Cohasset, Massachusetts · 2026 permit and inspection guide
Building Permits, Inspections and Official Services in Cohasset
If you are planning a renovation, addition, new home, deck, pool, commercial project or other construction work in Cohasset, the Town’s Building & Inspections Department is the main local office for building permits, zoning review and construction inspections. Electrical, plumbing and gas permits and inspections are also coordinated through the permitting and inspections operation.
What the Cohasset Building Department Handles
The department administers and enforces the Massachusetts State Building Code, Cohasset zoning rules and other construction-related requirements. Its published responsibilities include reviewing permit applications and plans, issuing permits, performing field inspections, enforcing zoning requirements and issuing occupancy approvals for new or changed uses.
Common services include:
- Residential and commercial building permits
- Construction plan review
- Zoning compliance review
- Building inspections
- Electrical permits and inspections
- Plumbing and gas permits and inspections
- Certificates or permits related to occupancy
- Permit records and building permit logs
- Code and zoning enforcement
- Coordination with Planning, Conservation, Health, Fire, Sewer and other Town boards when a project needs multiple approvals
Do You Need a Building Permit?
Cohasset’s published pre-permitting guide says permits are required for almost all building and construction-related activities in Town. The exact permit depends on what you are changing, the size and location of the project, zoning conditions and whether electrical, plumbing, gas, septic, wetlands, historic or other approvals are involved.
The Town’s guidance specifically discusses new homes, additions, kitchen and bathroom renovations, decks, porches, basement and attic renovations, swimming pools, accessory structures, retaining walls, commercial work and projects that change a building’s structural footprint.
How to Apply for a Cohasset Building Permit
-
Define the full scope of work.
Write down what is being built, removed, relocated or altered. Include dimensions, use of the space, structural changes and any electrical, plumbing or gas work. -
Check whether another Town approval comes first.
Projects involving wetlands, septic systems, zoning relief, historic-district property, major land alteration, curb cuts, sewer connections or fire-protection systems may need another board or department before the building permit can be issued. -
Create or sign in to your PermitEyes account.
Open the Cohasset electronic permitting portal. Create an account if you do not already have one. -
Start the correct building-permit application.
Enter the property, owner, contractor, estimated construction value and a clear description of the work. Avoid vague descriptions such as “remodel” when you can state exactly what is changing. -
Prepare plans and supporting documents.
Cohasset currently states that paper building plans still need to be submitted for Building Commissioner review even though the application itself is electronic. -
Pay the required fee.
Use the applicable fee schedule and follow the payment instructions generated for your application. Published schedules state that applications cannot be accepted without required fees. -
Watch for comments or additional approvals.
Missing plans, contractor information, zoning issues or another board’s approval can hold up issuance. Keep your application number so staff can identify the project quickly. -
Pick up the issued building permit.
The Town’s electronic-permitting instructions say applicants must still physically obtain the building permit. -
Post the permit at the property.
Keep the permit visible and protected from weather at the site through the inspection and closeout process. -
Start regulated work only after the permit is issued.
An application being submitted or under review is not permission to begin construction.
Official instructions: Cohasset Electronic Permitting – Building.
Documents to Prepare Before You Apply
The exact package varies by project, but preparing the following information before opening the application can save a lot of back-and-forth.
| Document or information | When it may be needed |
|---|---|
| Property owner information and signature | Cohasset’s published pre-permitting guide requires proof of ownership and the owner’s signature for building-permit applications. |
| Construction plans | Commonly required for new homes, additions, kitchen/bath work, decks, porches, basement or attic renovations and commercial work. |
| Certified professional plans | May be required for commercial projects and work involving engineered lumber, trusses, steel or unusual structural design. |
| Plot or site plan | Called for in Cohasset’s pre-permitting procedure for many footprint changes, decks, additions, pools, certain accessory structures and retaining walls. |
| Estimated construction cost | Used for the application and to calculate valuation-based building fees. |
| Contractor CSL/HIC information | Needed where Massachusetts contractor licensing or Home Improvement Contractor requirements apply. |
| Other board approvals | May include Planning, ZBA, Conservation, Health, Sewer, Fire, Historic District or DPW approvals. |
You can review the Town’s currently published Building & Inspections pre-permitting procedure before submitting a larger project.
Projects That Need a Pre-Permitting Meeting
Cohasset’s currently linked pre-permitting procedure says a pre-permitting meeting is required for new homes/new construction, commercial construction and projects expected to require permits from multiple Town boards. The purpose is to identify zoning problems and establish the proper order for public hearings and approvals before the building-permit review reaches its final stage.
For a current appointment, use the Building & Inspections main number at 781-383-4100 ext. 5100 rather than relying on an old staff contact contained in an older PDF.
Other Approvals That Can Affect a Building Permit
One of the easiest ways to lose time is to treat the building permit as the only approval. Cohasset’s process can involve several boards depending on the property and scope.
| Office or board | Situations to check |
|---|---|
| Planning Board | Large Home Review, site plan review, certain special permits, subdivision matters, land alteration and other planning approvals. |
| Zoning Board of Appeals | Variances, nonconforming lots or structures, applicable special permits, floodplain/watershed issues and other zoning relief. |
| Conservation Commission | Wetlands, riverfront areas, protected resource areas, certain land disturbance and stormwater-related work. |
| Board of Health | New or upgraded septic systems, Title V matters and certain demolition projects. |
| Sewer Commission / DPW | New sewer connections, utility changes, street openings, drainage work and related infrastructure impacts. |
| Cohasset Common Historic District Commission | Exterior changes, new construction or demolition affecting property within the designated historic district. |
| Fire Department | Applicable fire-protection plans, major renovations, additions and systems regulated by fire-safety requirements. |
For current zoning text, use the Town of Cohasset Code and Zoning Bylaw. It includes Chapter 300, the Cohasset Zoning Bylaw, as well as local building, historic-district, stormwater and wetlands provisions.
Cohasset Building Permit Fees
Cohasset’s Building Department currently publishes a building fee schedule effective June 1, 2023. Treat these figures as a budgeting guide and verify the final amount when you file because schedules can be amended.
| Building permit item | Published fee |
|---|---|
| Residential building work | $10 per $1,000 of construction value; $75 minimum |
| Commercial building work | $15 per $1,000 of construction value; $100 minimum |
| Tent installation | $75 flat fee |
| Permit renewal | $50 |
| Permit replacement | $100 |
| Occupancy permit | $75 |
Example: if residential work has an accepted construction value of $35,000, the published $10-per-$1,000 formula produces a $350 base building-permit fee. Separate electrical, plumbing, gas, planning or other fees may still apply.
See the official Cohasset building fee schedule.
Electrical Permit Fees
Cohasset’s published electrical fee schedule is separate from the building fee. Selected residential charges include:
| Electrical work | Published fee |
|---|---|
| Residential minimum | $75 |
| 100A to 200A service change | $75 |
| 200A to 400A service change | $150 |
| Generator installation only | $100 |
| Generator with service change | $250 |
| New home with 200A service | $400 |
| New home with 300A or greater service | $475 |
| Residential solar panels | $50 |
| Defective-work reinspection | $75 |
Full details: official electrical permit fee schedule.
Plumbing and Gas Fees
The Town publishes a newer plumbing and gas schedule effective July 1, 2025. Selected current published charges are below.
| Plumbing / gas item | Published fee |
|---|---|
| Residential one-fixture minimum | $75 |
| Each additional residential fixture | $15 |
| New house up to 3,000 sq. ft. | $300 |
| New house up to 4,000 sq. ft. | $400 |
| New house over 4,000 sq. ft. | $500 |
| Gas furnace and test | $80 |
| Residential reinspection | $100 |
| Commercial one-fixture minimum | $100 |
| Work started without a plumbing/gas permit | Double the applicable permit fee |
See the official plumbing and gas fee schedule for the complete list.
How to Schedule a Cohasset Building Inspection
Cohasset tells permit holders to contact the Building Department for inspections. Do not assume that submitting a permit application automatically schedules an inspection.
-
Confirm the correct inspection stage.
Know whether you need a foundation, rough, framing, trade, final or another project-specific inspection. -
Have the permit information ready.
Keep the permit number, project address, owner or contractor name and inspection type in front of you. -
Call Building & Inspections.
Use 781-383-4100 ext. 5100 for general inspection scheduling and current instructions. -
Keep work accessible.
Do not cover work that still needs to be inspected. Keep the permit and approved plans available at the property. -
Complete corrections before requesting reinspection.
If an inspector identifies deficiencies, correct the listed items before scheduling the required follow-up.
When Can You Speak With the Director?
The Building Department currently publishes the following office hours for Director John Hallin:
| Day | Published office hours |
|---|---|
| Monday–Thursday | 8:30 AM–10:00 AM and 2:00 PM–4:30 PM |
| Friday | 8:30 AM–10:00 AM |
Inspectors spend time in the field, so calling before making a special trip to Town Hall is sensible if you need to meet a particular inspector.
How to Check a Cohasset Permit or Application Status
Cohasset provides a public PermitEyes view where available permit records can be searched. The system displays fields such as application number, application date, issue date, property address, permit type, permit number and application status.
- Open the Cohasset PermitEyes public search.
- Select the appropriate Building Department records area if necessary.
- Search using the information you have, such as the site address, permit/application number or displayed status fields.
- Confirm that the property address and permit type match the project you are researching.
- If the record is unclear, contact Building & Inspections with the property address and permit number.
Cohasset also maintains official building permit logs for many historical periods.
Certificate of Occupancy and Project Closeout
Cohasset’s Building Department issues occupancy approvals for new properties and changes of use, and its zoning bylaw states that a structure or lot may not be used or occupied where an occupancy permit is required until the Building Inspector has determined compliance.
Before treating a project as complete, verify:
- All required building inspections are complete.
- Electrical, plumbing and gas finals are complete when applicable.
- Outstanding corrections have been cleared.
- Required releases from other Town boards or departments are complete.
- Any required final-cost affidavit has been submitted.
- The required occupancy approval or final permit status has been issued.
Current Massachusetts Building Code
Massachusetts is operating under the 10th Edition of the Massachusetts State Building Code, 780 CMR. The 10th Edition first became effective October 11, 2024, and the transition period for using the 9th Edition ended June 30, 2025.
Cohasset has also adopted the Massachusetts Stretch Energy Code. Energy-code requirements can affect new homes, additions, substantial renovations and commercial construction, so energy documentation should be considered early rather than at the end of plan review.
State reference: Massachusetts State Building Code — 780 CMR.
Hiring a Contractor in Massachusetts
Home Improvement Contractor registration and Construction Supervisor Licensing are different. Depending on the work, a contractor may need one or both. Cohasset’s own pre-permitting materials also require applicable CSL and HIC contractors to register their credentials with the Building & Inspections Department.
Before work begins, verify the contractor’s current state credentials and make sure the permit application correctly identifies the responsible contractor.
No Published Guaranteed Permit Review Time
Cohasset’s current Building & Inspections materials do not publish one guaranteed turnaround time for every building permit. That makes sense because a simple residential alteration and a project involving zoning relief, wetlands, historic review, septic approval and engineered plans do not follow the same path.
To reduce avoidable delays:
- Use a detailed project description.
- Submit complete plans the first time.
- Resolve zoning questions early.
- Complete required board approvals in the correct sequence.
- Use licensed trades where required.
- Respond quickly to plan-review comments.
- Do not start work while an application is only pending.
Common Problems and What to Do
| Problem | Practical next step |
|---|---|
| Permit application is still under review | Check PermitEyes for missing items or contact the office with your application number. |
| You submitted online but have not received a permit | Do not begin work. Online submission is not permit issuance. |
| You forgot the paper plans | Contact Building & Inspections and provide the paper plan set required for review. |
| Zoning prevents approval | Ask whether the project requires a special permit, variance, redesign or another zoning process. |
| Property is in the historic district | Confirm Historic District Commission requirements before expecting a building or demolition permit. |
| Property is near wetlands | Check with Conservation before disturbing land or committing to a final building footprint. |
| Inspection failed | Correct the cited deficiencies and arrange the required reinspection; a reinspection fee may apply. |
| Old permit appears open | Ask the Building Department whether required finals or closeout documents are still outstanding. |
Cohasset Building Department Contact Information
Department contacts, fees, staff assignments and permitting procedures can change. Use the official portal or Building & Inspections office for the final project-specific decision.
Related Massachusetts Permit Guides
If your work is outside Cohasset, do not reuse Cohasset’s fees or procedures. Municipal permitting varies even between nearby Massachusetts communities. Our guides to the Brockton Building Department, Abington Building Department and Boston building permit search process explain their separate local systems.
Cohasset Building Department: 10 FAQs
1. How do I apply for a building permit in Cohasset?
Building Department permits are applied for through Cohasset’s PermitEyes electronic permitting system. Create or sign in to an account, select the appropriate application, enter the project information and complete the required submission. For building permits, Cohasset currently also requires paper plans for review and physical pickup of the issued permit.
2. Can I start construction after submitting the online application?
No. A submitted application is not an issued permit. Cohasset specifically states that work should not begin until you physically have the building permit. The permit should then be posted at the job site.
3. What is the Cohasset residential building permit fee?
The Town’s currently published building fee schedule lists residential building work at $10 per $1,000 of construction value with a $75 minimum. Verify the amount generated for your current application before paying.
4. How much is a commercial building permit in Cohasset?
The published schedule lists commercial building work at $15 per $1,000 of construction value with a $100 minimum. Other trade, planning, zoning or board fees may apply separately.
5. How do I schedule a building inspection in Cohasset?
Contact the Building & Inspections office at 781-383-4100 ext. 5100. Have the property address, permit number and required inspection type ready. Keep the permitted work exposed and accessible until the required inspection is completed.
6. When are plumbing and gas inspections performed?
The Town’s plumbing and gas fee schedule effective July 1, 2025 states that inspections are conducted Tuesday and Thursday from 2:00 PM to 4:00 PM. Requests can be called to ext. 5100 or 5118, and the plumber must be present.
7. Can I search Cohasset building permits online?
Yes. The Cohasset PermitEyes public-view system provides searchable permit information, and the Town also maintains archived building permit logs. Search by available property or permit information, then contact the department if a record’s final status is unclear.
8. Do I need a pre-permitting meeting for a new house?
Cohasset’s currently published pre-permitting procedure says pre-permitting meetings are required for new homes/new construction, commercial construction and projects involving multiple Town boards. Call the department to arrange the current process before preparing a large application.
9. Does Cohasset use the Massachusetts Stretch Energy Code?
Yes. Cohasset adopted the Stretch Energy Code, and the Town’s code incorporates future editions, amendments and modifications. Energy-code documentation can therefore be an important part of new construction and substantial renovation review.
10. What number should I call for the Cohasset Building Department?
The main Building & Inspections number is 781-383-4100 ext. 5100. Director of Planning, Permits & Inspections John Hallin is listed at ext. 5103.