Dallas County Building Department 2026: Permits, Inspections & Services

Dallas County, Texas · 2026 permit guide · Information reviewed October 23, 2026

Dallas County Building Permits: Start With the Right Jurisdiction

If you are looking for the Dallas County Building Department, the first thing to know is that Dallas County does not operate like a typical city building department. County permitting is primarily handled through the Dallas County Department of Unincorporated Area Services (DUAS) for property in unincorporated Dallas County.

If your property is inside the City of Dallas, Garland, Irving, Mesquite, Richardson, Grand Prairie, or another incorporated municipality, that city normally handles its own building permits and inspections. A Dallas mailing address or ZIP code by itself does not prove that Dallas County is your permitting authority.

Do this before preparing plans: confirm whether the property is inside a city or in unincorporated Dallas County. Filing with the wrong jurisdiction can waste days and may require you to start again.
Primary county officeDepartment of Unincorporated Area Services (DUAS)
County jurisdictionPrimarily unincorporated Dallas County
Online permit systemMGO Connect / MyGovernmentOnline
DUAS phone214-653-6565
Permit assistance214-653-6568
EmailDevelopment@DallasCounty.org
Office500 Elm Street, Suite 6100, Dallas, TX 75202
Fire Marshal214-653-7970

Does Dallas County Issue Your Permit?

Dallas County states that it issues permits only for property located in its unincorporated areas. County planning information says these areas represent less than ten percent of the county’s land and are concentrated largely in the southeastern part of Dallas County.

Your property/project Where to start
Property inside City of Dallas Use City of Dallas Development Services and DallasNow, not the county DUAS process.
Property inside another Dallas County city Contact that municipality’s building or development department.
Property in unincorporated Dallas County Start with Dallas County DUAS and MGO Connect.
Unsure whether property is incorporated Ask DUAS to verify jurisdiction before submitting an application.
Unincorporated property affected by an ETJ Confirm which county and municipal requirements apply before design or construction.

Texas counties also do not have the same general zoning authority as Texas cities. Dallas County explains that cities adopt zoning ordinances, while the county regulates specific matters in its unincorporated territory such as floodplain development, subdivisions, septic systems, residential construction, certain outdoor businesses, communications facilities and commercial construction.

Read Dallas County’s official zoning and unincorporated-area explanation ↗

Which Dallas County Permit Do You Need?

The right application depends on what you are actually doing. Don’t choose a permit merely because its name sounds close to your project.

Project Typical Dallas County route
New commercial building, warehouse, office, workshop or similar structure Building Permit Application plus applicable Fire Marshal review
New house, residential addition or major structural residential work Notice of Residential Construction and any related development approvals
Grading, filling, excavation, drainage work or floodplain development Development Permit / Floodplain Development Application
Fence or other work in a regulated floodplain area Development/Floodplain review may apply
Driveway or culvert connecting to a county roadway Driveway/Culvert Permit
Mobile home or RV placement Mobile Home Placement Application
New or modified communications tower Communications Facilities Permit
Subdivision, replat or platting outside applicable municipal ETJ Plat Application
Utility construction in Dallas County right-of-way Right-of-Way / Utility Permit
New electric or gas service release Meter Release Application when applicable
Business operation in unincorporated Dallas County Operational Permit Application when required
On-site septic system Separate Dallas County Health and Human Services OSSF approval
Controlled outdoor burning Open/Controlled Burn Safety Application and applicable Fire Marshal requirements
Temporary public event Special Event Permit; county instructions state to submit at least 45 days before the event

If your project does not fit neatly into one category, Dallas County offers a Pre-Development Meeting. The county asks for a pre-development application, site or conceptual site plan and survey. If you do not own the property but are considering buying it, a notarized authorization from the owner may be required before staff discusses the property. Current meetings are conducted through Microsoft Teams.

Official pre-development meeting instructions ↗

How to Apply for a Dallas County Permit Online

  1. Confirm the property is under Dallas County jurisdiction.
    Make sure the site is in unincorporated Dallas County. If it is within municipal limits, stop and use that city’s permitting department instead.
  2. Choose the correct application.
    Open the county’s Applications & Permit Forms page and match your work to the residential, commercial, development, floodplain, driveway, utility, mobile-home or other permit category.
  3. Prepare your supporting documents.
    Dallas County’s published checklist says a complete application may require the application itself, owner authorization, fee payment, plat, deed, scope of work, site plan and survey. If a survey is required, the county identifies an 11-by-17-inch PDF as a common submission format, while a full-size 24-by-36-inch plan may also be requested.
  4. Create or open your MGO Connect account.
    Go to MGO Connect, select the Customer Portal, choose Texas, then select Dallas County Unincorporated. New users should create an account before beginning the application.
  5. Enter the project information carefully.
    Use the actual project location and accurate owner, applicant and contractor details. Select the permit type that matches the county application you identified.
  6. Upload plans and supporting files.
    Attach the site plan, survey, deed, authorization, project description and other required documents. A saved draft is not the same as a submitted application, so make sure the portal confirms submission.
  7. Pay the required application fee.
    Dallas County currently says application fees are paid by debit or credit card. Because published schedules and project-specific charges can differ, confirm the amount with DUAS before payment when the portal does not make it clear.
  8. Respond to review comments and wait for issuance.
    County staff may route the project to Public Works, the Fire Marshal, Health and Human Services, Road and Bridge or another reviewer. Do not begin regulated development merely because the application was submitted.
Important: Dallas County Public Works says a permit application file remains open for one year from the date received. Required documents should be completed within that period, and development is not authorized until the required permits have been approved and issued.

Documents to Have Ready Before You Apply

A few minutes spent organizing documents can save repeated uploads and review comments. Depending on the project, prepare:

  • Completed permit or notice application
  • Property owner’s authorization if someone else is submitting
  • Property deed
  • Recorded plat, if the property is platted
  • Survey when required
  • Site plan showing the proposed work
  • Clear written scope of work
  • Building plans or construction drawings when applicable
  • Floodplain information or elevations when required
  • Septic/OSSF documents if public sewer is unavailable
  • Fire protection plans for regulated commercial work
  • Driveway, drainage or utility information when those systems are affected

For development in a Special Flood Hazard Area, additional elevation information, flood-resistant design details, engineering or a no-rise analysis may be required depending on the project.

Floodplain and Development Permits

Floodplain review is especially important in unincorporated Dallas County. The county states that much of its unincorporated territory is considered floodplain, and development cannot simply proceed because a building itself appears small.

Development can include more than constructing a structure. Grading, fill, excavation, drainage improvements and certain other changes to land can trigger review.

For property within the Special Flood Hazard Area, Dallas County’s floodplain regulations require a development permit. The county may review items such as:

  • Base Flood Elevation
  • Lowest-floor elevation
  • Flood-resistant construction
  • Anchoring
  • Protection of utilities from flooding
  • Floodway encroachment
  • Whether a proposed project would increase flood heights

Dallas County official floodplain information ↗

Residential Construction in Unincorporated Dallas County

For residential work, the county’s current permit page lists a Notice of Residential Construction Application for new residential construction, additions and major structural renovations.

Dallas County’s planning guidance also specifically directs owners to review residential construction requirements when building a new residential unit or an addition of at least 500 square feet in an unincorporated area outside a city’s extraterritorial jurisdiction.

Don’t treat an ETJ boundary as a minor detail. Before paying for final plans, ask DUAS whether the site is within a municipal ETJ and exactly which county notices, development permits, subdivision rules or municipal requirements affect the project.

Residential inspection stages

The residential inspection compliance form published by Dallas County identifies three important construction stages:

  • Foundation: before concrete is placed.
  • Framing and mechanical systems: before drywall or other interior wall coverings conceal the work.
  • Completion: after the construction is finished.

The county’s older residential inspection form references an earlier International Residential Code edition. Because that form remains available while code requirements can change, confirm the current code basis and required inspection documentation with DUAS before construction rather than relying on the date printed on an older form.

Commercial Building Permits and Fire Marshal Review

Commercial construction in unincorporated Dallas County can involve both DUAS and the Dallas County Fire Marshal. The county’s current Building Permit Application is identified for new commercial buildings such as offices, warehouses, workshops and garages.

The Dallas County Fire Code was amended effective October 21, 2025 and incorporates the 2024 International Fire Code (IFC) with Dallas County amendments. The code applies in unincorporated Dallas County and to county-owned or operated facilities as specified by the code.

Its stated scope covers regulated public buildings, commercial establishments, applicable substantial improvements and multifamily residential buildings with four or more units. The Fire Code also explains that detached one- and two-family dwellings are generally outside that fire-code scope unless a separately regulated activity or hazard applies.

How commercial building inspections work under the Fire Code

For building permits governed by the current Dallas County Fire Code, the permit holder is required to employ an ICC-certified building inspector, licensed engineer, architect or ICC-certified building official to perform phased inspections and maintain inspection logs.

At completion, the permit holder must submit an as-built certification signed and sealed by an eligible professional stating that the building complies with the code. Required fire-protection-system documentation must also be included.

The as-built certification acts as the request for final inspection. After approval, the Fire Marshal may issue the applicable Certificate of Compliance and release utilities. The Fire Code states that the building or structure may not be occupied before the required certificate is issued.

Before covering work: confirm which inspections and documentation your specific permit requires. Concealing work before a required inspection can lead to delays, additional verification or reinspection costs.

Dallas County Permit Fees in 2026

There are multiple fee schedules because different departments review different parts of a project. Dallas County’s current application page specifically tells applicants to call DUAS to confirm the applicable application fee.

Published DUAS permit fees

The following figures come from the county’s published DUAS fee schedule, which is still available online but is marked last updated August 30, 2023. Use these as a planning reference, not a guarantee of the amount currently due.

Published permit/service Published amount
Development Permit Level 1$35
Development Permit Level 2 or 3$100
Development Permit Level 4$250
Cell tower communications facility$50
Driveway / culvert$75
Mobile home / RV placement$50
Notice of Residential$50
Pre-development meeting$35
Residential Building Permit$100
Right-of-Way / Utility$75

The same schedule notes that County Clerk filing fees, commercial Fire Marshal fees and Health and Human Services septic charges are separate when applicable.

Commercial and Fire Marshal fees

The Dallas County Fire Marshal publishes a separate updated fee schedule. Among the listed charges are:

  • Building and site plans: $500 per 1,000 square feet of structure.
  • Fire & Safety Final Inspection: $150.
  • Separate fees for sprinkler systems, fire alarms, hazardous materials, fire pumps, standpipes, private hydrants and operational permits.
  • Reinspection and after-hours inspection charges may apply.

View the official Fire Marshal fee schedule PDF ↗

Best practice: ask for the current total before budgeting. A development permit, fire review, septic review, plat filing or other approval can have separate charges.

Septic / OSSF Permits

If the property uses an on-site sewage facility rather than a public sewer connection, Dallas County Health and Human Services handles the OSSF approval process.

The county says the system design is reviewed before an authorization to construct is issued, and the installation is inspected afterward. Application materials can include:

  • Floodplain verification
  • Site evaluation by a TCEQ-licensed site evaluator
  • Property plat or survey
  • OSSF design
  • Required maintenance contract or recorded affidavit for certain system types

Dallas County’s current Environmental Health fee page lists a $260 residential septic inspection fee and $310 commercial septic inspection fee, including the listed state fee. Reinspection and expedited-inspection charges are separate.

Official Dallas County Environmental Health / OSSF page ↗

How to Check Permit Status or Find Issued Permits

If you submitted through MGO Connect, sign in to the same customer account used for the application. Check the project record for requests, uploaded documents, review activity and available permit information.

Dallas County also publishes monthly reports of issued permits. The reports identify residential and commercial permits and can be useful when researching permits already issued by the county.

  1. Open the Dallas County Permit Reports page.
  2. Select the current year.
  3. Choose the applicable month.
  4. Review the permit number, issued date, permit type, description and site address.
  5. If you need a complete file rather than a monthly listing, contact DUAS with the property address and permit number.

Search Dallas County issued permit reports ↗

If the Property Is Inside the City of Dallas

Do not use the Dallas County unincorporated-area application simply because the property address says Dallas, Texas.

The City of Dallas uses its own development permitting system, DallasNow, for city planning and development applications, building permits, inspections and related services.

  1. Open the City of Dallas DallasNow portal.
  2. Use property information or the application search to confirm the location.
  3. Select the appropriate Building, Planning, Public Works or other service.
  4. Create or sign in to an account if you need to submit or manage an application.
  5. For City of Dallas permit assistance, the current portal lists 214-948-4480.

Open the official City of Dallas DallasNow portal ↗

Dallas County Contact Information

Office Best contact for Contact
Department of Unincorporated Area Services Development permits, application routing, residential notices, general county permitting 214-653-6565
Development@DallasCounty.org
500 Elm St., Suite 6100, Dallas, TX 75202
DUAS permit assistance Application and permit questions 214-653-6568
Dallas County Fire Marshal Commercial fire-code review, fire systems, applicable building/operational permits and inspections 214-653-7970
500 Elm St., Suite 0500, Dallas, TX 75202
Dallas County Health & Human Services On-site sewage / septic systems Environmental Health Division
Dallas County Public Works Floodplain and related public-works review Use the official Public Works floodplain resources for project-specific contacts

Common Mistakes That Cause Problems

  • Applying to Dallas County for a city property. Verify municipal boundaries first.
  • Assuming a mailing address determines jurisdiction. It does not always match the permitting authority.
  • Starting grading before development approval. Land disturbance can require approval even before vertical construction begins.
  • Ignoring floodplain status. Much of unincorporated Dallas County has floodplain considerations.
  • Submitting only building plans. A site plan, deed, survey, plat or authorization may also be required.
  • Forgetting septic approval. OSSF review is separate from ordinary building/development review.
  • Covering work before inspection. Confirm required inspection stages before concrete, drywall or other work hides regulated construction.
  • Using an old fee schedule as a final quote. Confirm the actual amount shown by the county or MGO.
  • Assuming a submitted application equals an issued permit. It does not.

Related Texas Building and Permit Guides

Permitting systems differ significantly across Texas. If you are comparing jurisdictions or working in more than one city, these guides may help:

Dallas County Building Department FAQs

1. Who handles building permits in Dallas County, Texas?

For property in unincorporated Dallas County, the Department of Unincorporated Area Services coordinates the county permit process with departments such as the Fire Marshal, Public Works, Health and Human Services and Road and Bridge. Properties inside a municipality generally use that city’s permitting department.

2. Does Dallas County issue permits inside the City of Dallas?

Generally, no. Dallas County states that its permits are for unincorporated areas. Projects inside the City of Dallas use City of Dallas Development Services and the DallasNow permitting system.

3. Can I apply for a Dallas County building permit online?

Yes. Dallas County directs applicants for unincorporated-area permits to MGO Connect. Select the Customer Portal, Texas and Dallas County Unincorporated, then create or sign in to an account.

4. What documents are required for a Dallas County permit?

Depending on the project, the county may require a completed application, authorization, fees, plat, property deed, scope of work, site plan, survey and project-specific drawings or technical documents.

5. How much is a Dallas County building permit?

There is no single fee for every project. Dallas County’s published DUAS schedule lists different charges for development permits, residential notices and other services, while commercial construction and fire-related work use separate Fire Marshal fees. The county tells applicants to confirm the current amount with DUAS.

6. Do I need a floodplain development permit in Dallas County?

Development within the Special Flood Hazard Area in unincorporated Dallas County requires floodplain review and an applicable development permit. Grading, filling, excavation and drainage changes can also trigger review.

7. How do I schedule or complete inspections in unincorporated Dallas County?

The procedure depends on the permit. Residential county materials identify foundation, framing/mechanical and completion stages, while building permits governed by the Fire Code have specific professional inspection and certification requirements. Follow the conditions attached to your issued permit and confirm the required sequence before covering work.

8. Does Dallas County require a permit for a new house?

The county’s current application list includes a Notice of Residential Construction for new residential construction, additions and major structural renovations. Development, floodplain, septic, driveway or other approvals may also apply depending on the property.

9. How do I check a Dallas County building permit?

Applicants can check their project through their MGO Connect account. Dallas County also publishes monthly issued-permit reports that show permit numbers, dates, permit types, descriptions and site addresses.

10. How long does a Dallas County building permit take?

Dallas County does not publish one universal approval time for every permit type. Review can involve multiple departments and depends on project complexity and whether the application is complete. The county does state that an application file remains open for one year from the date received, but that is not a promised review time.

Before you build: permit requirements are property- and project-specific. Use this guide to prepare, then use the official Dallas County or municipal portal for the final application, current fee, inspection requirement and permit decision.