Need a building permit or inspection in Bourne, Massachusetts? The Town of Bourne Building & Inspection Department handles building permit applications, construction inspections, zoning enforcement, and related building services. Applications are submitted through the town’s OpenGov portal, while inspections must be arranged directly with department staff or the appropriate trade inspector.
Bourne Building Department: Contact & Office Hours
The department is located inside Bourne Town Hall in Buzzards Bay. Contact the office before visiting if you need to speak with a specific inspector or the Building Commissioner.
| Official Department | Town of Bourne Building & Inspection |
|---|---|
| Location | Bourne Town Hall, Room 203 24 Perry Avenue Buzzards Bay, MA 02532 |
| Main Phone | 508-759-0600, Ext. 1512 |
| Administrative Hours | Monday–Friday, 8:30 AM–4:30 PM |
| Building Commissioner | Eleanor MacKay, Ext. 1334 |
| Building Inspectors | Ryan Flynn and Jeff Lehan, Ext. 1346 |
| Electrical Inspector | Ed Eacobacci, Ext. 1338 |
| Plumbing/Gas Inspector | Mike Maloney, Ext. 1337 |
| Official Website | Bourne Building & Inspection |
| Online Applications | Town of Bourne OpenGov Portal |
All office hours are Eastern Time. Inspector availability and holiday schedules can change; call before making a special trip.
What Does the Bourne Building Department Handle?
The department administers construction-related permitting and inspections and enforces applicable building regulations and local zoning bylaws. The Building Commissioner also acts as the town’s Zoning Enforcement Officer.
| Service | What You Need to Know |
|---|---|
| Building Permits | New construction, additions, alterations, structural work, demolition, and other regulated projects. |
| Electrical Permits | Electrical installations and modifications; permit applications must be made by appropriately licensed electricians. |
| Plumbing & Gas | Plumbing, gas equipment, and related installations requiring trade permits. |
| Mechanical Work | Applicable mechanical systems and equipment, subject to the relevant permit requirements. |
| Construction Inspections | Building, electrical, plumbing, and gas inspections at required construction stages. |
| Zoning Questions | Setbacks, permitted uses, coverage, and compliance with local zoning bylaws. |
| Occupancy & Completion | Applicable final approvals and occupancy documentation. |
| Complaints | Building-related complaints may be submitted through the online permitting system. |
How to Apply for a Bourne Building Permit Online
Bourne uses the OpenGov/Viewpoint Cloud system for building, electrical, plumbing, gas, and mechanical permit applications. You can create an account, submit an application, monitor its review, and access issued permit documents online.
- Open the official permit portal.
Visit bournema.portal.opengov.com. - Create or access your account.
Select the sign-up option, then choose the secure OpenGov registration process. Enter your email and create a password. An existing compatible OpenGov account can also be used. - Select the department.
Choose the Building Department from the available application categories. - Choose the appropriate permit.
Select the permit type matching your project, such as building, electrical, plumbing, gas, or mechanical work. - Review the permit requirements.
Read the category’s instructions before selecting Apply Online. Requirements vary by project. - Enter the project details.
Provide the property address, owner and applicant information, project description, contractor details, and other required fields. Complete all fields marked with an asterisk. - Upload required documents.
Attach plans, specifications, supporting approvals, and other requested materials in the formats accepted by the portal. - Submit and handle payment.
Follow the portal’s instructions and any payment notification. Bourne’s official guidance says payment instructions may be sent by email; the town FAQ also describes fees as due at application. Follow the instructions for your specific permit. - Monitor your application.
Sign in to review department comments, outstanding items, approval stages, and messages. - Download the approved permit.
Once issued, print the permit card and post it at the jobsite as instructed. Do not begin work requiring approval before the permit is issued.
What Should You Prepare Before Applying?
- Exact property address and applicant contact information.
- Clear description of the proposed construction or improvement.
- Relevant dimensions, plans, drawings, and site information.
- Contractor and licensing details when applicable.
- Estimated project cost or valuation if requested.
- Required zoning, health, fire, conservation, or other approvals.
- Any special documents listed for your specific permit category.
The portal’s permit checklist controls the exact submission requirements. Incomplete applications may require additional information before review can continue.
Bourne Building Permit Fees in 2026
Permit costs depend on the project and applicable fee category. Bourne publishes a municipal building-fee schedule with several fixed charges and project-based calculations.
| Building Department Fee Item | Published Amount |
|---|---|
| Commercial new buildings, additions, renovations | $0.75 per square foot in the published schedule |
| Commercial roof, siding, deck, or fence | $75 |
| Commercial demolition — partial | $150 |
| Commercial demolition — full | $250 |
| Commercial occupancy permit | $50 per unit |
| Commercial foundation permit | $100 per structure |
| Commercial permit extension | $100 for six months; one extension listed |
| Building reinspection/additional inspection | $65 |
| Paper application assistance | $25 |
| Large-plan scanning assistance | $5 per page where applicable |
These amounts come from the town’s published building-fee document marked effective January 1, 2023, with an updated version dated July 27, 2023. They are not a guarantee of the final 2026 charge. Confirm the current amount and any applicable surcharges with the department before payment.
Residential permit costs: A single verified flat fee cannot be given for all residential construction. Your permit category, valuation, dimensions, and other requirements may affect the total. Check the town’s Building & Inspection FAQs and the official portal for project-specific fees.
Fire Department fees are separate. For example, the Fire Department publishes a $50 single-unit smoke/CO inspection fee and a $50 residential plan-review fee for qualifying new construction or additions. These are not general building-permit charges. See the Fire Department fees and inspection page.
How to Schedule Building Inspections in Bourne
Do not request building inspections through OpenGov. The town specifically directs applicants to communicate with department administrators or inspectors to schedule inspections.
- Identify the inspection needed. Determine whether it is a building, electrical, plumbing, gas, or related inspection.
- Have your property address and permit number ready. This helps staff identify the correct permit, especially when multiple permits exist at one address.
- Contact the correct person. Call the Building Department at 508-759-0600, Ext. 1512, for building inspection assistance. Contact trade inspectors directly for electrical, plumbing, or gas scheduling.
- Get an appointment confirmation. Do not assume a voicemail request has been accepted. An inspector or department representative must confirm the arrangement.
- Prepare the work for inspection. Keep the approved plans and permit available, and ensure the relevant construction stage is accessible before the inspector arrives.
Inspector Contacts and Scheduling Windows
| Inspection Type | Contact / Published Availability |
|---|---|
| Building | Ext. 1512 for administration; building inspectors Ext. 1346. Full-time inspector office hours Monday–Friday, 8:30–10:30 AM. |
| Part-time Building Inspector | Tuesday and Thursday, 8:30–10:30 AM office hours. |
| Electrical | Ext. 1338. Monday, Wednesday, Friday, 8:30–9:30 AM office hours. |
| Plumbing / Gas | Ext. 1337. Monday and Wednesday, 8:30–9:30 AM office hours. |
The department generally conducts building inspections after morning office hours, with an indicated field window extending into the afternoon. Electrical inspections are also generally scheduled after morning office hours. The town cannot guarantee narrow arrival windows for these inspections.
If an inspection fails, obtain the correction requirements, complete the necessary work, and arrange the required follow-up inspection. Additional fees may apply.
Which Projects Need Permits in Bourne?
Whether a project needs a permit depends on its scope, construction details, and applicable building and zoning rules. Use this overview before applying.
| Project | What to Check |
|---|---|
| New home or addition | Building permit, construction plans, zoning compliance, and any separate trade or site approvals. |
| Kitchen or bathroom remodel | Building permit applicability and separate electrical, plumbing, or gas work. |
| Deck or porch | Structural requirements, setbacks, height, attachments, and permit applicability. |
| Shed or accessory structure | Size, location, setbacks, foundations, and the town’s shed-specific guidance. |
| Fence | Height, location, zoning restrictions, and the town’s fence guidance. |
| Swimming pool | Both Building and Health Department permits as directed by Bourne, plus applicable safety requirements. |
| Solar installation | Building and electrical requirements and mandatory electrical inspection stages. |
| Demolition | Demolition approval and any additional safety, utility, or environmental requirements. |
| Accessory dwelling unit | Building Commissioner review plus planning and health requirements where applicable. |
For sheds, pools, and fences, the town publishes specific materials through its official FAQ directory. Check the applicable document before designing or purchasing materials.
Bourne Zoning, Flood Zones & Other Local Approvals
Building-code compliance does not automatically mean a project meets Bourne’s local land-use rules. Depending on the site, applicants may also need to consider zoning setbacks, lot coverage, coastal or flood-related conditions, conservation approvals, or other town requirements.
Important Bourne-Specific Checks
- Zoning and setbacks: Confirm allowed uses, building placement, lot coverage, and dimensional requirements with Building & Inspection.
- Flood-prone or coastal properties: Ask about applicable flood-zone construction requirements and whether other agency reviews are necessary.
- Wetlands: Projects affecting regulated resource areas may need Conservation Commission review in addition to building permits.
- Buildings over 75 years old: The town notes that certain older buildings may require Historical Commission review.
- Accessory dwelling units: Bourne advises applicants to consult the Building Commissioner and also speak with Planning and Health officials.
- New lots: Since January 2020, the building department has not independently determined whether a lot is buildable. The town describes a land-use lawyer’s buildability letter process for applicable lots.
Review Bourne’s official Regulations & Information for local guidance on accessory dwelling units, lot coverage, buildability, and related rules.
Building Codes Applicable in Bourne in 2026
Bourne enforces the Massachusetts State Building Code, 780 CMR, together with applicable state requirements and local zoning bylaws.
Massachusetts’ 10th Edition Building Code became effective October 11, 2024. After the transition period ended June 30, 2025, the 10th Edition became the applicable code for new applications. It incorporates amended versions of 2021 International Codes.
- Residential construction: Applicable 780 CMR residential provisions and Massachusetts amendments.
- Commercial construction: Applicable 780 CMR base-code provisions.
- Electrical work: Massachusetts electrical-code requirements.
- Plumbing and gas: Applicable Massachusetts plumbing and fuel-gas regulations.
- Energy efficiency: Applicable Massachusetts energy-code requirements, including any locally adopted stretch or specialized provisions.
- Fire protection: Applicable Massachusetts fire regulations and any required Bourne Fire/Rescue approvals.
Use the official Massachusetts 10th Edition Building Code and Massachusetts Energy Code guidance. Confirm Bourne’s applicable municipal energy-code status before submitting energy-compliance documents.
Check a Permit Status or Request Building-Related Records
If you already submitted an application, the fastest starting point is your OpenGov account.
- Visit the Bourne OpenGov portal.
- Sign in with the account used for your application.
- Open your submitted application or permit record.
- Review its progress, department comments, missing documents, and approval steps.
- Upload corrections or respond to requests through the available workflow.
- Download the permit when approved and issued.
Searching for someone else’s permit? Public access may differ from applicant account access. Contact the Building Department with the property address and ask which records are publicly available and how to obtain them. Do not assume every historical permit is searchable online.
Common Permit Problems & Practical Solutions
| Problem | What to Do |
|---|---|
| Application remains under review | Check OpenGov for unresolved comments or missing approvals. Contact the office with your application number if clarification is needed. |
| Wrong permit type selected | Ask the department whether the existing application can be corrected or a new application is required. |
| Plans rejected or revisions requested | Review the department’s comments and submit corrected documents through the specified application workflow. |
| Inspection appointment not confirmed | Speak directly with the appropriate inspector or administrative staff. A voicemail alone is not confirmation. |
| Unsure about zoning compliance | Contact Building & Inspection before spending money on final construction drawings or site work. |
| Project needs fire or conservation approval | Coordinate the applicable separate review early rather than waiting until building-permit issuance. |
Official Bourne Permit & Government Resources
- Building & Inspection Department — contact information, inspection scheduling, and department services.
- OpenGov Permit Portal — applications, permit status, document uploads, and permit records.
- Online Permit Application Guide (PDF) — account setup and application instructions.
- Town Building FAQs — sheds, pools, fences, electrical permits, and special project guidance.
- Regulations & Information — zoning-related forms, ADUs, and property restrictions.
- Fire Permits, Inspections & Fees — separate fire-safety approvals and related costs.
- Massachusetts State Building Code — adopted code editions and official state guidance.
For projects in other Massachusetts municipalities, consult our Attleboro building permit guide or Beverly building permit guide. Each office has separate application and inspection arrangements.
Frequently Asked Questions
1. Where is the Bourne Building Department located?
The department is in Bourne Town Hall, Room 203, at 24 Perry Avenue, Buzzards Bay, MA 02532. The main telephone number is 508-759-0600, Ext. 1512.
2. How do I apply for a building permit in Bourne?
Go to bournema.portal.opengov.com, create or sign in to your account, choose the Building Department, select the relevant permit, complete the application, upload required documents, and follow the payment and review instructions.
3. Can I schedule a Bourne building inspection online?
No. Bourne instructs applicants to arrange building inspections directly with department staff. Call 508-759-0600, Ext. 1512. Electrical, plumbing, and gas inspections must be arranged with the appropriate trade inspector.
4. What are the Bourne Building Department office hours?
Administrative assistance is generally available Monday through Friday from 8:30 AM to 4:30 PM. Individual inspectors have separate morning office schedules and perform field inspections during other hours.
5. How much does a building permit cost in Bourne?
Fees depend on the permit type and project. The town’s published schedule includes project-based charges and fixed fees for certain activities. Review the applicable application and confirm the current fee with Building & Inspection before paying.
6. Do I need a permit for a shed, deck, or fence in Bourne?
Permit requirements depend on the structure’s dimensions, location, construction, and applicable building and zoning rules. Bourne publishes specific shed and fence guidance. Ask the department about your proposed deck or other structure before starting work.
7. Who applies for electrical permits in Bourne?
The town states that only licensed electricians may apply for electrical permits. The electrician must coordinate required inspections directly with the Electrical Inspector at 508-759-0600, Ext. 1338.
8. How do I check the status of my Bourne permit?
Sign in to your OpenGov account and open the relevant application. You can review processing stages, department comments, requested corrections, and issued documents. Email notifications may also be sent during review.
9. Which building code applies in Bourne in 2026?
Massachusetts’ 10th Edition State Building Code, 780 CMR, applies to new building-permit applications in 2026, together with relevant state requirements and local regulations. Confirm any additional municipal energy, zoning, flood, or other provisions for your property.
10. Can I start construction before my Bourne permit is approved?
Do not begin construction that requires a permit until the permit has been issued. After approval, print and display the permit as instructed, follow the approved plans, and arrange inspections at the required stages.
Information reviewed: October 9, 2026. This independent guide summarizes publicly available government information. USBuilding.org is not affiliated with the Town of Bourne. Requirements, staff assignments, schedules, and fees may change. The responsible government authority makes final permitting decisions.