Fort Myers Building Permits, Inspections & Official Services
If you are building, remodeling, replacing a roof, installing an air conditioner, adding a pool, changing electrical or plumbing work, opening a commercial space, or checking an existing permit in Fort Myers, the City of Fort Myers Building, Permitting & Inspections Division is the main office to know—as long as the property is actually inside Fort Myers city limits.
The City of Fort Myers Building, Permitting & Inspections Division is located at 1825 Hendry Street, Fort Myers, FL 33901. The main permitting number is 239-321-7925. Permit applications, permit status, fees, document uploads and inspection requests are handled through the City’s EnerGov Customer Self Service Portal.
First Check: Is the Property Inside Fort Myers City Limits?
This is one of the most important steps. A postal address that says “Fort Myers” does not automatically mean the City of Fort Myers issues the building permit. Some properties with Fort Myers mailing addresses are outside municipal limits and may instead fall under Lee County or another jurisdiction.
Before paying for plans or submitting an application, use the City’s official “Am I in the City?” map.
- Open the official city-limit map.
- Search the project address.
- Confirm whether the parcel falls within the City of Fort Myers municipal boundary.
- If the parcel is outside the city, stop before submitting a Fort Myers permit and identify the correct permitting authority.
Fort Myers Building Department Contact Information
| Need | Official information |
|---|---|
| Department | City of Fort Myers Building, Permitting & Inspections Division |
| Office | 1825 Hendry Street, Fort Myers, FL 33901 |
| Main permitting | 239-321-7925 |
| Permitting email | permits@fortmyers.gov |
| Inspections | 239-321-7923 |
| Plan review | 239-321-7915 |
| Flood questions | 239-321-7931 |
| Building Official | Brent Brewster — 239-321-7932 |
| Online system | Tyler EnerGov Customer Self Service |
The City’s general City Hall schedule is Monday through Friday, 8:00 a.m.–5:00 p.m., but permit-counter procedures can differ from general City Hall hours. If you are making a special trip to Hendry Street, calling the permitting office first is sensible.
What the Building, Permitting & Inspections Division Handles
The Fort Myers BPI Division is responsible for several separate stages of construction approval. Understanding the difference makes the process easier.
| Service | What it means for you |
|---|---|
| Permit intake | Applications and required documents are received and checked before review. |
| Plan review | Construction plans are reviewed for applicable building, plumbing, mechanical, electrical, accessibility, flood, life-safety and related requirements. |
| Permit issuance | A permit can be issued after required reviews, documents and fees are completed. |
| Inspections | Inspectors check regulated work at required construction stages before it is concealed or finalized. |
| Contractor registration | Contractors must have required licensing and registration information accepted by the City. |
| Certificate of Occupancy | Applicable new residential and commercial buildings must complete required final approvals before occupancy. |
What Work Usually Requires a Fort Myers Permit?
Fort Myers states that building permits are required to construct, alter, repair, move or demolish a building or structure and for a change of building occupancy. Site work and land alterations can require separate permits as well.
Common projects that may need a City permit or trade permit include:
- new homes and commercial buildings;
- room additions and structural alterations;
- interior remodels involving regulated building systems;
- roof replacement and significant roof repairs;
- electrical service, panels, wiring and alterations;
- plumbing work and irrigation work;
- air-conditioning and mechanical work;
- fuel-gas systems;
- pools and spas;
- solar installations;
- demolition;
- signs;
- site work and land alteration;
- certain fences, sheds and accessory structures;
- changes in occupancy or use that trigger building-code review.
The City’s permit page includes separate applications and checklists for structural building permits, electrical, mechanical, plumbing/irrigation, fuel gas, roofing, pools, solar, signs, site work, demolition, fences, generators, sheds and other project types.
How to Apply for a Fort Myers Building Permit Online
Fort Myers uses the EnerGov Customer Self Service Portal for electronic permitting. The portal is also used to check permit status, pay fees and request inspections.
- Confirm the jurisdiction. Use the City’s “Am I in the City?” map before creating the permit application.
- Open the City’s Permits & Applications page. Select the application and checklist that match the actual scope of work.
- Prepare the job information. For a structural application, expect information such as the property address, STRAP/parcel information, project name, job valuation, owner, applicant contact and contractor details.
- Open EnerGov Customer Self Service. Register or sign in to the appropriate account.
- Create the correct permit record. Avoid choosing a similar permit category simply to get the application started.
- Upload the application, plans and required supporting documents. Use complete, readable files and make sure information is consistent across every document.
- Monitor plan review. If City staff issue corrections, review every comment and upload a complete revision through the portal.
- Pay assessed fees. The City sends fee information when applicable; payment can be completed through EnerGov.
- Wait for issuance before regulated work begins. Approval of an uploaded application is not the same thing as an issued permit.
- Schedule inspections at the required stages. Do not cover work that still requires inspection.
Documents to Prepare Before You Submit
The City’s published new/addition/alteration checklist gives a good picture of what commonly causes incomplete applications. Requirements change by project, but the following items are especially important.
| Stage | Common requirements |
|---|---|
| At application | Permit application, property information, project valuation, owner details, contractor information, plans/specifications and applicable energy calculations. |
| Commercial project | A Letter of Intent may be required in addition to project-specific commercial documentation. |
| Before issuance | Current contractor registration, debris affidavit, applicable asbestos documentation and proof of ownership when public records do not yet reflect a recent transfer. |
| Before inspections | Required subcontractor information and a recorded Notice of Commencement when applicable. |
| New building/addition | Site plan, survey information, setbacks, flood information, drainage information and other project-specific site details may be required. |
| Windows/doors/roof systems | Applicable Florida Product Approval or Notice of Acceptance information and wind-design documentation may be required. |
The City’s current form library also includes contractor registration, authorized-agent forms, owner-builder paperwork, Notice of Commencement forms, revision applications, permit-extension requests, private-provider documents, roof affidavits, subcontractor forms and window/door/shutter worksheets.
How Long Does Fort Myers Plan Review Take?
The City’s published BPI page provides average calendar-day time frames. These are averages rather than guaranteed completion dates and include review by applicable departments and trades.
| Project type | Intake | Plan review | Processing after review | Average total |
|---|---|---|---|---|
| Single-family new / remodel | 3 days | 7 days | 2 days | 12 days |
| Commercial new / remodel | 3 days | 17 days | 2 days | 22 days |
| Multi-family new / remodel | 3 days | 13 days | 2 days | 18 days |
A correction cycle will normally extend the real project timeline. The fastest practical approach is to submit the exact checklist items the first time and answer every review comment together instead of making partial revisions.
Fort Myers Building Permit Fees in 2026
Fort Myers revised its permit fee structure through Resolution 2025-96, effective August 5, 2025. The City publishes separate calculators for general permits, demolition, building relocation and site permits, plus a schedule for over-the-counter permits.
Some currently published flat-fee examples are:
| Permit example | Published total |
|---|---|
| Single-family A/C existing replacement or repair | $102 |
| Single-family new electrical | $157 |
| Single-family garage door replacement | $102 |
| Single-family mechanical existing repair | $102 |
| Single-family plumbing new | $157 |
| Single-family re-roof / roof-over / roof repair | $157 |
| Commercial / multi-family re-roof / roof-over / roof repair | $217 |
These examples should not be treated as a quote for a different project. Valuation, plan review, site work, additional trades and other project-specific requirements can affect the final invoice.
For the most accurate amount: open the City’s official Permit Fees page, select the correct calculator and use the actual project information.
How to Schedule a Fort Myers Building Inspection
Inspections are requested through EnerGov. Fort Myers requires the permit number and the City’s three-digit code for the inspection being requested.
- Open EnerGov Customer Self Service.
- Sign in and locate the issued permit.
- Confirm the permit is active and the required subcontractor information has been validated.
- Select the correct inspection type and three-digit inspection code.
- Submit the request before the City’s scheduling cutoff when you need the earliest available day.
- Return to the permit record to review scheduling information and results.
For Service Change, Re-roof Dry-In and Re-roof In-Progress inspections, the City’s system allows the permit holder to request an estimated inspection hour between 8:00 a.m. and 3:00 p.m.
The system can also block an inspection request when required subcontractor information for electrical, plumbing, mechanical, roofing or gas work has not been validated.
Fort Myers Notice of Commencement Requirements
A Notice of Commencement, commonly called an NOC, can become important before inspections begin.
The City’s current NOC instructions state that a Notice of Commencement is required before scheduling inspections when the job valuation exceeds $5,000, or $15,000 for HVAC change-outs, subject to applicable Florida law and exemptions.
Fort Myers specifically instructs applicants to make sure:
- the property address, parcel number or legal description matches the permit application and Lee County property records;
- the description of work matches the permit application;
- the owner information is consistent with the property record;
- the contractor shown on the NOC matches the permit or main project permit;
- the NOC is recorded and certified through the Lee County Clerk of Courts when required.
The City warns that if a permit has not been issued, an NOC can become null and void 90 days after recording. After permit issuance, it generally becomes null and void one year after recording unless another duration is specified.
Use the City’s official forms page for the NOC form, affidavit of filing and current instructions.
Can a Homeowner Pull an Owner-Builder Permit?
Florida law allows qualifying owners to act as their own contractor under specific conditions, but the owner-builder route transfers significant responsibility to the property owner.
Fort Myers’ published structural checklist states that an owner acting as his or her own contractor must personally appear to sign the application. The City notes that notary service is available.
The City’s owner-builder affidavit explains that the owner becomes the responsible party of record, must provide direct on-site supervision and cannot simply use an owner-builder permit so an unlicensed person can operate as the contractor.
Contractor licenses can be checked through the Florida Department of Business and Professional Regulation.
Certificate of Occupancy: What Must Be Finished?
A Certificate of Occupancy is required for applicable new residential and commercial building structures before they are occupied for living or business purposes.
Fort Myers lists several items that must be resolved:
- all required final inspections must show a passing disposition;
- trade sub-permits and affiliated permits must be finaled;
- the Engineering Division must receive and approve the required final as-built documentation;
- all project fees, including applicable solid-waste assessments, must be paid.
The City’s CO process begins after the final building inspection, identified by the City as inspection 199, passes. When all requirements are satisfied and no fees remain due, the City states that a CO is usually issued within a couple of business days.
Which Building Code Applies in Fort Myers in 2026?
As of November 2, 2026, Florida’s statewide effective code is the Florida Building Code, 8th Edition (2023), which became effective December 31, 2023.
The Florida Building Commission has scheduled the 9th Edition (2026) Florida Building Code to become effective on December 31, 2026. Projects submitted close to that transition should confirm which edition applies to the specific application and permit timing.
Fort Myers’ new/addition/alteration checklist currently references the 8th Edition Florida Building Code and related applicable codes, along with the City’s ordinances and other state requirements.
If you want a broader explanation of why code editions and local amendments can differ by jurisdiction, see our City Building Code guide.
Common Reasons Fort Myers Permit Applications Get Delayed
Most delays are not caused by one mysterious rule. They usually come from incomplete or inconsistent information.
- The property is outside Fort Myers city limits.
- The wrong permit type was selected.
- The project description is too vague.
- The property address or parcel information does not match official records.
- Required plans, surveys, site information or product approvals are missing.
- Contractor registration is incomplete.
- Required subcontractor information has not been validated.
- Flood-zone or finished-floor information is missing where applicable.
- Review comments were only partly answered.
- A required Notice of Commencement has not been recorded or submitted.
- Work requiring inspection was covered before approval.
A Practical Fort Myers Permit Workflow
- Confirm the parcel is inside Fort Myers city limits.
- Determine the exact permit type.
- Open the matching City application and checklist.
- Check zoning, flood, site and contractor requirements before finalizing plans.
- Prepare complete plans and supporting documents.
- Submit through EnerGov.
- Monitor review comments and answer them completely.
- Pay assessed fees.
- Receive the issued permit before starting regulated work.
- Record the Notice of Commencement when required.
- Request inspections before regulated work is concealed.
- Complete final inspections and obtain the required completion or occupancy approval.
If you are researching another Florida jurisdiction, remember that the process can be completely different even within the same state. For comparison, see the Clermont Building Department guide or the Citrus County Building Department guide.
Fort Myers Building Department FAQs
1. Where is the Fort Myers Building Department located?
The City of Fort Myers Building, Permitting & Inspections Division is located at 1825 Hendry Street, Fort Myers, Florida 33901.
2. What is the Fort Myers Building Department phone number?
The main permitting number is 239-321-7925. The City also lists 239-321-7923 for inspections, 239-321-7915 for plan review and 239-321-7931 for flood-related assistance.
3. How do I apply for a Fort Myers building permit online?
Confirm that the property is inside Fort Myers city limits, open the City’s permit application and checklist page, prepare the required documents, then submit the application and plans through the EnerGov Customer Self Service Portal.
4. Can I search a Fort Myers permit online?
Yes. The City directs users to EnerGov Customer Self Service to review permit information, check status, pay fees, submit electronically and manage inspection-related tasks.
5. How do I schedule a Fort Myers building inspection?
Use EnerGov, open the issued permit and select the required inspection using the permit number and applicable three-digit inspection code. Requests received after 5:30 a.m. are scheduled for the next business day under the City’s published procedure.
6. How much does a Fort Myers building permit cost?
The cost depends on the permit type and project. Fort Myers publishes permit calculators and flat-fee schedules. For example, the current published total for a single-family re-roof is $157, while larger structural and site permits use other calculations.
7. When is a Notice of Commencement required in Fort Myers?
The City’s current instructions state that an NOC is required before inspections when the job valuation exceeds $5,000, or $15,000 for HVAC change-outs, subject to applicable statutory exemptions and project conditions.
8. Can a homeowner act as an owner-builder in Fort Myers?
A qualifying owner may use Florida’s owner-builder exemption, but strict conditions apply. Fort Myers requires the owner acting as contractor to personally appear to sign the application, and the owner accepts responsibility for supervision and compliance.
9. How long does Fort Myers plan review take?
The City’s published averages list about 12 calendar days total for single-family new/remodel projects, 18 days for multi-family new/remodel projects and 22 days for commercial new/remodel projects. These are averages, not guaranteed completion dates.
10. Which Florida Building Code applies in Fort Myers in 2026?
As of November 2, 2026, the Florida Building Code, 8th Edition (2023), remains the effective statewide edition. The 9th Edition (2026) is scheduled to become effective December 31, 2026.
Before You Start Work
The safest order is simple: confirm jurisdiction → identify the correct permit → prepare the exact checklist documents → submit through EnerGov → answer review comments → obtain the issued permit → complete required inspections → close the permit properly.
Do not rely on a Fort Myers mailing address alone, do not begin regulated work just because an application has been uploaded, and do not cover work that still needs inspection. A few minutes spent checking the jurisdiction and project checklist can prevent days of avoidable rework.
Information reviewed for November 2026. USBuilding.org is an independent informational resource and is not operated by or affiliated with the City of Fort Myers. Permit forms, fees, code editions, portal functions and procedures can change. For a binding decision about a specific property or project, the responsible government department remains the final authority.