approval before beginning work. Once the permit is issued, follow its conditions and schedule inspections at the required construction stages.
CityInspect account update: American Fork states that users who created a CityInspect login before November 2025 must register again to access the Planning & Zoning module. The city says the same username/password combination may be reused.

Documents to Prepare Before Applying

Incomplete submissions are not accepted by the Building Department. Requirements depend on the project, but applicants should prepare the following where applicable:

  • Scaled site plan: Property boundaries, existing structures, proposed construction, dimensions, setbacks and utility easements.
  • Construction drawings: Floor plans, elevations, foundations, framing and structural details.
  • Trade layouts: Electrical, plumbing, mechanical or gas-system details relevant to the work.
  • Supporting engineering: Structural calculations or engineer-stamped plans where required.
  • Contractor details: Contractor and subcontractor information, including applicable license numbers.
  • Owner-builder documentation: Required owner-builder forms if the owner qualifies and intends to perform the work.
  • Zoning approval: An issued Zoning Clearance Letter when required.

The city’s FAQ indicates that homeowners may generally draw plans for personal projects, but drawings must be to scale; it identifies a minimum plan scale of 1/4 inch = 1 foot and notes that engineered plans may still be required.

Official Project Checklists

Project typeWhat to prepare
New homeSite plan, architectural drawings, structural details, applicable energy and system information.
Home additionPlans showing the existing structure, proposed addition, foundation and connection details.
Basement finishRoom layout, electrical and mechanical information, safety features and applicable building details.
Garage or shedDimensions, setbacks, foundations where required, elevations and construction details.
Pool or solar projectProject-specific site and installation details from the city’s corresponding checklist.

View the city’s downloadable residential, commercial, basement, shed, pool and solar checklists.

American Fork Building Permit Fees for 2026

Permit costs depend on construction valuation, project scope, plan review, applicable impact fees and additional services. American Fork’s adopted FY 2026–2027 fee schedule took effect July 1, 2026.

Fee or servicePublished amount
New residential plan-review deposit$1,000 upfront
Standard residential plan review65% of building permit fee
Identical residential plan review30% of permit fee under the adopted fee schedule
Other permit plan-review minimum$50, as described on the city’s permit-fee page
State surcharge1% of building permit fee
Residential reinspection$175 per unit
Inspection cancellation$125 per unit
Residential occupancy fee$50
New commercial upfront partial plan review$1,000
Commercial tenant improvement/remodel upfront partial review$500

Important: The $1,000 new-residential charge is an upfront plan-review deposit, not the total construction permit price. The city’s online fee page also notes a 3% credit-card processing charge for permit, development and impact-fee payments over $300. Final charges depend on your application.

Impact Fees for New Residential Construction

New homes may have additional sewer, water, road, police, fire and other impact or connection fees. The city’s published new-single-family amounts include:

  • TSSD sewer impact fee: $5,793 per applicable unit, effective January 1, 2026.
  • Water impact fee: $2,502.45 for a 3/4-inch meter.
  • Roadway impact fee: $3,548.30 for a non-TOD single-family unit.
  • Fire impact fee: $429.30 per single-family unit.
  • TSSD impact processing fee: $15.

These are selected published charges, not a universal total. Roadway fees differ for transit-oriented development (TOD), and water charges depend on meter size. Other impact fees and utility connection costs may apply.

How to Schedule Building Inspections

American Fork requires inspections at applicable construction stages. The city’s published Building Inspection Policies and Procedures document, dated July 22, 2024, provides the following scheduling rules.

  1. Sign in to the CityInspect portal.
  2. Open the relevant issued permit or project record.
  3. Select the required inspection type or types and submit the inspection request.
  4. Submit the request at least one working day in advance. The published policy does not allow same-day inspections.
  5. Check for the confirmation email showing the scheduled date and AM or PM window. A requested date is not guaranteed until confirmed.
  6. Have the approved plans, permit information and work area ready for inspection. Keep work accessible and exposed until inspected and approved.

Published Inspection Time Windows

Inspection categoryPublished window
Standard morning inspections7:30–11:30 a.m.
Standard afternoon inspections1:00–4:30 p.m.
Solar, mechanical finals and signs — AM10:00–11:30 a.m.
Solar, mechanical finals and signs — PM3:00–4:30 p.m.
Concrete inspectionsRequest a one-hour inspection window.

The published policy describes inspection service Monday through Friday. These inspection windows are different from the department’s public-office hours. Confirm current availability and holidays through CityInspect.

Avoid extra charges: Work must be ready when the inspector arrives. The current adopted fee schedule lists a $175 reinspection charge per unit and a $125 inspection cancellation charge per unit. The published inspection policy notes that late cancellations can trigger a fee.

Read the city’s Building Inspection Policies and Procedures (PDF).

Building Codes Adopted in 2026

American Fork announced that Utah’s updated construction codes became effective July 1, 2026. The current statewide adoption includes different editions for different building systems.

Building codeEdition
International Building Code (IBC)2024
International Residential Code (IRC)2021
International Plumbing Code (IPC)2024
International Mechanical Code (IMC)2024
International Fuel Gas Code (IFGC)2024
International Energy Conservation Code (IECC)2024, subject to Utah amendments
International Fire Code (IFC)2024
National Electrical Code (NEC)2023

Residential distinction: Utah continues to use the 2021 IRC with applicable state amendments, including residential energy provisions. Do not automatically apply 2024 IBC rules to a project governed by the IRC.

Applicable state amendments, municipal zoning provisions and project-specific requirements must also be considered. Review Utah Code Title 15A and the American Fork municipal code when planning regulated work.

Local Rules That Can Affect Approval

Setbacks and Utility Easements

A permitted structure must also comply with zoning setbacks and easement restrictions. American Fork specifically warns that pools, detached garages and patio covers cannot encroach into public utility easements. Check the property’s plat, zoning designation and site plan before finalizing construction drawings.

Owner-Builder and Contractor Requirements

Qualifying homeowners may act as owner-builders for certain work, subject to Utah law and the city’s documentation requirements. The city publishes a property-owner affidavit and references the Utah Construction Trades Licensing Act. For hired work, verify the contractor’s license with the Utah Division of Professional Licensing (DOPL).

Starting Without Approval

American Fork warns that construction without required permits, approvals or inspections may result in penalties. Its 2026 fee schedule lists additional unauthorized-construction penalties, including $1,500 for certain existing residential structures and $3,000 for new residential structures involving new footings. These penalties are in addition to applicable permit fees.

Before construction: Confirm zoning clearance, applicable permits, approved plans and required inspections. An issued permit does not automatically eliminate other required planning, engineering or fire approvals.

Official Resources and Direct Links

ResourceOfficial link
Building DepartmentOffice information and permit guidance
CityInspectPermit and inspection portal
Planning and zoning applicationsDevelopment application process
Construction checklistsPlans, forms and procedures
Current fee scheduleFY 2026–27 PDF
Inspection policiesScheduling requirements PDF
Building Department FAQCity’s official answers
Utah building codesState Construction and Fire Codes Act

Frequently Asked Questions

1. How do I apply for a building permit in American Fork?

Check the city’s project checklist, obtain zoning clearance if required, then submit your building plans through CityInspect. Address review comments and receive the permit before starting regulated work.

2. Where is the American Fork Building Department located?

The department is at 275 East 200 North, American Fork, UT 84003. Its phone number is 801-763-3060, and published office hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.

3. Do I need a permit for a shed smaller than 200 square feet?

The city’s FAQ generally exempts buildings under 200 square feet from a building permit, but setbacks, zoning rules and easement restrictions still apply. Confirm your specific project before construction.

4. Is a Zoning Clearance Letter required before applying?

Some projects require zoning clearance first. Check the official Zoning Clearance Letter checklist and, where required, apply through CityInspect’s Planning & Zoning module before the building-permit stage.

5. How much does a building permit cost in American Fork?

The cost depends on construction valuation, plan review and applicable fees. Standard residential plan review is listed as 65% of the permit fee, while new residential submissions have a $1,000 upfront plan-review deposit.

6. How do I schedule a building inspection?

Open your issued permit in CityInspect, select the needed inspection and submit the request at least one working day ahead. Check your confirmation email for the assigned date and inspection window.

7. Are same-day building inspections available?

No. The city’s published inspection policy requires requests at least one working day ahead and states that same-day inspections are not offered. Confirm current scheduling rules with the department.

8. Can I prepare my own building plans?

Homeowners can generally prepare plans for personal projects, but plans must be drawn to scale and contain the required details. The department may require review or stamped drawings from a licensed engineer.

9. Which building codes apply in American Fork in 2026?

Utah’s July 2026 updates include the 2024 IBC, IPC, IMC, IECC, IFGC and IFC, plus the 2023 NEC. The 2021 IRC continues to apply to residential work, subject to state amendments.

10. What happens if construction begins without a permit?

American Fork may assess penalties for work without required permits, approvals or inspections. The adopted fee schedule includes additional unauthorized-construction fines that vary by residential or commercial project type.

Information verified: October 8, 2026. This independent guide summarizes American Fork City’s published department information, permits, fees and inspection rules. Government requirements can change, and individual projects may need additional approvals.