Charlevoix County Building Permits, Inspections & Official Services
If you are planning a new home, addition, deck, garage, remodel, roof replacement, plumbing job, electrical work, HVAC installation or another construction project in Charlevoix County, the main construction-code office is the Charlevoix County Department of Building Safety.
The important part is knowing the order in which approvals are needed. In many cases, you should not start by filling out a building permit. You may first need zoning approval from the city or township where the property is located, and projects involving a private well, septic system, soil disturbance, wetlands or a driveway can require additional approvals.
Charlevoix County Building Department Contact Information
| Service | Current information |
|---|---|
| Official department | Charlevoix County Department of Building Safety |
| Address | 13513 Division Street, Charlevoix, MI 49720 |
| Phone | 231-547-7236 |
| Fax | 231-547-7250 |
| buildingsafety@charlevoixcounty.org | |
| Office hours | Weekdays, 7:00 a.m. to 4:00 p.m. |
| Building Official | Kevin Schlickau |
| Official department page | Charlevoix County Building Safety |
| Online services | Charlevoix County BS&A Online |
Does Charlevoix County Handle Permits Inside the Cities?
Yes. This is one detail that can save homeowners a lot of confusion. Michigan’s statewide construction-code jurisdiction list identifies Charlevoix County as the building, electrical, mechanical and plumbing enforcing agency for Charlevoix County itself as well as Boyne City, the City of Charlevoix, East Jordan, the Village of Boyne Falls and the listed townships in the county.
That does not mean every approval comes from the county. Local zoning remains important. For example, a property inside the City of Charlevoix may need a zoning permit from the city’s Planning and Zoning Department before the county can issue the related construction permit.
Projects Commonly Covered by Building Permits
The county’s current building permit application includes a broad range of construction work. The exact permit requirements depend on the scope of the project, but the application specifically provides for projects such as:
- New residential or commercial buildings
- Home additions
- Structural remodeling
- Foundation work
- Manufactured or pre-manufactured structures
- Mobile-home setup
- Building demolition
- Relocation of a structure
- Decks and porches
- Roofing and siding
- Garages and pole buildings
- Solar-array-related construction
- Other structural alterations
Separate permits may also be required for electrical, plumbing and mechanical/HVAC work. One project can therefore have several active permits. A new house, for example, normally involves the building permit plus electrical, mechanical and plumbing permits and may also involve zoning, septic, well, driveway or environmental approvals.
Before Applying: Get These Items Ready
A common reason permit applications slow down is not the construction plan itself—it is missing supporting information. The county’s published building requirements identify several items that may be needed before plan review can be completed.
| What to prepare | Why it matters |
|---|---|
| Correct job-site address | The application requires the actual construction location. Rural addresses should be entered accurately. |
| Property tax ID / parcel number | The current county application requires the property tax identification number. |
| Zoning approval | Local zoning requirements must be satisfied before many construction permits can proceed. |
| Owner and contractor details | Provide contact information and applicable Michigan builder or trade-license information. |
| Project description | Explain clearly what is being built, altered, demolished or installed. |
| Construction drawings | Plans must provide enough information for the department to verify code compliance. |
| Septic and well approval | May be needed where the property does not use municipal sewer and water. |
| Soil-erosion approval | Can apply when earth disturbance is close to a lake or stream or exceeds the applicable acreage threshold. |
| Other site approvals | Wetlands, critical dunes, high-risk erosion, driveway or similar site conditions can trigger separate reviews. |
How to Apply for a Charlevoix County Building Permit
- Identify the city or township. Do not rely only on the postal mailing address. Confirm which local government controls zoning for the parcel.
- Check zoning first. Contact the city’s or township’s zoning administrator and obtain the required zoning permit or approval.
- Check septic and well requirements. If the property is not connected to municipal water and sewer, determine whether approval is required from the Health Department of Northwest Michigan.
- Check environmental and site permits. Projects disturbing more than one acre of earth, or qualifying work within 500 feet of a lake or stream, can require soil-erosion approval. Wetlands, critical dunes and high-risk erosion areas can involve additional agencies.
- Prepare plans. Include the site layout, floor plan, foundation information, structural details and elevations applicable to your project.
- Open the county’s permit service. Visit Charlevoix County BS&A Online and select Apply for a Permit, or use the county’s downloadable permit application when appropriate.
- Enter the property information carefully. Use the correct address, municipality/township and tax ID number.
- Upload or submit required documents. Include supporting approvals and plans. Incomplete applications can be returned or held until missing information is supplied.
- Wait for review and permit issuance. Do not treat submission as authorization to start construction.
- Keep the approved permit and plans available. Follow the inspection sequence and do not cover work that still needs to be inspected.
Building Plans: What the County May Expect
Charlevoix County’s residential construction guidance is more detailed than a simple floor-plan requirement. Depending on the project, plans may need to show:
- A site plan with distances from proposed construction to property lines and other structures.
- Foundation dimensions, footing sizes and structural support information.
- Floor plans showing room use and dimensions.
- Building elevations for the front, sides and rear.
- Wall sections and construction details.
- Roof framing information and roof pitch.
- Window, door and emergency-egress information.
- Smoke and carbon-monoxide detector locations.
- Stair, handrail and guardrail details.
- Truss drawings and required bracing information when engineered trusses are used.
- Energy-code information where applicable.
The county’s guidance says drawings should be clear, readable and drawn to scale. New residential homes may also require mechanical Manual J and Manual S calculations.
For larger or more complex work, professionally sealed drawings can be required. The county’s current materials identify sealed plans for commercial work and certain larger residential projects. If your residence approaches or exceeds 3,500 square feet, or the design contains unusual structural elements, confirm the plan-review requirements before paying for final drawings.
Building, Electrical, Plumbing and Mechanical Permits
| Permit | Typical work |
|---|---|
| Building | New buildings, additions, remodeling, structural alterations, decks, porches, garages, demolition, roofing and similar work. |
| Electrical | New wiring, service equipment, circuits, panels, generators, electrical alterations and related installations. |
| Plumbing | Fixtures, water piping, drains, sewer connections, water heaters and other regulated plumbing installations. |
| Mechanical | Furnaces, air conditioning, duct systems, boilers, gas piping, ventilation and similar HVAC/mechanical work. |
A building permit does not automatically replace the required trade permits. If a kitchen addition includes new wiring, plumbing and HVAC work, those systems may need their own permits and inspections before the building rough inspection can be approved.
Homeowner Permits vs. Contractor Permits
The county’s published requirements allow a homeowner to obtain certain permits when the homeowner is actually performing the work. This should not be used to avoid Michigan contractor-licensing requirements for work that is actually being performed by another person.
Licensed contractors should provide the required license and business information. The Building Safety Department states that a copy of the residential builder’s license may be requested for its records.
How Inspections Work
Getting the permit is only the beginning. The permit holder is responsible for requesting inspections at the correct stages of construction.
The county’s general building requirements ask permit holders to call ahead when work is ready. For planning purposes, allow at least 24 hours and do not pour concrete, backfill, install insulation or cover rough work until the required inspection has taken place.
| Inspection | Typical timing |
|---|---|
| Footing | After excavation, forms and reinforcing are ready but before concrete is poured. |
| Foundation | After foundation walls and required reinforcement, waterproofing/dampproofing and drainage are ready, but before backfilling. |
| Electrical service | When service equipment such as the meter base and panel is installed and grounded. |
| Underground mechanical | Before underground ductwork, radiant tubing or process piping is covered or concrete is placed. |
| Underground plumbing | After required underground piping/trenches are installed but before backfilling. |
| Trade rough inspections | Electrical, plumbing and mechanical rough work should be inspected before it is concealed. |
| Building rough | Generally after applicable trade rough approvals and before insulation or interior finishes conceal the work. |
| Insulation | After rough approval and before interior finish materials are installed. |
| Final | After permitted work is completed and ready for final approval. |
For new homes, additions and garages, the county also publishes project-specific inspection stages such as pre-pour foundation reinforcement, pre-pour slab, pre-backfill, roofing/siding underlayment, rough framing, insulation and final inspection.
Decks and porches generally involve footing/open-hole inspection, rough inspection and final inspection. Pole buildings have their own footing, rough and final sequence.
When Should You Call for an Inspection?
The general county construction requirements say to call approximately 24 hours ahead and indicate that inspectors can be contacted between 7:00 a.m. and 8:30 a.m. Monday through Friday. Some published trade-permit forms also state that inspections can often be performed the same day when called in by 8:30 a.m.
Because workload, travel distance and project type can affect scheduling, the safest method is to request the inspection at least a business day in advance rather than assuming same-day availability.
Use 231-547-7236 for Building Safety inspection questions.
Final Inspection and Certificate of Occupancy
A final inspection matters. The county’s application places responsibility on the applicant for requesting all required inspections, including final occupancy approval.
For new buildings and work involving occupancy approval, do not assume that completing construction means the building can immediately be occupied. Required final inspections must be approved and the appropriate certificate of use and occupancy must be issued where applicable.
Permit Fees and Online Payments
Fees depend on the permit type and scope of work. Electrical, plumbing and mechanical applications use itemized schedules based on installations, equipment and inspections, while building fees depend on the type and value of construction.
As examples from county-published forms:
- The electrical permit application lists a non-refundable administrative fee and separate charges for equipment and inspections.
- The plumbing application similarly includes an administrative charge plus fixture/system and inspection fees.
- The county’s published residential roofing/siding application lists a residential permit amount of $120 and instructs commercial applicants to contact the department for pricing.
- County permit forms warn of an additional $100 fee for starting regulated work before obtaining the permit.
Because fee schedules can be updated independently of an older PDF, verify the current amount before sending payment. You can use the Charlevoix County BS&A portal to access available building-department payments and current records.
How to Search Charlevoix County Building Permit Records
You do not have to call the office just to check every permit record. Charlevoix County participates in BS&A Online, which provides a Building Department Record Search.
- Open Charlevoix County BS&A Online.
- Find the Building Department section.
- Select Building Department Record Search.
- Search using the available address, parcel number, name or building-record number fields.
- Open the matching record.
- Review the information available for the permit or property.
- If an older permit or document is missing online, contact Building Safety with the property address and known permit information.
This can be useful before buying a property, planning remodeling work or checking whether a previous addition appears in the department’s records.
Zoning Permit Comes Before the Building Permit in Many Cases
Charlevoix County Building Safety specifically identifies zoning approval as one of the items that may be required with the building permit application.
If the project is inside the City of Charlevoix, the city’s Planning and Zoning Department explains that zoning permits are used for construction, placement, alteration or movement of many buildings and structures. Its zoning approval is separate from the building permit issued by the county.
City of Charlevoix property owners can review the official City of Charlevoix zoning permit guidance.
If your project is in Boyne City, East Jordan, Boyne Falls or a township, contact that local zoning authority instead. The county can also help identify the zoning contact associated with the permit application.
Septic, Well, Soil Erosion, Wetlands and Driveway Approvals
A construction project can involve more than building and zoning. Check these issues before finalizing the permit packet:
- Septic and well: If the site is not served by municipal sewer/water, the county’s requirements direct applicants to obtain applicable approval from the Health Department.
- Soil erosion: The county identifies soil-erosion review for qualifying earth disturbance, including projects within 500 feet of a lake or stream or involving more than one acre of disturbed earth.
- Wetlands: Work affecting regulated wetlands may require state environmental review.
- Critical dunes/high-risk erosion: Lake Michigan-area properties may have additional environmental requirements.
- Driveway culverts: Projects affecting a county-road driveway or culvert can involve the Charlevoix County Road Commission.
These approvals are easy to miss, especially on vacant land. A beautiful set of house plans will not solve a septic, setback or protected-land issue, so check the site conditions before spending heavily on final construction documents.
Roofing and Siding Permits
Charlevoix County publishes a separate roofing and siding permit form. The published form requires basic property, owner and contractor information and identifies underlayment and final inspections.
If you are replacing a roof, do not assume it is exempt because the appearance will remain the same. Zoning approval and construction permits are different issues. A roof replacement may not require a local zoning permit when the roof height and structure are unchanged, while a building permit can still be required.
Do You Need a Permit for a Deck, Garage or Pole Building?
The county building application specifically includes decks, porches and pole buildings among project categories, and its inspection guidance provides separate inspection sequences for them.
For a deck or porch, be ready for footing/open-hole inspection before concrete is placed, followed by applicable rough and final inspections. Garage and pole-building projects can also require zoning setback approval before the building permit is issued.
Small accessory structures can have different zoning exemptions depending on the city or township. Do not use another municipality’s shed-size rule for your Charlevoix County property.
Building Codes Used in Charlevoix County in 2026
The county’s 2026 building permit application identifies the 2021 Michigan Building Code and the 2015 Michigan Residential Code. Michigan construction-code editions have been undergoing statewide updates, so code questions should be checked against current county and Michigan Bureau of Construction Codes information when designing a new project.
State information is available through the Michigan Bureau of Construction Codes.
If you are researching other Michigan permitting systems, our guides to the Ann Arbor building department, Birmingham building department, Bloomfield Township building department and Bloomfield Hills building department show why permit portals, inspection procedures and local zoning requirements can differ even within the same state.
Common Mistakes That Delay Charlevoix County Permits
- Starting construction before the permit is issued.
- Submitting an application without zoning approval.
- Using the mailing city instead of confirming the actual municipality or township.
- Leaving the property tax ID blank.
- Submitting unclear or incomplete construction drawings.
- Forgetting septic/well approval for a rural property.
- Ignoring soil erosion, wetland or critical-dune requirements.
- Failing to provide contractor-license information where required.
- Covering framing, wiring, piping or insulation before inspection.
- Finishing a project without requesting the final inspection.
A Simple Checklist Before You Start Construction
- Confirm the property address and parcel/tax ID.
- Identify the city or township.
- Check zoning setbacks and obtain zoning approval.
- Determine whether septic/well permits are needed.
- Check soil erosion, wetlands, dunes and driveway requirements.
- Prepare complete construction drawings.
- Choose the correct building and trade permits.
- Submit the application and supporting documents.
- Pay the applicable permit fees.
- Wait until the permit is issued before starting.
- Schedule each inspection before covering the work.
- Request final inspection and occupancy approval when required.
Top 10 FAQs About the Charlevoix County Building Department
1. Where is the Charlevoix County Building Department?
The Charlevoix County Department of Building Safety is located at 13513 Division Street, Charlevoix, Michigan 49720. The main phone number is 231-547-7236.
2. Can I apply for a Charlevoix County building permit online?
Charlevoix County’s BS&A Online service includes an Apply for a Permit option. Open the county’s BS&A page, choose the Building Department service and follow the available permit application steps. Downloadable county forms are also available for specific permit types.
3. Who handles building permits inside the City of Charlevoix?
Charlevoix County Department of Building Safety handles building, electrical, mechanical and plumbing code enforcement. The City of Charlevoix separately handles its local zoning approvals, so a city project can involve both offices.
4. Do I need zoning approval before getting a building permit?
Many projects do. The county identifies a valid zoning permit or approval as a potential required item in the building permit packet. Obtain zoning approval from the city or township responsible for the property.
5. How do I schedule a Charlevoix County building inspection?
Contact the Department of Building Safety at 231-547-7236 when the work reaches the required inspection stage. The county’s building requirements recommend calling ahead, and inspector-contact hours are generally listed as 7:00 to 8:30 a.m. on weekdays.
6. Can a homeowner pull their own permit in Charlevoix County?
The county’s published forms allow homeowners to obtain applicable permits when they are actually performing the work themselves. Licensing requirements still apply when regulated work is performed by contractors or tradespeople.
7. Is a permit required for roofing in Charlevoix County?
The county publishes a dedicated roofing and siding building permit application and identifies underlayment and final inspections. Confirm the current fee and requirements before starting the roof work.
8. How can I search Charlevoix County permit records?
Open Charlevoix County BS&A Online and select Building Department Record Search. The system provides search options for municipal building records, including address, parcel and record information where available.
9. What plans are needed for a residential building permit?
Depending on the project, the county may require a site plan, foundation plan, floor plans, structural and wall sections, elevations, roof-framing information and related construction details. Larger or unusual projects may require sealed professional plans.
10. What are the Charlevoix County Building Department hours?
The official Building Safety page lists weekday office hours from 7:00 a.m. to 4:00 p.m. Holiday schedules and temporary closures can change, so call 231-547-7236 before making a special trip.
Information note: Permit forms, fees, code editions and staff procedures can change. This guide explains the county’s published 2026 process and official resources, but project-specific requirements should be confirmed before construction begins.