Cedar City Building Permits & Inspections: 2026 Quick Guide
The Cedar City Building & Zoning Department handles local building permits, plan review, construction inspections and related zoning services for projects within Cedar City, Utah. Building permit applications are submitted online through the City’s permit system. Before applying, confirm that the project address is actually within Cedar City’s jurisdiction and prepare the documents required for your permit type.
Cedar City, UT 84720
When Do You Need a Building Permit in Cedar City?
Cedar City states that a permit is generally needed when work involves structural changes, electrical, plumbing or mechanical systems, changes to walls or floors, or a change in how a building or space is used.
| Project | Cedar City guidance |
|---|---|
| New residential or commercial building | Building permit required. |
| Home remodel | A permit is required for regulated remodeling work. |
| Finishing a basement | A building permit is required. |
| Commercial renovation | Permitting applies when layouts, plumbing, electrical or mechanical systems are changed. |
| Change of occupancy/use | Permit review applies, such as converting office space to a restaurant or creating certain dwelling spaces. |
| Solar PV installation | Permit required. |
| Electric or gas meter installation/upgrade | Permit required. |
| Mechanical equipment replacement or upgrade | Permit required. |
| Retaining wall over 4 feet | Permit and engineered plans are required. |
| Nonstructural cement flatwork | The City states that a permit is not required when the flatwork is not structural. |
| Fence 6 feet or less | No building permit is required, but zoning, location and setback rules still apply. |
| Accessory structure | Structures over 200 sq. ft., more than one story, or involving footings, foundations or regulated utilities may require a permit. |
Cedar City Permit Types & What to Prepare
Cedar City’s published permit document guide identifies multiple permit categories. The online portal also provides descriptions to help applicants choose the correct permit type.
| Permit category | Typical required information or documents |
|---|---|
| New residential construction | Site plan, architectural plans, stamped structural plans, geotechnical documentation, prairie dog clearance when ground is disturbed, energy compliance documentation and owner-builder form when applicable. |
| Addition / accessory building | Site plan, architectural and structural plans, applicable geotechnical and prairie dog documentation, energy compliance for conditioned spaces and owner-builder documentation when applicable. |
| Commercial | Site plan, civil, architectural, mechanical, plumbing, electrical and structural information, geotechnical documentation, applicable energy documents, signed permit application and other project-specific approvals. |
| Residential remodel | Existing/proposed floor plan, architectural information, structural details when required and energy documentation when converting or conditioning space. |
| Demolition | Utah state demolition approval, signed City permit application and proof of ownership may be required before demolition proceeds. |
| Pool | Site plan showing property-line and structure distances, required fencing/gates, pool specifications, electrical details and applicable ground-disturbance documents. |
| Retaining wall | Site plan, geotechnical information, structural engineering and applicable ground-disturbance clearance. |
| Solar | Plans, structural engineering, module/inverter/mounting specifications, rapid-shutdown information, electrical panel photos and meter-upgrade information when applicable. |
| Gas / electric meter | Site plan identifying meter location; gas work also uses the City’s Gas Clearance Form. |
| Tenant improvement | Site/location plan, architectural plans with code analysis, energy documentation, structural information and signed permit application. |
| Sign permit | Sign worksheet, site plan, design and dimensions. Pole and monument signs require Project Review before permit issuance. |
Download Cedar City’s current forms, checklists and guides from the official Building Permit Forms & Guides page. The City’s detailed Permit Document List is especially useful before uploading plans.
How to Apply for a Cedar City Building Permit Online
Cedar City requires building permit applications to be submitted online. The City’s permit guide describes four main application sections: property details, company information, building information and attachments.
-
Confirm the property is in Cedar City’s jurisdiction.
Use the actual project address. An application can be rejected if the address is outside the City’s jurisdiction. -
Create your permit account.
Open the official registration page. Enter your email, name and phone number and complete registration. -
Select the correct permit type and complete property information.
Enter the address, subdivision information when applicable, zone, parcel details, project scope and contractor/company information requested by the portal. -
Add contractors and design professionals.
Applicable permits generally require properly licensed contractor information before issuance. Residential owners performing qualifying work themselves may need the City’s notarized Owner Builder Certification. -
Upload documents as PDFs.
Keep the site plan, architectural plans and structural pages separated where the portal requests separate document categories. Complete every required field and upload each required attachment. -
Submit and digitally sign.
After successful submission, the application moves through portal stages. If the City rejects the submittal for missing documents, jurisdiction problems or other deficiencies, correct the listed issue and resubmit. -
Monitor plan review and pay applicable fees.
Use the Cedar City permit portal to view associated permits, upload requested documents, check status and manage inspections after issuance.
Residential submittal checklist
- Actual project address on permit documents.
- Digital architectural plans.
- Separate site plan.
- Stamped structural plans where required.
- Geotechnical data/pre-construction documentation for qualifying ground disturbance.
- Prairie dog clearance when applicable to ground disturbance.
- Signed energy-code compliance documentation for applicable conditioned spaces.
- Water acquisition / impact-fee documentation when applicable.
- Notarized owner-builder documentation when applicable.
Commercial submittal checklist
- Actual property address on all plans and documents.
- Digital site, civil, architectural, mechanical, plumbing, electrical and structural information as applicable.
- Geotechnical and prairie dog documentation when applicable.
- Energy-code compliance documentation.
- Signed building permit application.
- Notice Criteria documentation where applicable.
- Water acquisition, lease, flood elevation or easement documents when the project requires them.
- A separate permit application for each separate building.
Commercial Projects: Project Review Comes First in Some Cases
Cedar City requires Project Review before permit issuance for certain projects, including new commercial buildings, pole signs, monument signs and tenant improvements involving a change in building-use classification.
- Prepare a digital site plan.
- Complete the Project Review application.
- Complete the Project Review checklist as a separate document.
- Submit the package by the stated deadline.
- Attend Project Review when required.
- After completing the review step, submit the building permit through the online permit portal.
Check the current schedule and forms on the official Cedar City Project Review meeting page.
Cedar City Building Permit Fees in 2026
Cedar City’s consolidated fee schedule was updated in September 2026. Building permit cost is not a single flat fee for all projects; valuation, plan review, trade work, impact fees and project-specific charges can change the total.
| Building Department fee item | 2026 published amount / method |
|---|---|
| Plan review | 30% of building permit fee |
| Utah State fee | 1% of building permit fee |
| Remodel valuation | $50 per sq. ft. for fee-calculation valuation |
| Basement finish valuation | $50 per sq. ft. |
| Tenant improvement valuation | $50 per sq. ft. |
| Electrical service / meter work valuation | $50 |
| Mechanical work valuation | $50 |
| Plumbing work valuation | $50 |
| Inspection not part of a building permit | $50 |
| Reinspection | $50 |
| Revised plan review | $50 per hour |
| Sign permit | $25 |
| Excavation permit | $25 |
Building permit calculation table
| Total valuation | Published building permit calculation |
|---|---|
| $1–$500 | $24 |
| $501–$2,000 | $24 for the first $500, plus $3 for each additional $100 or fraction. |
| $2,001–$40,000 | $69 for the first $2,000, plus $11 for each additional $1,000 or fraction. |
| $40,001–$100,000 | $487 for the first $40,000, plus $9 for each additional $1,000 or fraction. |
| $100,001–$500,000 | $1,027 for the first $100,000, plus $7 for each additional $1,000 or fraction. |
| $500,001–$1,000,000 | $3,827 for the first $500,000, plus $5 for each additional $1,000 or fraction. |
| Over $1,000,000 | $6,387 for the first $1,000,000, plus $4 for each additional $1,000 or fraction. |
Review the current Cedar City Consolidated Fee Schedule before budgeting a project.
How Cedar City Building Inspections Work
An active building permit is required to request City building inspections. Cedar City schedules inspection requests through the online permit portal and does not offer same-day building inspections.
How to request an inspection
- Sign in to the permit portal.
- Open the active permit associated with your account.
- Select the required inspection type.
- Submit the request by 5:00 p.m. on the business day before the desired inspection.
- Select an available AM or PM block. Cedar City notes that the requested time block is not guaranteed.
- Use the inspector-notes field for work-order numbers, call-ahead requests or important site instructions.
Information to have ready
- Building permit number.
- Project address.
- Contact name and telephone number.
- Inspection type.
- Requested date and general time.
- Gas Clearance Form uploaded for applicable gas-related inspections.
- Rocky Mountain Power work-order number for applicable power inspections.
- Concrete pour time in inspector notes, with adequate inspection access before the pour.
Cedar City’s published inspection reference guide covers common stages such as footing, underground utilities, foundation, roof/shear, rough mechanical, rough plumbing, rough electrical, gas piping, framing, insulation, lath, drywall/fire assemblies, shower pan, permanent power and final inspection. Because the reference PDF is older, use it as a preparation aid and follow the current adopted codes, approved plans and inspector instructions for the actual project.
Open Cedar City’s Building Inspection Reference Guide.
Cedar City Building Codes in Effect for 2026
Cedar City publishes its current adopted-code list separately from the permit process. Do not assume every code book uses the same edition year.
| Code | Published adopted edition |
|---|---|
| National Electrical Code | 2023 NEC |
| International Residential Code | 2021 IRC |
| IRC Appendix Q | 2021 IRC Appendix Q |
| International Building Code | 2024 IBC |
| International Fire Code | 2024 IFC |
| International Plumbing Code | 2024 IPC |
| International Mechanical Code | 2024 IMC |
| International Fuel Gas Code | 2024 IFGC |
| Residential energy provisions | 2021 IECC residential provisions with Utah State Amendments |
| Commercial energy provisions | 2024 IECC commercial provisions |
| International Existing Building Code | 2024 IEBC |
| Accessibility standard | 2009 ICC/ANSI A117.1 |
Check the City’s Current Adopted Codes page before finalizing plans because code editions and state amendments can change.
Local design conditions worth checking early
Cedar City’s published building-design page identifies local design considerations including a 30-inch frost depth, wind design information, seismic criteria and site-specific snow-load considerations. Floodplain location can also affect documentation and design.
These values are not a substitute for project-specific engineering. Use the approved plans, current code, site conditions and the requirements of the design professional or Building Department.
Check Permit Status or Search Issued Permits
For your active permit
Sign in to the Cedar City permit portal. Applicants and authorized project contacts can use the portal to view associated permits, upload documents, follow the application stage and request inspections.
For permits issued at a location or during a date range
Cedar City’s FAQ directs users to Utah’s State Construction Registry for broader permit searches. Select Cedar City as the issuing municipality, add a date range if needed, and submit the search. Availability of record details can depend on the registry’s current system and access rules.
Start from Cedar City’s Building & Zoning Quick Links and choose Permitted Projects in State Construction Registry.
Cedar City Building Department Contact & Official Resources
| Official department | Cedar City Building & Zoning Department |
|---|---|
| Address | 10 N. Main St., Cedar City, UT 84720 |
| Building Department phone | (435) 865-4519 |
| Listed City office hours | 8:00 a.m.–5:00 p.m. |
| Official Building & Zoning page | cedarcityut.gov/129/Building-Zoning |
| Permit registration | Create an account |
| Permit login | Cedar City permit portal |
| Forms and guides | Building Permit Forms & Guides |
Cedar City Building Department FAQs
1. Where do I apply for a Cedar City building permit?
Building permit applications are submitted through Cedar City’s online permit system. New applicants should create a CityInspect account and then complete the applicable permit application online.
2. What types of work require a building permit in Cedar City?
Permits generally apply to new construction, structural work, regulated electrical, plumbing and mechanical changes, occupancy changes, solar installations, meter work and other regulated projects. Project-specific exemptions and zoning rules still need to be checked.
3. Do I need a permit for a fence in Cedar City?
Cedar City states that a building permit is not required for a fence 6 feet high or lower. Zoning, setbacks and location restrictions still apply, and taller fences should be discussed with Building & Zoning.
4. Does a shed or detached garage require a Cedar City permit?
It depends on size and construction. Accessory structures over 200 square feet, more than one story, or involving footings, foundations, electrical, plumbing or mechanical systems may require a permit. Confirm the project’s zoning requirements before construction.
5. When does a retaining wall require a permit?
Cedar City states that retaining walls over 4 feet, measured from the bottom of the footing to the top, require a permit and engineered plans.
6. How far in advance must I schedule a Cedar City building inspection?
Request the inspection through the permit portal by 5:00 p.m. on the business day before the desired inspection date. Cedar City does not offer same-day building inspections.
7. How much is a Cedar City building permit?
The amount depends on project valuation and applicable plan-review, state, trade, impact and development fees. Cedar City’s 2026 fee schedule lists plan review at 30% of the building permit fee and the Utah State fee at 1% of the building permit fee, with other charges applying when relevant.
8. What documents are commonly required for a new residential permit?
Typical residential documents include a site plan, architectural plans, stamped structural plans where required, geotechnical information, applicable prairie dog clearance, energy-code documentation and owner-builder paperwork when applicable.
9. What building codes does Cedar City use in 2026?
Cedar City’s published list includes the 2021 IRC, 2024 IBC, 2024 IFC, 2024 IPC, 2024 IMC, 2024 IFGC, 2023 NEC, applicable 2021/2024 IECC provisions, 2024 IEBC and 2009 ICC/ANSI A117.1.
10. How can I check my permit status or search Cedar City permit records?
Use the Cedar City permit portal for an application or permit associated with your account. For broader issued-permit searches by municipality or date, Cedar City directs users to the Utah State Construction Registry through its official Building & Zoning links.
More Building Department Guides
USBuilding.org is an independent informational resource and is not affiliated with Cedar City government. Permit requirements, fees, meeting schedules and adopted codes can change; use the official links above when completing the final application, payment or inspection request.