Beaverton Building Department 2026: Permits, Inspections & Services

Beaverton, Oregon | 2026 Permit Guide

Building Permits, Inspections & City Services

The City of Beaverton Building Division, part of the Community Development Department, handles building permit services, construction plan review and building inspections for properties under the city’s permitting authority.

To apply for a permit, check an existing application, pay fees or request an inspection, use the city’s CIVICS electronic permitting system. First confirm that your property is within Beaverton’s jurisdiction.

Open Official Permit Portal ↗ Building Division ↗

Beaverton Building Department: Contact & Hours

The city publishes the following Community Development Department contact information for applicants seeking building and development services.

Department

City of Beaverton
Community Development Department
Building Division

Permit Counter Address

12725 SW Millikan Way
4th Floor
Beaverton, OR 97005-1678

Permit Counter Hours

Monday–Thursday: 8:30 a.m.–4:30 p.m.
Friday and holidays: Closed
Pacific Time

These are the published Community Development permit counter details. Individual staff appointments, telephone availability and inspection operations may differ.

Which Office Issues Your Permit?

A Beaverton mailing address does not always mean a property is inside Beaverton city limits. Some nearby properties are in unincorporated Washington County, where county permitting services may apply.

Property LocationWhere to Start
Inside Beaverton city limits City of Beaverton Building Division and the CIVICS portal.
Unincorporated Washington County Washington County Building Services; phone 503-846-3470.
Uncertain boundary or jurisdiction Check the city’s Building in Beaverton resources and interactive map, or contact the permit counter with the property address.
Before applying: Confirm the property’s jurisdiction, not just its ZIP code. Building, land-use, utility and right-of-way approvals may involve different agencies even for the same project.

Building Permits & Services Available

The type of permit depends on the proposed work. The city separates building, planning and site-development applications so that projects can receive the appropriate reviews.

Permit or ServiceCommon Projects and Purpose
Building permits New buildings, additions, structural alterations, substantial remodeling and other regulated construction.
Electrical permits New circuits, service changes, wiring alterations and electrical equipment installations where permits are required.
Mechanical permits Heating, air-conditioning, ventilation and other regulated mechanical equipment or installations.
Plumbing permits Water supply, drainage, plumbing fixture installations and regulated piping alterations.
Planning / land use Zoning compliance, site use, setbacks, design review or other development approvals, depending on the proposal.
Site development Grading, erosion control, drainage, site utilities and related civil improvements where applicable.
Inspections and permit records Construction inspection requests, application tracking, permit payments and applicable final approvals.

Common homeowner projects: Decks, sheds, fences, patio covers, garages, basement conversions, solar installations, roofing work and accessory dwelling units may have different permit or zoning requirements. Some minor work may be exempt from a building permit but still subject to other rules. Confirm the specific exemption before beginning.

How to Apply for a Beaverton Building Permit

Beaverton uses the CIVICS platform for electronic building permit applications. The steps below explain how to start and manage a typical application.

  1. Confirm the location and permit type. Check that the project is within the city’s jurisdiction. Identify whether the work needs a building, trade, planning or site-development application.
  2. Prepare project information. Have the property address, applicant and contractor details, description of work, project valuation when requested, and applicable drawings or supporting documents ready.
  3. Open the official portal. Visit Beaverton CIVICS. Create a profile or sign in if the service requires an account.
  4. Start the application. Select the permit application function, choose the appropriate category, enter the property and project information, and attach documents requested for that application.
  5. Submit and monitor review. Save the confirmation or record number. Use the portal’s application lookup or dashboard to follow review progress and respond to requests for corrections or additional information.
  6. Pay and obtain approval. Pay assessed fees using the authorized city payment process. Wait for the applicable permit to be issued before starting work that requires approval, then follow the approved plans and inspection conditions.
Start or Track an Application ↗

Documents to Prepare

Requirements vary by project, but preparing these items early can prevent an incomplete application.

  • Project details: Property address, description and intended use of the work.
  • Site plan: Property lines, existing structures, proposed work, dimensions and setbacks when required.
  • Construction drawings: Floor plans, elevations, sections, structural information and relevant trade plans.
  • Applicant information: Property owner information, contractor credentials and any required authorization.
  • Other approvals: Applicable planning decisions, engineering documents, utility approvals or other agency reviews.

For a small trade permit, fewer documents may be necessary. New homes, commercial alterations and complex projects generally require more detailed plans. Consult the city’s Forms & Checklists section for available project-specific materials.

How to Schedule a Building Inspection

Approved construction work normally requires inspections at specified stages. Beaverton’s official inspection scheduling page directs applicants to CIVICS.

  1. Open the city’s Schedule Inspections page or the CIVICS inspection request screen.
  2. Locate the relevant permit using the record information and any required account credentials.
  3. Select the available inspection type and scheduling option associated with that permit.
  4. Enter or confirm the requested date, jobsite access instructions and contact details, as prompted.
  5. Submit the request and check for its confirmation or scheduled status.
Inspection timing: A requested date is not necessarily a confirmed appointment. Scheduling availability and cutoff times were not independently verified. Check the portal confirmation or contact the city before arranging contractors around an inspection.

Common Inspection Stages

InspectionWhen It Is Typically Needed
Footing / FoundationAfter required preparation and before concrete conceals the work.
FramingAfter structural framing is installed and ready for inspection.
Rough Electrical, Plumbing or MechanicalBefore regulated wiring, piping or equipment connections are concealed.
Insulation or Energy ComplianceAt the applicable stage before interior finishes cover the work.
Final InspectionAfter the permitted work is complete and required preceding approvals are obtained.

These are common construction inspection stages, not a universal Beaverton inspection checklist. The actual inspection requirements are determined by the permit and approved plans.

If an Inspection Does Not Pass

Review the inspector’s correction notes, complete the required repairs, and request a follow-up inspection through the applicable permit record. Do not cover rejected work before receiving any required clearance. Check whether reinspection fees or additional documents apply.

Beaverton Building Permit Fees in 2026

Beaverton does not have one flat permit price for every project. Applicable charges can depend on the type and valuation of construction, plan review, inspections, development-related requirements and other city fee provisions.

The city’s official Fee Information page provides these building-related resources:

  • Building Permit Fee Schedule B70-1108: Building permit charges and related fee provisions.
  • Building Valuation Data Table B70-1198: Valuation reference used where applicable to fee determination.
  • System Development Charges B70-1116: Potential development-related charges for qualifying projects.
  • Planning and site-development schedules: Separate charges when additional reviews or approvals are necessary.

2026 update: Beaverton states that new planning application fees took effect February 1, 2026. Those changes should not be mistaken for a single increase applying identically to every building permit. Use the applicable published schedule for your project.

View Official Fee Schedules ↗

For a project-specific estimate, have the work description, estimated construction valuation, square footage and relevant plans available when contacting the department. Confirm the amount assessed in your official permit record before paying.

Oregon Building Codes Applicable in 2026

Beaverton administers building regulations within Oregon’s statewide specialty-code framework. Several Oregon code editions changed in 2026, making the date and type of permit application especially important.

Code2026 Status
Residential 2026 Oregon Residential Specialty Code: Chapter 1 became mandatory October 1, 2026. Construction chapters have a phase-in allowing the 2023 or 2026 edition through March 31, 2027, subject to applicable requirements; the 2026 edition becomes mandatory April 1, 2027.
Commercial / Structural 2025 Oregon Structural Specialty Code: Mandatory April 1, 2026, following its phase-in period.
Electrical 2026 Oregon Electrical Specialty Code: Effective October 1, 2026.
Plumbing 2026 Oregon Plumbing Specialty Code: Effective October 1, 2026.
Mechanical 2025 Oregon Mechanical Specialty Code: Mandatory April 1, 2026, after its phase-in period.

Code applicability may also depend on the application date, project type, accepted code-selection provisions and relevant amendments. Check the Oregon Building Codes Division’s adopted codes before finalizing construction plans.

Common Permit Delays & How to Avoid Them

  • Wrong jurisdiction: Confirm city limits before submitting a Beaverton application.
  • Missing plans: Supply the required site, structural or trade documents with the initial submission.
  • Zoning issues: Check setbacks, intended property use and other land-use conditions before designing the project.
  • Unanswered corrections: Monitor the application record and respond to plan-review requests promptly.
  • Premature construction: Wait for permit issuance and schedule inspections before work is concealed.
  • Unverified payments: Use authorized payment options linked from the city’s website or confirmed by the department.

Official Beaverton Permit Resources

Frequently Asked Questions

1. Where is the Beaverton Building Department located?

The City of Beaverton Community Development permit counter is at 12725 SW Millikan Way, 4th Floor, Beaverton, OR 97005-1678. Call 503-526-2493 for department assistance.

2. Can I apply for a Beaverton building permit online?

Yes. The City of Beaverton provides the CIVICS electronic permitting system at prod.buildinginbeaverton.org for applications, permit records and related services.

3. What construction work requires a building permit in Beaverton?

New construction, additions, structural changes and certain electrical, mechanical and plumbing work generally require permits. Requirements and exemptions depend on the exact project and applicable codes.

4. Do I need a permit for a deck, shed or fence in Beaverton?

It depends on the structure’s size, height, location and other applicable rules. Even when a building permit exemption applies, zoning and setback requirements may still apply. Confirm the project details with the city.

5. What documents are needed for a Beaverton building permit?

Common requirements include property information, a project description, site plans, construction drawings and applicable contractor details. Additional structural, planning or engineering documents may be required.

6. How do I schedule a building inspection in Beaverton?

Use the city’s official Schedule Inspections page and its linked CIVICS inspection request service. Locate the permit, choose an available inspection type and submit the request.

7. How can I check my Beaverton permit status?

Open the Beaverton CIVICS portal and use the application lookup or account dashboard. Search using the applicable record details and review available application updates.

8. How much does a building permit cost in Beaverton?

Fees vary by project type, valuation, required reviews and applicable charges. The city publishes its Building Permit Fee Schedule and related valuation and development-charge documents on its Fee Information page.

9. What are the Beaverton permit counter hours?

The published permit counter hours are Monday through Thursday, 8:30 a.m. to 4:30 p.m. Pacific Time. The counter is closed Fridays and holidays.

10. Which building codes apply in Beaverton in 2026?

Oregon’s statewide specialty codes apply, including the 2025 structural code and the 2026 residential, electrical and plumbing code updates. The 2026 residential construction provisions have a phase-in ending March 31, 2027.

Information reviewed: October 9, 2026. This is an independent informational guide, not an official City of Beaverton publication. Permitting requirements, office information, fees and inspection availability can change. Final decisions are made by the responsible government authority.