Clovis, California Building Department 2026: Permits, Inspections & Services

Clovis Building Permits, Inspections & City Services

If you are building, remodeling, reroofing, adding a room, installing certain equipment, constructing an ADU, opening a commercial space, or trying to close an existing permit in Clovis, the main office you will usually work with is the City of Clovis Building Division.

The Building Division reviews construction plans, issues building permits and performs required construction inspections for properties within its City jurisdiction. In 2026, Clovis is working under the 2025 California Building Standards Code cycle together with locally adopted requirements.

Official department City of Clovis Building Division
Address 1033 Fifth Street, Clovis, CA 93612
Building phone (559) 324-2390
Office hours Monday–Friday, 8:00 AM–4:30 PM
Online system Citizen Self-Service (CSS)
Planning questions (559) 324-2340
Need to take action now?

For a new permit, existing application, payment, permit search or inspection request, start with the City’s official Building page and Citizen Self-Service portal.

Official Clovis Building Division Open Clovis CSS Permit Portal

First: Make Sure Clovis Is the Correct Permit Authority

A Clovis mailing address does not by itself prove that the City of Clovis is the building-permit authority for the property. The City Building Division regulates buildings and structures within its jurisdiction. A property outside incorporated Clovis may instead fall under Fresno County or another authority.

Confirm this before paying for plans or submitting a permit. If the address is inside Clovis city limits, continue with the City process below. If it is in unincorporated Fresno County, start with Fresno County Development Services.

This small jurisdiction check can save a surprising amount of frustration. An application filed with the wrong agency does not move your project closer to approval.

Do You Need a Building Permit in Clovis?

Clovis Municipal Code requires permits before regulated construction begins. The City’s published guidance says permits are generally required to construct, remodel, repair, demolish, remove or move a house, building or structure.

Project What to expect
New house or commercial building Building permit, plan review, zoning clearance and other project-specific approvals are normally required.
Room addition or structural remodel Usually requires plans and a building permit. Structural, energy and trade documentation may also be required.
Kitchen or bathroom remodel Permit requirements depend on whether the work affects walls, plumbing, electrical, mechanical systems or other regulated construction.
Re-roof Clovis treats re-roofing as a permitted type of work. Existing solar equipment can add coordination requirements.
HVAC, electrical or plumbing work Applicable trade permits and inspections may be required.
Swimming pool or spa Permit, plans, safety-barrier requirements and inspections can apply.
Solar or battery system Use the City’s current solar/permit process. Qualifying residential rooftop systems may have an automated permitting route.
ADU Building approval and applicable Planning review are required. Clovis also provides information for preapproved ADU plans.
Garage conversion Plans, setbacks, parking considerations and residential code requirements can apply.
Commercial tenant improvement Expect building review plus possible Planning, Fire, accessibility, electrical, mechanical and plumbing review depending on scope.

Work That May Be Exempt From a Building Permit

The City’s published FAQ currently lists several examples of work that may not require a building permit, including:

  • A one-story detached tool shed, storage shed, playhouse or similar accessory structure with a floor area of no more than 120 square feet.
  • Certain fences not over 7 feet high.
  • Certain retaining walls not over 4 feet high when measured from the bottom of the footing to the top of the wall, provided they are not supporting a surcharge or otherwise triggering an exception.
  • Platforms, walks and driveways not more than 30 inches above grade and not located over a basement or story below.
  • Painting, papering and similar finish work.
Permit-exempt does not mean rule-exempt.

A project can be exempt from a building permit but still have zoning, setback, easement, electrical, plumbing, fire, HOA or other restrictions. The City’s own fence guidance, for example, tells people with corner lots to check with Planning.

Before relying on an exemption, describe the exact work to the Building Division. This is especially important in 2026 because California entered a new building-code cycle on January 1.

How to Apply for a Clovis Building Permit Online

Clovis uses a Citizen Self-Service system for electronic building services. City materials state that plans can be submitted, reviewed and issued through the CSS portal.

  1. Confirm the property and zoning first.
    Verify that the address is within City jurisdiction. For additions, new buildings, ADUs, garage conversions, commercial uses or exterior work, check setbacks, zoning and other Planning requirements before finishing your drawings.
  2. Define the complete scope of work.
    Write down exactly what is being built, removed, replaced or altered. Include associated electrical, plumbing, HVAC, grading, demolition, solar or other work instead of describing only the main construction item.
  3. Prepare the permit information.
    Have the property address, owner information, applicant contact information, contractor details, applicable license number, project valuation and a clear description of work ready.
  4. Prepare drawings and supporting documents.
    Depending on the project, this may include a site plan, floor plan, elevations, structural information, energy documents, calculations, grading information and other agency approvals.
  5. Open the official CSS portal.
    Go to the City of Clovis Citizen Self-Service portal. Register an account or sign in.
  6. Select the correct permit and submit the package.
    Enter the project information carefully and upload the required documents. Avoid choosing a permit category simply because its name looks close to your project.
  7. Watch for plan-review comments.
    If reviewers request changes, answer every correction and upload coordinated revisions. A revised plan should agree with the application, calculations and other supporting documents.
  8. Pay required fees and wait for issuance.
    An application confirmation is not the same as an issued permit. Do not begin regulated work until the required permit has actually been issued.

What information should you prepare before opening the portal?

  • Exact job-site address.
  • Property owner name and contact information.
  • Applicant name, telephone number and email.
  • Contractor information and license number when applicable.
  • Detailed description of the proposed work.
  • Existing and proposed square footage.
  • Estimated project valuation.
  • Site dimensions and distances to property lines when relevant.
  • Construction plans and specifications.
  • Structural, energy or other calculations when required.
  • Planning, Fire, Engineering or other supporting approvals when applicable.

Residential vs. Commercial Plan Submittals

Small residential projects and complex commercial projects do not go through the same level of review. A simple equipment replacement may need far less documentation than a new house, addition, commercial building or tenant improvement.

For new commercial construction, expect detailed drawings and calculations prepared for the applicable California building, accessibility, fire-life-safety and trade requirements. Professionally prepared or signed documents may be required depending on the project and California licensing rules.

Watch out for older Clovis instructions online.

The City’s Building FAQ still contains some legacy references to paper plan sets and an old inspection phone process. More recent City material says plan types may be submitted online through CSS, and the current inspection handout requires online inspection requests. For a 2026 project, follow the latest Building Division page, current handouts and instructions shown in the portal.

Clovis Building Permit Fees in 2026

There is no single price for a Clovis building permit. The final amount depends on the type of permit, project valuation, required plan review, trade permits and any applicable Planning, Fire, Engineering, development or other charges.

Clovis Municipal Code provides several useful fee rules:

  • When building-plan submittal documents are required, the building plan-review fee is generally 65% of the building permit fee.
  • Electrical, mechanical and plumbing plan-review fees are generally 25% of the applicable trade permit fee.
  • Additional plan review can be charged when documents are incomplete, substantially changed or require additional review.
  • The Municipal Code includes a $20 information-management-system fee per permit transaction.
  • Other planning, technology, development, fire or project-specific charges may apply.

Use those percentages to understand how the fee structure works, not as a final quote. The City’s current permit invoice or Building Division calculation controls the actual amount due.

If you are comparing statewide requirements behind a Clovis permit, our California Building Code 2026 guide explains the current Title 24 code cycle in plain language.

How to Schedule a Building Inspection in Clovis

This is one area where using the newest City instructions matters.

The Building Division’s inspection-request handout revised November 20, 2025 says inspection requests must be submitted through the City’s CSS portal. The online request may be completed by midnight on the day before the requested inspection.

Do not use the old inspection-request phone number.

The City’s older FAQ still says inspections can be called in. The newer Building Division inspection handout specifically says there is no Inspection Request phone line and directs applicants to the CSS portal instead.

  1. Open the CSS portal.
    Sign in and locate the issued permit.
  2. Choose the required inspection.
    Submit the inspection request no later than the City’s published online deadline.
  3. Make sure the work is actually ready.
    Complete the work being inspected and make sure it matches the approved plans.
  4. Keep the approved documents at the job site.
    The City’s current instructions say approved plans and job cards should be on-site and accessible to the inspector.
  5. Check the day’s inspector if you need a time estimate.
    The Building page tells users to open “Today’s Inspections,” find their permit number and see the assigned inspector. The inspector’s telephone number is displayed there.
  6. Call the assigned inspector only about the time window.
    AM, PM or specific-time requests may be considered but are not guaranteed because the route depends on workload.

View the City’s current inspection-request handout.

Typical Clovis Building Inspection Stages

The exact inspections are determined by your permit, but Clovis Municipal Code identifies major stages that can include:

Inspection stage When it generally occurs
Foundation After footing excavations are complete and required reinforcing is in place, before concrete is placed.
Concrete slab / under-floor After applicable piping, conduit and under-floor systems are installed but before concrete, floor sheathing or the subfloor covers the work.
Framing After framing, roof, bracing and fire blocking are in place and applicable rough electrical, plumbing and mechanical work has been approved.
Lath / wallboard After the relevant wall or lath installation but before work is concealed by plaster, taping or finishing where inspection is required.
Project-specific inspections Additional inspections may be required for electrical, plumbing, mechanical, energy, accessibility, fire, pool, solar or other work.
Final inspection After required construction and finish grading are complete and the project is ready for final approval or occupancy, as applicable.

Do not cover work that still requires inspection. Concealing framing, reinforcement, pipes, wiring or other regulated work before required approval can lead to corrections, reopening completed surfaces and added cost.

What Building Codes Apply in Clovis in 2026?

The important date is January 1, 2026. California’s 2025 Building Standards Code became effective statewide on that date, and Clovis adopted the current 2025 California codes through its local ordinances.

Depending on the project, applicable standards can include the:

  • 2025 California Building Code.
  • 2025 California Residential Code.
  • 2025 California Electrical Code.
  • 2025 California Mechanical Code.
  • 2025 California Plumbing Code.
  • 2025 California Energy Code.
  • 2025 California Green Building Standards Code, or CALGreen.
  • California Fire Code and other applicable Title 24 provisions.
  • Clovis Municipal Code amendments and project-specific local requirements.

Clovis Municipal Code specifically adopts the 2025 California Building Code and the 2025 California Residential Code for the applicable categories of construction.

For the official state code library, use the California Building Standards Commission Codes page.

Check Zoning Before You Finish Your Plans

A building permit is not the same thing as zoning approval. Clovis Development Code requires building permits and zoning clearance for applicable construction.

Zoning review can affect issues such as:

  • Setbacks from property lines.
  • Allowed land use.
  • Building height and lot coverage.
  • Accessory structures.
  • Parking.
  • Garage conversions.
  • ADUs.
  • Commercial changes of use.
  • Signs.
  • Site-plan review.

For these questions, use the Clovis Planning Division or call (559) 324-2340 before spending money on final drawings.

How Long Is a Clovis Building Permit Valid?

Clovis Municipal Code provides a 180-day activity rule. A permit can expire if the authorized work is not commenced within 180 days of permit issuance or if work is suspended or abandoned for 180 days after starting.

The City’s code also states that failure to pass a required inspection every 180 days constitutes abandonment of the work for permit-expiration purposes.

If your permit has been inactive for months, check its status before restarting construction. Do not assume an old permit is still active simply because you still have a copy of it.

Certificate of Occupancy and Final Approval

For projects where a Certificate of Occupancy is required, the building or applicable portion cannot be legally used or occupied until the required certificate has been issued.

Clovis also requires applicable on-site and off-site improvements to be completed before occupancy approval unless an authorized completion agreement or other City-approved arrangement applies.

This is especially important for new commercial buildings, new businesses, changes of occupancy and major development. A business license alone does not replace required building and occupancy approvals.

Search a Clovis Building Permit or Check Status

The City Building page links its CSS system for permit and plan-review searches. This can help you follow an active application, find a permit record, review available status information, make eligible payments or work with an issued permit.

  1. Open the Clovis CSS portal.
  2. Use the permit or plan-review search option.
  3. Enter the permit number, address or other supported search information.
  4. Open the matching record.
  5. Review the available status, inspections, fees or related information.
  6. If an older record is not available online, contact the Building Division with the property address and known permit information.

For older building-inspection files or commercial plans, the City’s published FAQ also directs users to request record research through the Permit Counter.

Common Clovis Permit Problems and the Practical Fix

Problem Best next step
Cannot find the correct permit type Call Building at (559) 324-2390 before submitting the wrong application.
Project fails zoning review Contact Planning before revising construction plans. A building-code-compliant design can still violate zoning.
Application is incomplete Read every review comment and submit a coordinated correction package rather than uploading isolated changes.
Inspection cannot be requested Confirm the permit has been issued and that the correct inspection is available in the CSS record.
Inspector cannot access the work Provide safe access and make approved plans and job documents available on-site.
Work was covered before inspection Contact the inspector. The City may require the work to be exposed so compliance can be verified.
Permit has been inactive Check the 180-day activity rule and permit status before restarting work.
Construction started without a permit Stop and contact Building. Clovis code provides investigation fees in addition to normal permit charges for unpermitted work.
Older City webpage conflicts with a newer handout Use the newest dated Building Division document and current CSS instructions, or confirm directly with City staff.

Starting Work Without a Permit Can Cost More

Clovis Municipal Code allows an investigation fee when regulated work begins without the required permit. The initial investigation fee can equal the normal permit fee, with progressively higher investigation fees for repeated unpermitted work by the same permittee.

Paying the additional fee does not make noncompliant construction acceptable. Plans, corrections and inspections can still be required.

If work has already started, contacting the Building Division early is usually better than continuing and hoping the issue is not discovered.

Before You Submit: A Simple Clovis Permit Checklist

  • Confirm the property is actually under City of Clovis jurisdiction.
  • Check zoning, setbacks and allowed use.
  • Write a complete scope of work.
  • Identify every building and trade permit involved.
  • Prepare accurate plans that agree with the application.
  • Include applicable Title 24 energy and CALGreen documents.
  • Have owner, applicant and contractor information ready.
  • Enter a realistic project valuation.
  • Submit through the current CSS process.
  • Respond to every plan-review correction.
  • Wait for actual permit issuance before regulated work begins.
  • Request inspections before covering regulated construction.
  • Keep approved plans and job documentation at the site.
  • Obtain final inspection and Certificate of Occupancy when required.

Clovis Building Department FAQs

1. Where is the Clovis, California Building Department?

The City of Clovis Building Division is at 1033 Fifth Street, Clovis, CA 93612. The main Building Division telephone number is (559) 324-2390. Published office hours are Monday through Friday, 8:00 AM to 4:30 PM.

2. Can I apply for a Clovis building permit online?

Yes. The City uses its Citizen Self-Service portal for electronic permit services. Create an account or sign in, select the appropriate permit process, enter the project information and upload the required documents.

3. Do I need a building permit to remodel a house in Clovis?

Many remodeling projects require permits, particularly when structural, electrical, plumbing, mechanical or other regulated work is involved. Cosmetic work such as painting may be exempt. Confirm the exact scope with the Building Division before construction begins.

4. Do I need a permit for a small shed in Clovis?

The City’s published FAQ lists certain one-story detached tool sheds, storage sheds, playhouses and similar structures not exceeding 120 square feet as building-permit exempt. Zoning, setbacks, easements and utility restrictions can still apply.

5. Do I need a permit for a fence in Clovis?

The City’s FAQ lists certain fences not over 7 feet high as building-permit exempt, but Planning rules can still control placement and height. The City specifically advises checking with Planning for corner-lot situations.

6. How do I schedule a Clovis building inspection?

Use the City of Clovis CSS permit portal. The current Building Division inspection handout says the online inspection request can be completed by midnight on the day before the requested inspection.

7. Can I call a Clovis inspection request phone line?

The current Building Division inspection handout says there is no Inspection Request phone line and directs users to request inspections online through CSS. An older City FAQ still contains a legacy phone instruction, so use the newer inspection handout and current Building page.

8. What building code applies in Clovis in 2026?

Clovis has adopted the 2025 California Building Standards Code cycle, including the applicable 2025 California Building and Residential Codes. The statewide 2025 Title 24 edition became effective January 1, 2026. Local Clovis amendments can also apply.

9. How much does a Clovis building permit cost?

There is no single flat permit price. Fees depend on the permit type, valuation, plan review, trade work and other applicable charges. Clovis code generally sets building plan review at 65% of the building permit fee when plan-review documents are required, with other charges potentially added.

10. When does a Clovis building permit expire?

Clovis code generally provides a 180-day activity period. A permit may expire if work does not begin within 180 days or if work is suspended or abandoned for 180 days. Failure to pass a required inspection every 180 days is also treated as abandonment under the City’s permit-expiration provision.

Your final step

Once you know the permit type, documents, inspection process and applicable code requirements, use the official City system for the live application, payment, permit status or inspection request. Keep your property address and permit number handy whenever you contact staff.

Clovis Building Division Permit & Inspection Portal

Information reviewed for the 2026 permit and code cycle. USBuilding.org is an independent informational resource and is not affiliated with the City of Clovis. Permit requirements, fees, forms and portal procedures can change. The City of Clovis and other responsible agencies make the final project-specific determinations.