El Paso Building Permits, Inspections and City Services
If you are here because you are building a house, remodeling, replacing a roof, adding a room, installing a pool, converting a garage, changing a commercial use, checking a permit or trying to schedule an inspection, the important first step is confirming that the property is actually inside the City of El Paso.
El Paso Planning & Inspections Contact Information
| Service | City of El Paso Planning & Inspections / One-Stop Shop |
|---|---|
| Address | 811 Texas Avenue, El Paso, TX 79901 |
| Main phone | (915) 212-0104 |
| OSSHelp@elpasotexas.gov | |
| Fax | (915) 212-0105 |
| Lobby hours listed by Planning & Inspections | Monday–Thursday, 8:00 a.m.–5:30 p.m.; Friday, 8:00 a.m.–11:30 a.m. |
| Call-center hours | Monday–Thursday, 7:00 a.m.–5:30 p.m.; Friday, 8:00 a.m.–11:30 a.m. |
| Online system | Accela Citizen Access |
| Inspection IVR | (915) 313-6100 |
The One-Stop Shop is the main intake point for land-development matters, building permits and many City licensing services. City staff from Planning & Inspections and related departments can also assist with questions that arise during design, plan review and construction.
Hours can change for holidays or operational reasons. Check the City’s current Planning & Inspections page before making a special trip.
Do You Need an El Paso Building Permit?
The City’s published permit guidance says a permit is required when work involves constructing, enlarging, altering, repairing, moving or demolishing a building or changing its occupancy. Separate electrical, mechanical, plumbing, irrigation or other trade permits can also apply.
Common work that may require a permit
| Project | El Paso guidance to check |
|---|---|
| New house, commercial building or addition | Building permit and applicable plan review |
| Structural interior or exterior remodeling | Building permit generally required |
| Garage conversion or ADU | Building, zoning and applicable trade review |
| Permanent HVAC installation | Mechanical permit may be required |
| Electrical or plumbing work | Applicable trade permit required depending on scope |
| Residential roof covering | City guidance identifies permit requirements when replacing 25% or more |
| Exterior doors or windows | Listed by the City among work requiring permit review |
| Pool or pond | City guidance identifies pools over 24 inches deep or certain above-ground pools of 5,000 gallons or more |
| Masonry wall or fence | City guidance lists masonry walls/fences over 42 inches |
| Chain-link fence | City guidance lists chain-link fences over 6 feet |
| Porch, awning or carport | Permit review may be required |
| Concrete supporting a structure or over 30 inches above grade | Permit review is identified in City guidance |
| Work on a City sidewalk or street | Separate City approval may be required |
For the City’s own project list, open the official “When Do I Need a Permit?” guide.
Examples of work the City lists as permit-exempt
- Replacement of a switch, receptacle, fuse, fan, light fixture or similar equipment when the work does not alter the mechanical, electrical or plumbing system.
- Ordinary minor nonstructural repair or finish work such as painting, papering and similar surface work.
- One qualifying accessory storage building or structure with less than 200 square feet of floor area, subject to the City’s stated conditions and easement restrictions.
How to Apply for an El Paso Building Permit
- Confirm the property is under City jurisdiction. If you are unsure, use the City’s official Planning and zoning map or contact the One-Stop Shop.
- Identify the permit type. Decide whether the work is new construction, an addition, residential remodeling, commercial alteration, tenant improvement, pool, fence, demolition, change of use or another regulated project.
- Download the correct City forms. Open the Planning & Inspections Forms & Docs page. The page contains the building permit application, homeowner authorization forms, adopted codes, sign applications, grading forms, zoning applications and contractor documents.
- Prepare the plans and project information. Include the project address, property information, owner and contractor details, scope, construction value, affected square footage and occupancy information that apply to your job.
- Submit electronically when appropriate. Open the Citizen Access Portal, create or sign into the appropriate account, choose the applicable permit service and submit the requested documents.
- Monitor review and invoices. Return to Citizen Access to check application status and invoices. Respond to plan-review corrections with the requested revised documents instead of starting work before the permit is issued.
- Keep the approved permit and plans available. Once issued, follow the permit conditions and schedule each required inspection before covering work that must be inspected.
What to Prepare Before You Submit
The City’s building permit application shows the information applicants should have ready. Preparing it before opening the portal can save time.
You can view the City’s official Building Permit Application before starting the online process.
Check zoning before paying for detailed plans
Zoning can determine whether the proposed use is allowed, required setbacks, parking, building height and whether additional site-development review is needed. The City says a property must be appropriately zoned for the intended use before a building permit can be issued.
If the proposed use is questionable, call the Planning Division at (915) 212-0088 before investing heavily in drawings or construction contracts.
El Paso Permit Fees and Plan-Review Charges
There is no single price for an El Paso building permit. The final amount can depend on the project type, size, valuation, plan review, trade permits and other required City services.
The City’s Planning & Inspections page currently lists the following plan-review and submittal amounts, effective September 1, 2025:
| Published item | Amount |
|---|---|
| Residential, tenant improvement or commercial alteration expedited plan-review submittal fee | $200 |
| New commercial or commercial shell expedited plan-review submittal fee | $400 |
| Residential submittal-fee deposit | $200, credited toward permit fee |
| Commercial submittal-fee deposit | $400, credited toward permit fee |
For the actual permit calculation, use the current City fee schedule linked under FY2027 Schedule C on the official Forms & Docs page. Checking the current schedule is safer than relying on an old flat-fee list because City fees and technology charges can change between fiscal years.
How to Check an El Paso Permit or Application Status
The City’s Citizen Access system is the main online starting point for applications, status information and invoices.
- Open El Paso Citizen Access.
- Choose the building or permit-related search/service area.
- Use the permit or record number when you have it. If not, use available property or project information.
- Open the matching record rather than assuming the first result is your project.
- Review the current status, fees, inspections and available record information.
- If an older record cannot be located online, contact the One-Stop Shop at (915) 212-0104 for the correct records-request path.
Keep your permit number. It is useful for status checks, inspection requests, invoices and conversations with City staff.
How to Schedule a Building Inspection in El Paso
The City’s published inspection-code sheet lists the Permitting IVR Inspection Line at (915) 313-6100. The automated system is available for scheduling, rescheduling, canceling and obtaining inspection results.
Before calling
Have these items ready:
- Your permit number.
- The inspection code for the stage of work.
- The required authorization-code digits associated with the permit or contractor registration.
IVR micro-steps
- Call (915) 313-6100.
- Follow the system prompt and enter the permit information.
- Press 1 to schedule an inspection.
- Press 2 to cancel or reschedule.
- Press 3 to obtain inspection results.
- Press 0 for department-staff assistance when available.
- Write down the confirmation number provided at the end of the transaction.
| Common published code | Inspection |
|---|---|
| 320 | Electrical final |
| 340 | Electrical rough |
| 610 | Mechanical rough |
| 630 | Mechanical final |
| 720 | Plumbing rough-in |
| 740 | Plumbing final |
| 800 | Final building inspection |
| 810 | Foundation inspection |
| 825 | Insulation inspection |
| 830 | Structural inspection |
| 840 | Sheathing inspection |
| 845 | Energy inspection |
| 850 | Sheetrock inspection |
| 1000 | Residential combination |
Not every inspection code applies to every permit. Use the City’s complete inspection-code sheet for the full list.
Building Codes Used in El Paso in 2026
The City’s current adopted-code sheet lists the following principal editions. Local El Paso amendments are part of the applicable requirements, so do not design a project from an unamended model code alone.
| Code | City-listed edition |
|---|---|
| International Building Code | 2021 IBC |
| International Residential Code | 2021 IRC |
| International Energy Conservation Code | 2021 IECC |
| International Mechanical Code | 2021 IMC |
| National Electrical Code | 2020 NFPA 70 NEC |
| International Plumbing Code | 2021 IPC |
| International Fuel Gas Code | 2021 IFGC |
| International Existing Building Code | 2021 IEBC |
| International Fire Code | 2021 IFC |
| International Swimming Pool and Spa Code | 2021 ISPSC |
| International Property Maintenance Code | 2021 IPMC |
| Accessibility | Texas Accessibility Standards and applicable ICC/ANSI A117.1 provisions |
The City also lists its Outdoor Lighting Code and landscape/irrigation requirements. Download the official adopted-code reference before finalizing construction documents.
If you want to understand why one city may use a different code edition from another, see our guide to finding the building code adopted by a city.
Can a Homeowner Pull an El Paso Building Permit?
The City’s permit guidance says a homeowner may be issued a permit for qualifying work upon proof of ownership. That does not automatically allow an owner to personally perform regulated electrical, plumbing, mechanical or other licensed trade work.
For a homeowner-managed project, confirm the owner-builder requirements with the One-Stop Shop and use the City’s homeowner/authorization forms where required.
Contractor registration
Contractors performing regulated work may need City registration plus applicable Texas licenses. The City’s current contractor-registration document identifies different requirements for general, electrical, mechanical, plumbing, irrigation, fire, sign and engineering-related contractors.
For example, the currently linked requirements document identifies general-contractor items such as business documentation, a City registration application, insurance and a blanket construction bond. Different state-licensed trades have their own requirements and exemptions.
Before hiring someone, ask:
- Who will actually pull the permit?
- Whose name will appear as contractor on the permit?
- Are required trade licenses current?
- Who will schedule and attend inspections?
- Who is responsible for correcting failed inspections?
- Will you receive proof that the final inspection passed?
Contractors can review the City’s official contractor registration requirements.
Final Inspection, Completion and Certificate of Occupancy
A permit should not simply be opened and forgotten after construction finishes. Required inspections must be completed and applicable final approvals obtained.
For commercial projects, new buildings and changes of occupancy, a Certificate of Occupancy or other final approval may be required before the space can legally be occupied for its intended use. Electrical, plumbing, mechanical, fire-protection and other required systems may need their own approvals before the building permit can close.
- Check the permit record for outstanding inspections.
- Complete required trade finals before requesting project closeout where applicable.
- Request the final building inspection.
- Correct any remaining deficiencies.
- Confirm the permit status shows the appropriate final approval or closure.
- Keep copies of the permit, final inspection and occupancy documentation with the property records.
Important El Paso Permit Details People Often Miss
El Paso Building Department FAQs
1. What department handles building permits in El Paso, Texas?
The City of El Paso Planning & Inspections Department handles building permitting, plan review, inspections and related development services within City jurisdiction. The main One-Stop Shop is at 811 Texas Avenue.
2. How do I apply for an El Paso building permit online?
Open the City’s Citizen Access Portal, select the applicable permit service, enter the property and project information, upload the required plans or forms and submit the application. Monitor the same system for status and invoices.
3. What is the El Paso Building Department phone number?
The main Planning & Inspections One-Stop Shop number is (915) 212-0104. The City’s automated permitting inspection line is (915) 313-6100.
4. Do I need a permit to remodel my house in El Paso?
Structural remodeling generally requires a permit. Ordinary minor nonstructural finish work may be exempt, but plumbing, electrical, mechanical, zoning, historic or other requirements can still apply. Confirm the exact scope before starting.
5. Does El Paso require a permit for a storage shed?
The City’s published guidance identifies one accessory storage building or structure under 200 square feet as a possible permit exemption, subject to stated conditions. It cannot simply be placed over a utility easement, and zoning or historic rules may still apply.
6. Is a permit required to replace a roof in El Paso?
The City’s permit guidance states that a residential roof-covering permit is required when 25% or more of the covering is being replaced. Confirm the current requirement for the exact project before work begins.
7. How do I schedule an El Paso building inspection?
Use the City’s IVR inspection line at (915) 313-6100. Have the permit number, applicable inspection code and required authorization information ready. The system can schedule, cancel, reschedule and report inspection results.
8. Which building codes does El Paso use in 2026?
The City’s adopted-code reference lists the 2021 International Building Code, 2021 International Residential Code and several other 2021 International Codes, together with the 2020 National Electrical Code and local amendments.
9. Can a homeowner obtain their own building permit in El Paso?
The City’s guidance allows qualifying homeowners to obtain permits upon proof of ownership. Licensed or registered contractors may still be required for regulated electrical, plumbing, mechanical and other trade work.
10. Does El Paso County issue the same building permits as the City of El Paso?
No. City and unincorporated county jurisdiction are different. El Paso County states that it does not issue ordinary building permits or exercise zoning authority for unincorporated property and directs applicants to the appropriate ESD and county development processes.
Before You Start Your Project
For most El Paso projects, the safest order is simple: confirm jurisdiction → check zoning → determine the permit type → prepare complete documents → submit through the official City process → wait for issuance → schedule inspections at the required stages → obtain final approval.
If one detail is unclear, call the One-Stop Shop at (915) 212-0104 before beginning regulated work. A short question before construction is usually much easier than correcting work that was built under the wrong permit, wrong zoning assumption or wrong inspection sequence.
Information reviewed for 2026 using current publicly available City of El Paso and El Paso County resources. USBuilding.org is an independent informational website and does not issue permits or make official code determinations. City rules, fees and portal procedures can change.