Greenacres, Florida · 2026 permit guide · Information reviewed November 2026

Greenacres Building Permits, Inspections & City Services

Quick answer: If your property is inside the City of Greenacres, Florida, building permits, construction plan review and building inspections are handled by the City of Greenacres Building Division, part of Development & Neighborhood Services.

For new permit applications in 2026, Greenacres uses MyGovernmentOnline (MGO Connect). The City stopped accepting new permit applications by ordinary email in April 2026. MGO is now used to submit applications, track reviews, receive notifications, pay applicable fees and schedule inspections for newer permits.

Building Division: 5800 Melaleuca Lane, Greenacres, FL 33463
Main phone: 561-642-2052
Permit assistance: 561-642-2059 / 561-642-2062
Office hours: Monday–Friday, 8:00 a.m.–4:30 p.m.
Fax: 561-642-2049

Greenacres Building Division Contact Information

Official office City of Greenacres Development & Neighborhood Services — Building Division
Address Greenacres City Hall, 5800 Melaleuca Lane, Greenacres, FL 33463
Building Division 561-642-2052
Permit assistance 561-642-2059 / 561-642-2062
Building Official MacArthur Megie — published City directory: 561-642-2061
Planning, Engineering & GIS 561-642-2054
Code Compliance 561-642-2043
Office hours Monday–Friday, 8:00 a.m.–4:30 p.m.
Online permit system MyGovernmentOnline / MGO Connect

The Building Division handles more than permit intake. Its published functions include plan review, permit issuance, construction inspections, contractor enrollment, floodplain management, Certificates of Occupancy and Completion, and related code-compliance functions.

First Check: Is Greenacres the Correct Permitting Authority?

Do this before you upload plans or pay anything. A postal address that includes “Greenacres” does not by itself prove that the parcel is within incorporated City limits. Properties outside the municipality can be subject to a different permitting authority.

  1. Start with the complete street address. Do not rely only on the ZIP code or mailing-city name.
  2. Check Greenacres City mapping or permit records. The City’s official Business Resources page specifically points users to the City map for jurisdiction checks.
  3. Search the property in the City’s existing permit database. An existing history under that address is useful evidence, although annexations and older records can complicate historical searches.
  4. If the jurisdiction is still unclear, call 561-642-2052 and give staff the exact property address before filing a new application.
Local permitting matters: municipalities in Palm Beach County maintain separate systems. If your project is actually in another city, use that city’s process rather than Greenacres. USBuilding.org also has separate guides for the Boynton Beach Building Department, Delray Beach Building Department and Boca Raton Building Department.

What Work May Need a Greenacres Building Permit?

Florida law generally requires permits for regulated construction, alteration, repair, modification and demolition unless a specific exemption applies. Greenacres also reviews building applications for applicable zoning, setbacks and other local requirements.

Projects that commonly involve a permit or project-specific review include:

  • New homes, additions and new commercial construction
  • Interior or exterior alterations affecting regulated building systems
  • Roof replacement and reroofing
  • Window and exterior-door replacement
  • Electrical work and electrical service changes
  • Plumbing alterations and certain fixture or equipment replacements
  • Air-conditioning and mechanical work
  • Gas work
  • Pools and pool-related construction
  • Accessory structures
  • Demolition
  • Signs and sign structures
  • Some fences, site improvements and other property improvements
  • Commercial tenant build-outs and occupancy-related work

The City’s forms library currently lists project resources including an accessory-structure package, A/C change-out package, demolition package, roof package, swimming-pool checklist, sign checklist, Certificate of Occupancy forms, Notice of Commencement and owner-builder documents.

Check Greenacres Building Forms →

Do not assume every low-cost job is automatically permit-free. Florida’s 2026 law creates a limited exemption for certain work valued below $7,500 on single-family property, but the exemption does not apply to electrical, plumbing, structural, mechanical or gas work, and it does not apply when the property is partly or entirely in a Florida Building Code flood hazard area. A written exemption request with documentation of the work and value is also required. See Florida Statute 553.79 before relying on this exemption.

How to Apply for a Greenacres Building Permit in 2026

The most important change for current applicants is the move to MGO Connect. Greenacres states that new permit applications are no longer accepted through the former email-submission method.

  1. Confirm the property is in Greenacres.
    Verify the correct permitting jurisdiction before preparing an application.
  2. Identify the exact permit type.
    A roof, pool, A/C change-out, demolition, sign or accessory structure may use different documents. Review the City’s forms and project packages.
  3. Create an MGO Connect account.
    Open MGO Connect, choose the new-account option, enter your user information and complete account verification. When selecting a jurisdiction, look for Greenacres.
  4. Start the appropriate Greenacres permit application.
    Enter the project property, owner/applicant information, scope of work and other requested information accurately.
  5. Upload the required plans and supporting documents.
    Use the checklist for your project instead of uploading a generic document set. Plans requiring professional signatures or seals must satisfy applicable requirements.
  6. Submit the application and application fee.
    Greenacres’ published fee schedule states that a $75 non-refundable application fee is due when the application is submitted and is applied toward the total permit fee when the permit is issued.
  7. Monitor the MGO record.
    Watch for plan-review comments, missing-item notices, fee notifications or requests for revisions. Respond within the existing application rather than creating a duplicate permit.
  8. Pay the remaining assessed fees.
    The amount depends on the work. A credit-card convenience fee may apply.
  9. Wait for permit issuance before starting regulated work.
    Keep the permit and approved documents available as required during construction.
  10. Schedule each required inspection.
    Follow the inspection sequence attached to your permit and do not cover work that must remain visible for an inspector.

The City’s current permit instructions are available at Applying for a Permit and Building Permits.

What Should You Prepare Before Applying?

There is no single document package for every project. A roof permit is not reviewed like a new commercial building, pool or accessory structure. Still, preparing the following before opening MGO can prevent simple delays:

Item Why it may be needed
Property address and owner information Connects the application to the correct parcel and responsible owner.
Clear scope of work Helps staff identify the correct permit type and reviews.
Project valuation Greenacres’ published building-permit charges are partly valuation based.
Construction plans Needed when the project requires plan review.
Survey or site plan May be required when setbacks, location, accessory structures or site conditions matter.
Product approvals May apply to regulated building products such as roofing, windows and doors.
Contractor information Required when licensed work is performed by a contractor.
Owner-builder affidavit Required when a qualifying property owner uses the owner-builder exemption.
Notice of Commencement Required for qualifying Florida construction projects before the applicable inspection stage.
Project-specific checklist Roof, pool, demolition, A/C and other projects can have different submittal requirements.

Greenacres has a legacy public ePermit search that remains useful for existing and historical records. The search can display permit and inspection information without requiring you to guess whether a project was recently submitted in MGO.

Search by property address

  1. Open the City’s Public Permit Search.
  2. Use the Service Address field when you do not know the permit number.
  3. Enter the address and select the matching property.
  4. Open the relevant permit from the results.
  5. Review the available permit status and inspection information.

Search by permit number

If you already know the approved permit number, search by Permit Type and Permit Number. The legacy system warns users not to combine the permit-number search and service-address search at the same time.

Application still under review? The City’s legacy search states that applications in review may need to be searched by service address rather than permit number.

Older record not online?

The City warns that some older permit records may require additional research rather than appearing in the online database. Call 561-642-2062 or 561-642-2059 with the property address, approximate permit year and any permit number you have.

For formal archived material or other City records, Greenacres also provides a Public Records Request process.

How to Schedule a Greenacres Building Inspection

The correct method depends on when the permit entered the City’s system.

Permit Current scheduling method
Submitted on or after April 15, 2026 Schedule through the MGO contractor/permit portal.
Submitted before April 15, 2026 Use the City’s legacy procedure; the current inspection page directs applicants to call 561-642-2062 or use the listed inspection contact.

Greenacres publishes the following important inspection rules:

  • Requests are scheduled Monday through Friday.
  • The City’s current inspection page sets a 3:00 p.m. business-day cutoff for next-day requests.
  • Same-day inspections are not permitted.
  • A Monday inspection should be requested by 3:00 p.m. Friday.
  • To cancel, provide notice no later than 8:30 a.m. on the inspection day.
  • Have the permit number, job-site address, inspection type/code, contact name and phone number ready.
  • If a Notice of Commencement is required, submit the required certified/recorded documentation before the applicable inspection to avoid a delay.

Special inspection sequences worth knowing

Windows and doors: Greenacres states that window and door installations require a buck inspection before final inspection. The inspector may determine whether photographs are acceptable in a particular situation.

Roof installations: the City’s inspection instructions identify sheathing, tin tag and in-progress inspections before final and state that affidavits are not being accepted in place of those required roof inspections.

Open the current Greenacres inspection instructions →

Greenacres Building Permit Fees

Greenacres does not use one flat permit price. Its current published fee schedule is effective October 1, 2024 under Resolution 2024-46 and includes valuation-based permit fees, plan-review charges, reinspections, revisions and other project-specific charges.

Published fee item Greenacres fee
Application fee $75 non-refundable; applied toward total permit fee upon issuance
Construction value $0–$100,000 2.5%; $75 minimum
$100,001–$300,000 Additional 2% according to City’s published schedule
Value over $300,000 Additional 1.25% according to City’s published schedule
Qualifying sub-permit with value included in master permit and no independent review $30
First reinspection $50
Second reinspection of same type $100
Third/subsequent reinspection of same type $200
First 90-day permit extension before expiration $50
Second 90-day extension $25
Change of contractor after issuance — primary permit $50
Work without required permit Published schedule lists 4× permit fee, plus applicable offense charges

Commercial plan-review fees and other charges can also apply. Greenacres notes that credit-card payments may carry a convenience fee and that other City or state-agency charges may be assessed separately.

For the current full schedule, use the official Greenacres Building Division Permit Fees page.

Starting work first can be expensive. The City’s published schedule lists a work-without-permit penalty of four times the permit fee, with additional offense charges. If work has already started, contact the Building Division before covering or continuing regulated work.

Notice of Commencement: What Greenacres Applicants Should Know

A Florida Notice of Commencement, commonly called an NOC, is separate from the building-permit application itself. Greenacres specifically warns that a required NOC must be on file before the applicable inspection is requested.

Under the 2026 Florida Construction Lien Law, the permitting authority generally requires a copy of the recorded Notice of Commencement before the first inspection when the direct construction contract is greater than $5,000. The rule does not apply to a direct contract to repair or replace an existing heating or air-conditioning system when that contract is less than $15,000.

  1. Use the City’s forms page to obtain the current NOC resource.
  2. Complete the property, owner, contractor and project information correctly.
  3. Execute and record the NOC as required by Florida law.
  4. Keep the recorded information/certified copy.
  5. Submit the required NOC evidence to Greenacres before the applicable inspection stage.
  6. Keep the required notice posted at the project site.

For the statutory details, see Florida Statute 713.135.

Can a Greenacres Homeowner Pull an Owner-Builder Permit?

Potentially, yes. Greenacres provides an Owner-Builder Affidavit and Disclosure Statement for qualifying owners of one-family or two-family residential property. The exemption is not simply permission to hire unlicensed people to run a construction project.

When you use the owner-builder route, you become the responsible party of record for the permit and accept legal and practical responsibilities normally handled by a licensed contractor.

Before choosing owner-builder: read the disclosure completely. If someone else is effectively acting as the contractor, supervising the entire project or offering to “use your owner-builder permit” to avoid contractor licensing, stop and verify the arrangement with the Building Division.

The City’s forms page says the owner-builder affidavit must be completed by the property owner, notarized and submitted with the permit application. Review the official Owner-Builder Affidavit before applying.

Which Building Code Applies in Greenacres in 2026?

As of November 2026, the statewide code currently in effect is the Florida Building Code, 8th Edition (2023), which became effective December 31, 2023.

The 9th Edition (2026) Florida Building Code is scheduled to take effect December 31, 2026. Projects being designed or submitted close to that transition should confirm the applicable code edition with Greenacres before finalizing construction documents or product approvals.

The Florida Building Code includes separate volumes for subjects such as Building, Residential, Existing Building, Accessibility, Energy Conservation, Mechanical, Plumbing and Fuel Gas. Electrical, fire, local zoning, floodplain and other regulations can also affect a project.

Use the Florida Building Code Online system for statewide code resources and the City’s Building Division News & Information page for local updates.

Extra Checks That Can Affect a Greenacres Permit

1. Zoning and setbacks

A building-code-compliant design can still fail zoning review. Greenacres states that Building works with Planning and Engineering to review permit applications for setbacks, height and other applicable regulations.

This is especially important for additions, accessory structures, pools, fences, signs, changes of use and site work. For Planning, Engineering and GIS questions, call 561-642-2054.

2. Floodplain requirements

The Building Division also provides floodplain-management services. Greenacres maintains elevation-certificate information and publishes local flood resources. If the property is in a flood-hazard area, additional elevation, substantial-improvement or flood-resistant construction requirements can affect the project.

Use the City’s Hurricane, Storm & Flood information or contact the Building Division at 561-642-2052 for a project-specific flood-zone question.

3. Engineering and right-of-way work

Work involving the public right-of-way or engineering improvements can require a separate Engineering or Right-of-Way permit, supporting checklist and filing fee.

Greenacres publishes applications and worksheets on its Engineering and ROW Permits page.

4. Palm Beach County impact fees

The Greenacres Building Division notes that Palm Beach County impact-fee schedules changed effective January 1, 2026 and may change again under the County’s published schedule. New construction and certain development can therefore involve costs outside the City’s ordinary building-permit fee.

5. Contractor registration

Contractors should make sure their Greenacres enrollment and account information are current before attempting to work with permit records. The City directs contractor-enrollment questions to permit staff at 561-642-2059 or 561-642-2062.

Common Problems and the Fastest Practical Next Step

Problem What to do
You cannot find the permit online Try the property address instead of the permit number. For older records, call the Building Division.
You are unsure whether a permit is required Describe the exact work, address and estimated value to Greenacres permit staff before starting.
Your project is under $7,500 Do not assume exemption. Check whether the work is electrical, plumbing, structural, mechanical or gas, whether the property is in a flood hazard area, and whether the written exemption process applies.
MGO application is waiting Open the application and check for review comments, missing documents, required corrections or an unpaid invoice.
You cannot schedule an inspection Confirm the permit is issued, earlier required inspections are complete and any required NOC is on file.
An inspection failed Read the inspector’s correction information, fix the cited item and request the appropriate reinspection. Reinspection fees can apply.
The permit is close to expiration Contact the Building Division before expiration. Greenacres publishes extension and expired-permit renewal charges.
Work started without a permit Stop regulated work and contact the City. Do not hide or cover work that may need inspection.

Greenacres Building Department FAQs

1. Where is the Greenacres Building Department?

The official City office is the Greenacres Building Division within Development & Neighborhood Services at Greenacres City Hall, 5800 Melaleuca Lane, Greenacres, FL 33463.

2. What is the Greenacres Building Department phone number?

The Building Division main number is 561-642-2052. Permit assistance is also published at 561-642-2059 and 561-642-2062.

3. How do I apply for a Greenacres building permit in 2026?

New applications are submitted electronically through MGO Connect. Create an account, select Greenacres, choose the correct permit type, complete the application, upload the required documents, pay the applicable application fee and monitor the record for review comments and approval.

4. Can I email a new Greenacres permit application?

Not for the current new-permit process. Greenacres moved new applications to MGO in April 2026. Older projects that entered the former system can have different revision or resubmittal procedures.

5. How do I search for a Greenacres building permit?

Use the City’s public ePermit search and search either by service address or the applicable permit type and permit number. If an older record is unavailable online, contact the Building Division for additional research.

6. How do I schedule a Greenacres inspection?

For permits submitted on or after April 15, 2026, use MGO. The City’s current inspection instructions require next-business-day requests by 3:00 p.m., do not allow same-day inspections, and require Monday requests by the preceding Friday deadline.

7. How much is a Greenacres building permit?

There is no single flat price. Greenacres charges a $75 non-refundable application fee that is applied toward the permit fee at issuance, while the remaining permit amount depends on construction valuation, permit type, plan review and other applicable charges.

8. Can I pull my own permit as an owner-builder in Greenacres?

A qualifying owner of a one-family or two-family residential property may be able to use Florida’s owner-builder exemption. Greenacres requires its owner-builder affidavit/disclosure documentation, and the owner assumes responsibility for the permit and compliance obligations.

9. When is a Notice of Commencement required?

Florida’s 2026 Construction Lien Law generally requires the permitting authority to receive the required recorded NOC information before the first inspection when the direct contract exceeds $5,000. An exception applies to qualifying repair or replacement of an existing heating or A/C system when the direct contract is below $15,000.

10. Which Florida Building Code is Greenacres using in November 2026?

The Florida Building Code, 8th Edition (2023) remains the current statewide edition in November 2026. The 9th Edition (2026) is scheduled to become effective December 31, 2026, so applicants with projects near the transition should confirm the applicable edition before finalizing plans.

Before You Submit

The simplest way to avoid a preventable Greenacres permit problem is to get four things right at the beginning: confirm the property is actually within City jurisdiction, select the correct permit type, prepare the project-specific documents, and use the current MGO workflow.

Then keep the same permit record through plan review, payment and inspections. If the project involves zoning, floodplain issues, a right-of-way, a Notice of Commencement or an owner-builder exemption, resolve that requirement before it becomes an inspection hold.

For the final project-specific decision, start with the official Greenacres Building Division or open MGO Connect.

Information reviewed November 2026 using City of Greenacres Building Division pages, current permit and inspection instructions, the City’s published fee schedule and forms, Florida Building Commission resources, and the 2026 Florida Statutes. USBuilding.org is an independent informational resource and is not affiliated with the City of Greenacres. Permit requirements, fees, personnel, portal procedures and code rules can change; the Building Official and current permit record control project-specific requirements.