Lehi Building Permits & Inspections: What to Do First

If you searched for the Lehi Building Department, the office you need is Lehi City’s Building and Inspection Department. It handles building permits, plan review and construction inspections for projects under Lehi City jurisdiction.

Quick answer: Building permit applications are submitted online through Lehi City’s Building Permit Submittal Portal. Inspections are different: Lehi asks for at least 24 hours’ notice, and inspection appointments must be scheduled by calling 385-201-1035. The city specifically says inspections are not scheduled by voicemail, email or online.
Building & Inspections office 153 N 100 E
Lehi, UT 84043
Inspection / permit phone 385-201-1035
Office hours Monday–Thursday
8:00 a.m.–5:00 p.m.
Phone hours Mon–Thu: 7:30 a.m.–5:00 p.m.
Friday: 8:00 a.m.–3:30 p.m.

What the Lehi Building Department Handles

Lehi City describes its Building and Inspection Department as the office that handles and issues building permits for the city. Its certified inspectors and plan examiners review different types of construction and inspect permitted work for compliance.

That normally makes this the starting point for projects such as new homes, residential additions, basement finishes, detached garages, larger sheds, commercial construction, commercial remodels, tenant improvements and structural sign work.

Your task Where to start Important detail
Submit a building permit Lehi Building Permit Portal Applications and plans are submitted electronically.
Schedule an inspection Call 385-201-1035 Allow at least 24 hours. Do not use voicemail, email or the online portal to schedule.
Check inspection status Official inspection-status search Search using a permit number, site address, or subdivision and lot number.
Zoning or land-use approval Lehi Planning & Zoning Setbacks, use, site plans and some sign approvals may need planning review.
Solar project Lehi Power solar page Power Department approval comes before Building Department submission.

If this is your first time dealing with permits, our general building department guide explains how permit issuance, plan review, inspections and final approval normally fit together. For Lehi-specific action, however, use the Lehi City links on this page.

How to Apply for a Lehi Building Permit

Lehi’s current process is primarily electronic. The useful approach is to gather the correct project documents first, rather than opening the portal and discovering halfway through that a plot plan, engineering packet or energy document is missing.

  1. Confirm the property is under Lehi City jurisdiction. A Lehi mailing address does not by itself answer every jurisdiction question. If there is doubt about the property boundary or zoning, confirm it with Lehi City before paying or designing around city requirements.
  2. Identify the exact project type. The city publishes different checklists for new residential construction, residential additions, basement finishes, detached garages/sheds, commercial projects, signs and solar.
  3. Open the official Building and Inspections page. Go to Lehi City Building and Inspections. This is the safest page to bookmark because the city can replace checklists and portal links without changing the overall department page.
  4. Prepare the plans and supporting files. Lehi says plans, permit applications, compliance checks, structural information and geotechnical reports are submitted electronically when applicable.
  5. Open the permit portal. Use the official Lehi Building Permit Submittal Portal.
  6. Enter the project information carefully. Use the correct job-site address, parcel information, contractor details and project scope. Commercial checklists specifically call for the correct parcel number, and some projects require a suite number.
  7. Upload the complete plan set and required documents. Make sure the information on the application agrees with the plans. Missing engineering, plot dimensions, energy documents or contractor information can create another review cycle.
  8. Respond to plan-review corrections. Lehi reviews plans digitally. If revisions are requested, make the corrections and resubmit the updated information through the city process.
  9. After approval, print the city-stamped plans. Lehi states that contractors are responsible for printing a hard copy of approved plans showing the city stamp.
  10. Keep the approved set at the job site. The approved stamped plans need to be available for inspections. Do not rely only on the version stored on your phone or computer.
Important: Submitting an application is not the same as having an issued permit. Do not treat a portal confirmation or uploaded plan set as authorization to begin regulated work.

What Documents Does Lehi Require?

The exact submittal depends on the project. The lists below summarize Lehi City’s published project checklists so you can prepare before opening the portal.

New residential construction

Lehi’s new-home checklist calls for a complete plan set that includes elevations, floor plans, cross-sections/details, footing and foundation information, electrical/plumbing/mechanical details, and the meter-base location, service amperage and breaker-panel location.

The checklist also identifies:

  • a plot plan showing dimensions from property lines to the building;
  • front and back elevations;
  • REScheck documentation;
  • a stamped engineering packet;
  • a gas piping diagram;
  • Manual J and Manual D documentation;
  • the completed building permit application with contractor license number and signature;
  • a signed Hold Harmless Agreement; and
  • applicable certificates.

Residential addition

For an addition, the city checklist calls for plans showing elevations, floor plan, cross-sections/details, footing/foundation and electrical, plumbing and mechanical information. It also calls for a plot plan showing the distance from the property line to the new addition, stamped engineering where required, a gas pipe diagram when applicable, and contractor license/signature information.

Basement finish

For a residential basement finish, prepare a floor plan with dimensions plus window locations and sizes. The city also lists electrical, plumbing and mechanical information, an engineering packet when necessary, a gas piping diagram when necessary, and the completed permit application with contractor license number and signature.

Detached garage or shed

Lehi publishes a specific checklist titled Residential Detached Garage/Shed (over 200 sq. ft.). For those projects, the checklist identifies a complete set of plans, a floor plan, electrical/plumbing/mechanical information when applicable, and a plot plan showing distances from the house and property lines to the proposed structure.

Engineering may also be required.

For a structure at or below 200 square feet: do not automatically assume that every city requirement disappears. The city’s published building checklist specifically references structures over 200 square feet, but zoning setbacks, placement rules or other approvals can still matter. Confirm the specific project with Lehi before construction.

New commercial construction

Commercial submittals require more project-specific documentation. Lehi’s checklist includes a complete digital plan set plus a code-analysis sheet showing items such as:

  • finished and unfinished square footage;
  • correct project address;
  • parcel number;
  • construction type;
  • occupancy type;
  • whether the building is sprinklered;
  • a separate structural PDF;
  • energy-envelope information;
  • signed interior/exterior lighting and mechanical compliance checks;
  • geotechnical report; and
  • contractor information and license number.

Commercial tenant finish or remodel

A tenant-finish application calls for digital plans, structural documents when necessary, signed lighting/mechanical compliance information, contractor information and the correct address, parcel number and suite number.

For a commercial remodel, Lehi also asks applicants to show demolition and new work on separate pages and to state the cost/value of the work on the permit application.

Signs

Some signs involve both Planning and Building. Lehi Planning states that sign structures such as pole signs, monument signs, directional signs and signs attached to separate structures can require a building permit, while wall signs still require planning approval even when a separate building permit is not required.

For structural sign permits, Lehi’s building checklist asks for approved elevation sheets, engineering-stamped structural sheets and a plot plan locating the sign from two fixed reference points.

Start with the official Planning Applications page if your project includes signage or other land-use approval.

Lehi Building Permit Fees in Late 2026

Lehi operates on a July 1–June 30 fiscal year. That means the city’s FY 2027 fee schedule is the relevant published city fee schedule in late 2026.

Building permit charges are not a single flat price. Lehi calculates the building permit component from project valuation using a stepped fee table. The FY 2027 schedule says valuation is based on 90% of the August 2025 ICC Building Valuation Data.

Published valuation level FY 2027 permit fee method
$1–$500 $23.50
$501–$2,000 $3.05 per additional $100; published first-$2,000 amount is $69.25
$2,001–$25,000 $14 per additional $1,000; published first-$25,000 amount is $391.75
$25,001–$50,000 $10.10 per additional $1,000; published first-$50,000 amount is $643.75
$50,001–$100,000 $7 per additional $1,000; published first-$100,000 amount is $993.75
$100,001–$500,000 $5.60 per additional $1,000; published first-$500,000 amount is $3,233.75
$500,001–$1,000,000 $4.75 per additional $1,000; published first-$1,000,000 amount is $5,608.75
Above $1,000,000 $3.65 per additional $1,000 above the published base level

Plan-review and other building fees

Fee item FY 2027 published amount
Residential plan review 40% of permit fee
Non-residential plan review 65% of permit fee
State charge 1% of permit fee
Major commercial/industrial third-party plan review Third-party charges plus 10%
Retaining wall permit $250
Retaining wall performance bond $2,000 refundable
Sidewalk bond $2,000 refundable
Reinspection fee $100
Residential temporary power setup $80

For single-family residential valuation, the FY 2027 schedule lists valuation factors of $153.72 per square foot for main and second floors, $38.43 for unfinished or semi-finished basement area, $76.86 for finished basement area, $62.67 for a wood-frame garage and $50.14 for an open carport.

Do not confuse valuation factors with the amount you pay per square foot. Those figures help establish project valuation. The permit fee is then calculated using the city’s valuation-based fee schedule. New construction can also involve utility connection and impact fees that are separate from the basic building permit charge.

To verify the newest amount, open the Lehi City Finance page and select FY 2027 Fee Schedule. Lehi also publishes a separate Connection and Impact Fee schedule updated August 26, 2026.

How to Schedule a Lehi Building Inspection

This is one place where following Lehi’s exact process matters. The permit application is online, but the inspection appointment itself is scheduled by phone.

  1. Finish the work for the inspection stage. Do not request an inspection while work is still being completed.
  2. Keep your permit information ready. Have the permit number and project address available when you call.
  3. Give at least 24 hours’ notice. Lehi City specifically asks applicants to allow 24 hours for any inspection.
  4. Call 385-201-1035. The city says inspection appointments are not scheduled by voicemail, email or online.
  5. Make sure access is available. The inspector must be able to reach and view the work being inspected.
  6. Keep the approved stamped plans on site. Contractors are responsible for printing the approved city-stamped plans for inspection use.
  7. Do not cover work that still needs inspection. Framing, piping, wiring or other concealed work may need to remain visible until the required inspection passes.
Avoid an unnecessary $100 reinspection fee. Lehi warns applicants not to schedule before the project is ready, and the current FY 2027 fee schedule lists a $100 reinspection fee.

What inspections might occur?

The exact sequence depends on the permit. Lehi’s building-inspector duties include inspections involving items such as yard/location, footing, foundation, framing, wiring, plumbing and heating. A new home will naturally have more inspection stages than a small alteration.

Your permit documents and inspector should control the sequence for your specific project. Do not use a generic construction checklist as a substitute for the inspections attached to your permit.

How to Check an Inspection Status

You do not need to call just to see whether an inspection has been recorded. Lehi provides an online inspection-status tool for developers and contractors.

  1. Open the Lehi inspection-status portal.
  2. Search using the building permit number, site address, or subdivision and lot number.
  3. Open the matching permit or project record.
  4. Review the available inspection status or result.
  5. If the result requires corrections and the next action is unclear, call Building and Inspections at 385-201-1035.

Remember the distinction: the online system can be used to check status, but the city says to call the office to schedule the inspection itself.

Building Codes, Design Criteria and Zoning

Be careful with third-party websites that publish a specific Lehi code edition without showing when it was verified. Lehi’s own Building and Inspections page currently states that its current codes and design criteria have changed and will be posted soon.

For a project where the exact code edition, snow load, structural design criteria or another technical standard affects engineering or permit acceptance, confirm the current requirement directly with the department at 385-201-1035.

Lehi’s official municipal and development-code links are available on the Codes & Ordinances page.

Building approval is not always the same as zoning approval

A structurally compliant project can still have a zoning problem. Additions, detached structures, signs, accessory dwelling units and commercial projects may involve setbacks, use restrictions, site-plan requirements or other land-use rules.

When location or use is part of the project, check the Lehi Planning & Zoning Division before finalizing plans.

Practical order: confirm zoning/site feasibility first when the project changes the building footprint or property use → prepare plans → submit the building permit → complete plan-review corrections → obtain the issued permit → build → schedule required inspections → complete final approval.

Solar Permits Have an Extra Step in Lehi

A solar project should not go directly to the Building Department first. Lehi’s solar checklist says solar applications must be submitted to the Lehi City Power Department for approval before being submitted to Building and Inspections.

The published solar checklist includes:

  • a complete plan set with Lehi Power approval stamp;
  • a one-line electrical diagram;
  • a roof layout showing Fire Department access;
  • warning-label information and placement;
  • an engineer letter addressing the roof structure;
  • specification sheets for equipment;
  • the building permit application with contractor license number and signature;
  • the Net Metering License Agreement; and
  • the Net Metering Standards Application.

Solar micro-steps

  1. Open the official Lehi Solar Power page.
  2. Download the current net-metering documents listed by Lehi Power.
  3. Prepare the plan set, one-line diagram, roof layout and equipment documents.
  4. Submit the solar application through the Lehi Solar Portal.
  5. Obtain Lehi Power approval.
  6. Use the approved/stamped package for the Building Department permit submission.

The city’s August 26, 2026 connection-fee sheet lists a standard residential solar connection fee of $394.81. Because utility charges and policies can change separately from building permit fees, confirm the current amount during submission.

How to Find an Older Permit or Building Record

If you are researching an existing property, first try the permit/inspection system using the address or permit information you already have.

If the record you need is not available through the public online tools, Lehi City provides a formal public-record request process through the City Recorder.

  1. Collect the exact property address, owner name, parcel number and approximate permit year if known.
  2. Check the available building/inspection portal first.
  3. If the document is not online, open Lehi City’s Records Requests page.
  4. Use the Open Records Portal linked by the city to submit the GRAMA records request.
  5. Describe the record specifically—for example, building permit, approved plans, inspection history or another identifiable city record.

Lehi City lists the City Recorder’s Office number as 385-201-1000, extension 2524, for questions about public-record requests.

Common Lehi Permit Mistakes That Are Easy to Avoid

Problem Better approach
Uploading plans without the project-specific checklist items Read Lehi’s checklist for your exact project before starting the portal submission.
Missing plot-plan dimensions Show the required distances to property lines, house or proposed addition/structure.
Commercial address or suite information does not match Verify the address, parcel number and suite number before uploading.
Scheduling an inspection too early Call only when the inspection stage is complete and accessible.
No stamped approved plans at the site Print the approved city-stamped set and keep it available for the inspector.
Assuming a building permit settles zoning Confirm Planning & Zoning requirements for setbacks, signs, use and site changes.
Sending solar directly to Building Complete Lehi Power approval first.
Using an old fee table In late 2026, check Lehi’s FY 2027 schedule and the current connection/impact fee sheet.

Official Lehi Links You May Actually Need

Official resource Use it for
Building and Inspections Current department notices, checklists, permit portal, inspection information and contact details.
Building Permit Submittal Portal Submitting a building permit application.
Inspection Status Search Checking an inspection using permit, address, subdivision or lot information.
Planning & Zoning Zoning, land-use, site-plan and development questions.
Finance Current city fee schedules.
Codes & Ordinances Lehi municipal and development codes.
Lehi Solar Power Solar approval and net-metering documents.
Records Requests Requesting city records that are not available online.

Frequently Asked Questions

1. Where is the Lehi Building Department?

Lehi City Building and Inspections is at 153 N 100 E, Lehi, UT 84043. The building office phone number is 385-201-1035.

2. How do I apply for a building permit in Lehi?

Lehi requires building permit applications to be submitted through its online Building Permit Submittal Portal. Prepare the project-specific plans and documents first, then upload the application and supporting files electronically.

3. Can I schedule a Lehi building inspection online?

No. Lehi’s current Building and Inspections instructions say inspections are not scheduled online, by voicemail or by email. Call 385-201-1035 to schedule.

4. How much notice does Lehi require for an inspection?

Lehi asks applicants to allow at least 24 hours’ notice for an inspection. Schedule only after the work is ready for the requested inspection stage.

5. How do I check a Lehi inspection status?

Use Lehi’s online inspection-status portal. You can search using the building permit number, site address, or subdivision and lot number.

6. What does Lehi require for a basement-finish permit?

The city’s basement checklist calls for a complete plan set, a dimensioned floor plan showing window locations and sizes, electrical/plumbing/mechanical information, engineering when necessary, a gas piping diagram when applicable, and permit/contractor information.

7. Do I need a Lehi permit for a shed?

Lehi publishes a building-permit checklist specifically for detached garages or sheds over 200 square feet. Smaller structures can still be affected by zoning, setbacks or other requirements, so confirm your specific structure with the city before building.

8. How much is a Lehi building permit?

There is no single flat building-permit price. Lehi’s FY 2027 schedule uses project valuation and a stepped fee table, with separate plan-review and other charges where applicable. The smallest published valuation bracket starts at $23.50, but the total project cost can be considerably higher.

9. What is the process for a solar permit in Lehi?

Submit the solar project to Lehi City Power first. After Power Department approval, submit the approved plan package to Building and Inspections. Lehi’s solar checklist also requires items such as a one-line diagram, roof layout, warning-label information, engineering and equipment specifications.

10. What building code does Lehi use in 2026?

Lehi’s official Building and Inspections page currently says its codes and design criteria have changed and updated information will be posted. For a project where the exact code edition or design criterion affects the plans, call Building and Inspections at 385-201-1035 rather than relying on an older third-party code list.

Before You Submit

The easiest Lehi permit process is usually the one where the application is complete the first time. Identify whether Planning, Power or another city review comes first, use Lehi’s checklist for your exact project, upload a complete plan package, and keep the approved city-stamped plans available once construction begins.

For inspections, remember the most important local detail: call 385-201-1035 and give at least 24 hours’ notice. The online system is useful for checking inspection status, but Lehi does not use it to schedule the appointment.

Permit requirements, fees, city forms and technical standards can change. This guide summarizes Lehi City information available in November 2026. Use the linked official city resources for the final application, payment, inspection request or project-specific determination.

Leave a Comment