Chatham County Building Permits, Inspections & Official Services
If your property is in unincorporated Chatham County, Georgia, building permits, construction plan review, inspections, zoning administration and several related services are handled through the Chatham County Department of Building Safety & Regulatory Services.
The first thing to check is jurisdiction. A Savannah mailing address does not automatically mean Chatham County issues your permit. Properties inside Savannah, Pooler, Garden City, Port Wentworth, Tybee Island, Thunderbolt, Bloomingdale or another incorporated municipality may use that city’s permitting office instead.
Chatham County Building Safety & Regulatory Services is located at 1117 Eisenhower Drive, Suite D, Savannah, GA 31406. The main number is 912-201-4300. The County’s current permit-forms page says completed applications are accepted Monday through Friday from 8:00 a.m. to 3:30 p.m. and are not accepted by fax or email.
| Service | What to Use |
|---|---|
| Building permit applications | Official Chatham County permit forms |
| Check whether a permit is required | County permit-required work list |
| Permit record/status search | Official Building Permit Search |
| Zoning forms | Chatham County Zoning Administration |
| Property, parcel and zoning research | SAGIS property map |
| Department contact | 912-201-4300 |
First, Make Sure Chatham County Is the Right Permit Office
This simple check can save you a wasted trip and a rejected application. Chatham County’s building ordinance generally applies to unincorporated areas of the county and to municipalities that have an agreement for county enforcement.
Use SAGIS to locate the parcel by address or Property Identification Number (PIN). The Metropolitan Planning Commission explains that SAGIS can show property and zoning information, but an online map should not be treated as the final legal zoning determination.
If the property is actually within Savannah city limits, use the City of Savannah Development Services Department. Savannah handles its own building permits and inspections through its city system.
What Work Requires a Chatham County Building Permit?
Chatham County publishes a fairly broad permit-required list. A permit may be needed even when the project feels small to a homeowner.
County guidance identifies permit requirements for work including new buildings, garages, carports, porches, decks, room additions, accessory and storage buildings, renovations, door and window replacement, structural beam or joist work, foundation repair, conversion of non-habitable areas to living space, interior partitioning, pools, fences, canopies, awnings, certain retaining walls, demolition, reroofing, antennas, exterior stairs and ramps, signs, storage tanks and parking lots.
Electrical, plumbing and mechanical work also generally requires permits unless the responsible inspection authority determines otherwise.
Retaining walls over 18 inches, excavation and fill that changes elevation near property lines can also trigger Engineering review. That detail matters in Chatham County because drainage, floodplain and coastal conditions can turn a seemingly basic project into a multi-department review.
How to Apply for a Chatham County Building Permit
- Confirm jurisdiction. Check that the property is in unincorporated Chatham County before preparing a county application.
- Find the parcel PIN and property details. Use your tax record or SAGIS. New-construction applications request the PIN, project address and flood-zone information.
- Choose the correct permit packet. Open the official permit forms page. Separate applications are available for new construction, additions, remodeling, roofing, fences, pools and spas, electrical work, plumbing, mechanical work, demolition, storage buildings, docks, signs and other project types.
- Collect outside approvals before submitting. Depending on the project, this can include Environmental Health, Public Works, Engineering or Metropolitan Planning Commission approval.
- Prepare the plans and supporting documents. The County’s new-construction packet calls for items such as site plans, construction drawings, energy-compliance documents, contractor licensing information and subcontractor signatures.
- Check the application for completeness. Chatham County specifically warns that incomplete applications may be returned rather than entering the normal permitting process.
- Submit the packet. The County’s current forms page directs applicants to 1117 Eisenhower Drive, Savannah, GA 31406. Published intake hours are Monday through Friday, 8:00 a.m.–3:30 p.m. It states that permit applications cannot be submitted by fax or email.
- Wait for issuance before beginning regulated work. Application submission is not the same as permit approval. Keep the issued permit and County-approved plans available at the project site.
Documents Commonly Needed for New Construction
The County’s residential/commercial new-construction packet is useful because it shows what often causes an application to be returned.
| Document or Approval | When It Matters |
|---|---|
| Signed permit application | Required to start the application. |
| Application checklist affidavit | Used to confirm that required supporting items are included. |
| Site plan | The County packet calls for two copies for new construction. |
| Construction drawings | New-construction packets call for two sets and a typical wall section. |
| REScheck or COMcheck | Energy-compliance documentation for applicable residential or commercial work. |
| Contractor and subcontractor information | State/local licensing documents and signed subcontractor information may be required. |
| Homeowner affidavit | Relevant when an eligible homeowner is performing work instead of using a general contractor. |
| Environmental Health approval | Required when the property has or will use a septic system. |
| Public Works approval | Listed for residential and commercial new construction. |
| Engineering approval | Important for flood-zone construction and applicable land-development work. |
| MPC approval | May apply to new commercial development and certain zoning situations. |
| Recorded plat or ZBA decision | Needed where the project or parcel circumstances require it. |
Project type changes the checklist. An addition, fence, dock, pool or reroofing job will not use exactly the same packet as a new commercial building.
Chatham County Building Permit Fees in 2026
A County permit document updated in 2026 publishes a plan-review fee of $2 per $1,000 of construction value. That plan-review amount is credited toward the building permit fee rather than added on top of it.
| Published Fee | 2026 County Reference |
|---|---|
| Residential building permit | $6 per $1,000 of construction value |
| Commercial building permit | $7 per $1,000 of construction value |
| Plan review | $2 per $1,000 of construction value; credited toward the permit fee |
| Permit-related reinspection | A $30 fee is identified in County material in specified reinspection situations |
| Safety inspection | County code lists $25 |
| Manufactured-home inspection | County code lists $50 |
Do not calculate your final invoice from these figures alone. Electrical, plumbing, mechanical, gas, pool, sign, dock and other permits can have separate charges, and project valuation rules or other reviews can affect the amount due.
What Happens After the Permit Is Issued?
Do not put the permit in a desk drawer. County guidance requires the permit to remain posted at the job site, protected and visible from the right-of-way while the permitted work is underway.
Keep the County-stamped approved drawings available at the site. If the approved design changes during construction, submit revised drawings for review rather than simply building from an altered set.
Chatham County Building Inspection Sequence
The exact inspections depend on the project, but the County’s current inspection-requirements document lays out a typical progression.
| Stage | What to Know |
|---|---|
| Zoning setbacks | Property lines and required setbacks must be identifiable. The site plan should remain at the job site. |
| Under-slab rough-ins | Electrical, plumbing, gas or HVAC components below concrete must be inspected before concrete covers them. |
| Footing / foundation / slab | Required inspection must pass before concrete is placed where applicable. |
| Subfloor | Must pass before framing begins. Flood-zone projects may require an Under Construction Elevation Certificate at this stage. |
| Sewer | Inspect before the sewer line is covered. |
| Electrical rough-in | Must pass before electrical work is concealed. |
| Plumbing top-out | Must pass before plumbing work is covered. |
| Gas / HVAC rough-in | Inspect before applicable ducts and systems are concealed. |
| Framing | Structural framing and applicable flood-resistance components are checked before concealment. |
| Insulation | Must be inspected before wall or ceiling coverings conceal it. |
| Trade finals | HVAC, gas, electrical and plumbing finals are completed as applicable. |
| Building final | Required inspections must be complete before the building final. |
| Certificate of Occupancy | The building final must pass before a County Certificate of Occupancy is issued where one is required. |
The County’s inspection document says a building should not be occupied without the required Certificate of Occupancy. Flood-zone projects also need applicable flood documentation and Engineering approval before the CO and electrical power release.
For current inspection scheduling instructions, call Building Safety & Regulatory Services at 912-201-4300 with the permit number, project address and inspection type ready. The County publishes the inspection sequence clearly, but the reviewed public pages do not provide one universal scheduling method for every permit type.
How to Search Chatham County Building Permits
You do not have to visit the office simply to look for an existing permit. The County’s Building Safety website links to its EnerGov/Tyler public permit-search system.
- Open the Chatham County Building Permit Search.
- Use the public search tools offered by the portal.
- Search using the permit or project information you have, such as the address or permit number.
- Open the matching record and review the available status or permit details.
- If the record is unclear, call 912-201-4300 before assuming a permit is closed, expired or approved for additional work.
This is especially useful when buying a home, checking whether an addition was permitted, following an active construction project or confirming that a permit has reached final approval.
Zoning Comes Before Building Approval
A structure can satisfy construction-code requirements and still violate zoning. Before designing an addition, detached garage, shed, fence, commercial conversion or new building, check permitted use, setbacks and other site restrictions.
The Metropolitan Planning Commission explains that the public can use an address or PIN in SAGIS to research zoning. For an official zoning determination or zoning-verification letter for unincorporated property, contact Chatham County’s zoning administration.
If your project needs a variance, rezoning, subdivision approval or special-use action, handle that early. Waiting until the building-permit packet is ready can cause avoidable redesign work.
Flood Zones Are a Major Part of Building in Chatham County
Flood review is not a minor issue in coastal Chatham County. County Engineering states that construction, additions, conversions and development in special flood-hazard areas must comply with the County’s flood-damage-prevention requirements.
For flood-zone construction, expect Engineering review and elevation-related documentation. The County’s current inspection sheet specifically requires an Under Construction Elevation Certificate at the subfloor stage for structures built in a flood zone and requires applicable flood documentation before final occupancy approval.
Also check land disturbance before clearing, grading or digging. County inspection guidance says erosion-control requirements and a Chatham County Engineering Land Disturbing Activity permit can apply before site work begins.
Which Building Codes Apply in Chatham County in 2026?
This is an area where checking the date of the source matters. Chatham County’s Building Safety homepage still displays a code list labeled as of January 1, 2021, including the 2018 I-Codes and 2020 NEC.
Georgia’s Department of Community Affairs currently publishes newer statewide minimum construction-code information for 2026, including the 2024 International Building Code, 2024 International Residential Code, 2024 plumbing, mechanical and fuel-gas codes, the 2023 National Electrical Code, the 2024 swimming-pool code and applicable Georgia amendments. Georgia continues to list the 2015 International Energy Conservation Code with state supplements and amendments.
For additional context on how Georgia’s statewide code system interacts with local permit offices, you can also review our Georgia-focused building code discussion in the Atlanta code guide. The local permitting rules are different, but the statewide Georgia code layer is relevant throughout the state.
Homeowner Permits and Contractor Information
Chatham County publishes a Homeowner Affidavit and asks for contractor and subcontractor licensing information in applicable permit packets. A homeowner doing eligible work should not assume that owner-builder status removes plan review, trade requirements or inspections.
Where licensed contractors or subcontractors are used, prepare the requested Georgia license and local business-license information. New-construction packets also include a subcontractor signature page for plumbing, electrical, HVAC and other trades where applicable.
County Office Contact Information
| Department | Chatham County Building Safety & Regulatory Services |
|---|---|
| Address | 1117 Eisenhower Drive, Suite D, Savannah, GA 31406 |
| Mailing Address | P.O. Box 8161, Savannah, GA 31412 |
| Phone | 912-201-4300 |
| Fax | 912-201-4301 |
| Permit Application Intake | Monday–Friday, 8:00 a.m.–3:30 p.m., according to the current forms page |
| Official Website | buildingsafety.chathamcountyga.gov |
If Your Property Is Inside Savannah
Stop before submitting a County application. Savannah Development Services says it permits and inspects construction within Savannah city limits and uses its own eTRAC system for building, trade and site permits.
Start with the City of Savannah building permit page instead. This distinction is one of the most important parts of getting a Chatham-area permit right the first time.
If you are researching Georgia permitting beyond Chatham County, our Atlanta building department guide covers another major Georgia jurisdiction, while the USBuilding.org building department guides can help locate information for other areas.
Common Mistakes That Delay Chatham County Permits
- Applying to Chatham County for a property that is actually inside a municipality.
- Submitting an incomplete application without required outside approvals.
- Leaving out the site plan, construction drawings or required energy documentation.
- Ignoring septic, flood-zone, Public Works or Engineering approvals.
- Beginning work before the permit is issued.
- Covering electrical, plumbing, structural or mechanical work before inspection.
- Failing to keep approved plans and the permit at the job site.
- Treating an online zoning map as an official zoning determination.
- Using an old building-code edition without checking current Georgia amendments.
- Occupying a building before required final approvals and Certificate of Occupancy.
Frequently Asked Questions
1. Where is the Chatham County, Georgia Building Department?
Chatham County Building Safety & Regulatory Services is at 1117 Eisenhower Drive, Suite D, Savannah, GA 31406. The main phone number is 912-201-4300.
2. Does Chatham County issue building permits for the City of Savannah?
Do not assume it does. Savannah Development Services handles building permits and inspections within Savannah city limits. Chatham County’s office primarily serves unincorporated Chatham County and any jurisdiction covered by an applicable agreement.
3. Can I apply for a Chatham County building permit by email?
The County’s current building-permit forms page says applications cannot be accepted by fax or email and directs applicants to submit completed applications and attachments at 1117 Eisenhower Drive. Published intake hours are Monday through Friday, 8:00 a.m. to 3:30 p.m.
4. Do I need a permit to replace a roof in Chatham County?
Yes, the County’s published permit-required list includes reroofing. A roofing permit application is available on the official forms page.
5. Does a fence require a building permit in Chatham County?
The County’s permit-required guidance includes fences, and a specific fence application is published by Building Safety & Regulatory Services. Zoning and placement requirements should also be checked before installation.
6. How much is a Chatham County building permit?
A 2026 County permit document lists residential permits at $6 per $1,000 of construction value and commercial permits at $7 per $1,000. It lists a $2-per-$1,000 plan-review fee that is credited toward the permit fee. Other project-specific fees may apply.
7. How do I check a Chatham County building permit?
Use the Building Permit Search linked from the official Chatham County Building Safety website. Search the public portal using available project information such as the address or permit number.
8. What inspections are required for a new house?
The sequence can include setbacks, under-slab rough-ins, footing/foundation/slab, subfloor, sewer, electrical, plumbing, HVAC/gas rough-ins, framing, insulation, trade finals and building final. The exact list depends on the project and site conditions.
9. What extra requirements apply in a Chatham County flood zone?
Flood-zone construction can require Engineering approval, elevation documentation and special inspections. The County’s inspection requirements call for an Under Construction Elevation Certificate at the subfloor stage for flood-zone structures and required flood documentation before final occupancy approval.
10. What building code does Chatham County use in 2026?
Georgia DCA’s current statewide list includes the 2024 IBC and IRC with Georgia amendments, the applicable 2024 trade codes, 2023 NEC and the state’s current energy-code framework. Because the County website still displays an older 2021-era code list, verify the applicable edition and local requirements with Building Safety before finalizing a new project.
Information reviewed for 2026. USBuilding.org is an independent informational resource and is not Chatham County government. Permit requirements, fees, adopted codes, forms and review procedures can change. The responsible government agency makes the final determination for a specific property and project.