Lighthouse Point Building Department 2026: Permits, Fees & Inspections

Lighthouse Point Building Permits & Inspections: What to Do First in 2026

Quick answer: The City of Lighthouse Point Building & Zoning Department handles building permits, plan review, zoning review and construction inspections for projects within Lighthouse Point, Florida. The Building Department is at 3701 NE 22 Avenue, Lighthouse Point, FL 33064. The main number is 954-943-6509, and the dedicated inspection line is 954-784-3449. Office hours are Monday through Friday, 8:00 a.m. to 4:00 p.m.

If you are replacing windows, reroofing a home, remodeling a bathroom, installing an air conditioner, changing a driveway, building a pool, replacing a fence, repairing a seawall or doing another construction project in Lighthouse Point, the important question is not simply “Where is the building department?” You need to know whether a permit is required, which forms belong with the application, whether Broward County approval is also involved, how to check the permit after filing, and when an inspection has to be requested.

Lighthouse Point Building Department Contact Information

Detail Current information
Department City of Lighthouse Point Building & Zoning
Building office 3701 NE 22 Avenue, Lighthouse Point, FL 33064
Building phone 954-943-6509
Inspection line 954-784-3449
Fax 954-784-3447
Building email LHPBuilding@lighthousepoint.com
Zoning email LHPPlanning@lighthousepoint.com
Office hours Monday-Friday, 8:00 a.m.-4:00 p.m.
Online system SmartGov City of Lighthouse Point Public Portal
Local detail that can save a wasted trip: the Building & Zoning office is at 3701 NE 22 Avenue. That is different from the City’s general municipal address shown elsewhere on the municipal website, so use the Building Department address when you are taking permit documents to the office.

Do You Need a Building Permit in Lighthouse Point?

Most construction that adds, replaces, relocates or materially changes a structure or building system requires a permit. Lighthouse Point publishes a detailed list rather than relying on a vague “major work only” rule.

Project Permit situation
Roof or reroof Permit required for new roofing, reroofing and qualifying repairs.
Windows and exterior doors Replacement, repair, new openings and closing existing openings can require permits.
Fence A permit is required even when replacing an existing fence in the same location.
Driveway New, replacement or expanded driveways require permitting; the City FAQ also says replacement on the same footprint requires a permit.
Pool or spa Pools, spas, pool decks and enclosures generally require permits and may involve several trades.
A/C or HVAC Replacement of condensers, air handlers, heating elements and many duct alterations requires permitting.
Water heater Replacement or new installation requires a permit.
Bathroom or kitchen remodel Permits may be needed for plumbing, electrical, walls and other regulated work.
Shed The City states that sheds require permitting.
Generator Generator projects can require structural, electrical and plumbing/gas applications.
Dock, boat lift or seawall City permits plus outside environmental approvals may be required.

The City’s FAQ identifies painting, carpet installation and tile installation as examples of minor work that may be performed without a building permit. Do not assume every inexpensive project is exempt, however. Zoning approval or the newer Florida small-project exemption rules may still need to be considered.

Important 2026 Rule: Some Work Under $7,500 May Be Permit-Exempt

Florida law changed on July 1, 2026. Under section 553.79 of the 2026 Florida Statutes, a local government must provide a building-permit exemption for qualifying work valued at less than $7,500 on a single-family dwelling.

This is not a blanket “anything under $7,500 needs no permit” rule. The exemption does not apply when:

  • the property is partially or entirely in a flood hazard area;
  • the work is electrical;
  • the work is plumbing;
  • the work is structural;
  • the work is mechanical/HVAC; or
  • the work involves gas.

The project cannot be divided into several smaller jobs merely to stay below the threshold. The statute also requires a written exemption request with documentation showing the nature and value of qualifying work.

Especially important in Lighthouse Point: because this is a coastal and waterfront community, do not assume your property qualifies for the under-$7,500 exemption before checking whether it lies in a flood hazard area. If there is any doubt, call the Building Department at 954-943-6509 before starting work.

Read Florida Statute 553.79.

How to Apply for a Lighthouse Point Building Permit

The City’s current Building & Zoning page states that new permit applications can be accepted online and in person. The exact documents vary greatly by project, so start with the City’s project-specific forms rather than filling out a generic application and hoping it is enough.

Step 1: Identify every permit discipline involved

A single construction project may require more than one permit. A pool project, for example, can involve building, electrical, plumbing, mechanical and fence or gate permits. A generator can involve structural, electrical and gas/plumbing documents.

Step 2: Open the official Forms page

  1. Go to the City of Lighthouse Point Building Forms page.
  2. Find the checklist or application for your actual project.
  3. Download the Building Permit Application plus any electrical, mechanical, plumbing or project-specific addendum required.

Step 3: Prepare the property and job information

City checklists commonly ask for the property address, lot, block, subdivision, clear description of work and job value. Depending on the project, you may also need a survey, plans, engineering, product approvals, elevation information or a zoning affidavit.

A useful Lighthouse Point detail: several City checklists state that when a survey is more than 12 months old, the owner may need to complete a zoning affidavit confirming that nothing shown on the survey has changed. If site improvements have changed the property, a new survey may be required instead.

Step 4: Check contractor registration

Contractors must be registered with the City before applying. The City’s FAQ says registration includes applicable occupational/business licensing, state license or certificate of competency, workers’ compensation coverage or exemption, and general-liability insurance documentation.

Step 5: Submit the complete package

Use the Lighthouse Point Public Portal where the appropriate online filing function is available, or submit through the Building Department using its current in-person procedure.

Portal documentation conflict: the City’s current Building & Zoning page says applications may be submitted online, while an older portal-instructions PDF still describes the portal as view-only. If your account only shows search/status functions and no application option, call 954-943-6509 before sending documents another way. Follow the current department instructions rather than an older PDF screenshot.

Step 6: Watch for review comments

Do not assume silence means approval. Search the permit record and check whether structural, zoning or trade reviewers have approved the application or left correction comments.

Step 7: Do not begin regulated work before issuance

The City’s FAQ states that work started without the required permit can trigger a Stop Work Order, code-enforcement action, additional fees and, in some cases, the need to uncover completed work for inspection.

How to Search a Lighthouse Point Permit or Check Status

The SmartGov public portal is useful even if you are not the contractor. The City’s portal instructions show searches by permit number, property address or contractor/company name.

  1. Open the Lighthouse Point Public Portal.
  2. Select the permit/view option shown on the public home page.
  3. Search using the permit number when you have it; that is usually the cleanest search.
  4. If you do not know the permit number, try the property address.
  5. Open the matching permit.
  6. Review the permit status and important dates.
  7. Scroll through plan-review information for approvals or denial comments.
  8. Review inspection history before assuming the project is complete.
Status What it generally means in the City’s portal instructions
Sent To The permit is being reviewed by the listed department or discipline.
Denied The application or review was not approved; review the posted comments.
Pricing Department approvals are complete and permit charges are being calculated.
Ready for Pick Up The City’s instructions indicate the permit is ready for the next issuance/payment step.
Issued The permit has been approved and issued; verify all conditions before work begins.
Closed The permitted work has been completed and the record has been closed.

If you are buying or selling a house, do not stop after finding the permit number. Look at the final inspection history and confirm the permit was actually closed. An old application and a completed permit are not the same thing.

Lighthouse Point Building Permit Fees

The fee PDF currently linked from the City’s Building & Zoning page bases permit fees on construction value by trade. Because fee schedules can be amended and the linked PDF itself carries an older revision date, use these published figures as a planning reference and confirm the assessed amount before payment.

Published fee item Amount shown in City’s linked schedule
Minimum permit fee / construction cost up to $5,000 per trade $125
Construction value above $5,000 per trade 1.35% of value above $5,000
Residential water-heater or A/C replacement $75
Application fee: new commercial or residential construction $1,000, credited toward final permit cost
Application fee: remodel or addition $200, credited toward final permit cost
Application fee: permit requiring drainage $300, credited toward final permit cost
Application fee: other permits $100, credited toward final permit cost
Reinspection $95 in the currently linked fee PDF
Change of contractor $100
Certificate of Occupancy / Completion $125
Work without required permit 200% of standard permit fee in the published schedule

Open the fee schedule currently linked by the City.

Payment detail: the City’s FAQ lists cash, check, cashier’s check and credit card among accepted payment methods, while the current Building & Zoning page specifically says a check payable to the City of Lighthouse Point is required for permit submittals. If you are going to the office, confirm the payment method for your particular filing before making the trip.

How Lighthouse Point Building Inspections Work

After a permit is issued, the work is inspected at the stages required by the approved plans and permit card. Depending on the project, inspections may include structural, electrical, mechanical, plumbing and zoning.

Schedule an inspection

  1. Make sure the permit is issued and the work for that inspection is ready.
  2. Have the permit number and correct inspection type available.
  3. Call 954-784-3449 before 3:00 p.m..
  4. The City states that requests made by the cutoff are scheduled for the next day or earliest available inspection.
  5. The City’s current inspector-contact sheet also references portal scheduling where available.

If you are an owner-builder, requesting the required inspection is your responsibility. If a licensed contractor is handling the project, the contractor normally coordinates inspections as construction progresses.

Do you need to be home?

The City’s FAQ says someone should be present for most inspections. It identifies the following as exceptions where a person generally does not need to be home:

  • boat lifts;
  • decks;
  • docks;
  • driveways;
  • fences;
  • roofs; and
  • shutters.

Current City-linked inspector contacts

Discipline Contact shown on current City PDF Phone
Building Official / structural / roofing K-Maron Perdue 954-599-7765
Plumbing Michael Siravo 754-215-0909
Electrical Don Correa 305-962-5834
Mechanical Joseph Switalski 954-909-7400
Zoning Darryl 954-943-6509 ext. 5

The inspector-contact sheet instructs customers looking for an inspection time window to contact the appropriate inspector directly, preferably by text, between approximately 7:00 and 7:45 a.m. It also states that the Building Department office does not have inspector arrival timeframes.

Check the City’s current inspector contact list before calling, because staffing can change.

If an inspection fails

A failed inspection can result in a red tag identifying the correction required. Fix the cited work, make sure revised plans are submitted when a change affects the approved design, and request the correct reinspection. Do not cover work that still needs to be inspected.

Before paying a contractor the final balance, verify that all required final inspections have passed and the permit has been closed. That small check can prevent a frustrating open-permit problem later.

Local Lighthouse Point Issue: Docks, Seawalls and Boat Lifts

Waterfront construction is one area where a generic Florida permit guide is not enough. Lighthouse Point’s dock and seawall checklist identifies possible outside approvals from Broward County, the Florida Department of Environmental Protection and the U.S. Army Corps of Engineers, depending on the work.

The City’s checklist also calls for items that may include:

  • Building Permit Application and City addendum;
  • electrical or plumbing applications when applicable;
  • signed and sealed construction plans;
  • zoning affidavit when an older survey is being relied upon;
  • Notice of Commencement when applicable;
  • updated contractor registration;
  • special insurance requirements for qualifying work over navigable waters; and
  • an updated dock/seawall survey before the final building inspection.

Broward County’s Environmental Permitting Division regulates many construction activities in, over or adjacent to surface waters, including docks, seawalls, bulkheads, boat lifts, piers and pilings. Some qualifying minor work can use a streamlined environmental resource process.

If your project requires county-level building or approval information, our Broward County Building Department guide explains the county system separately from Lighthouse Point’s municipal process.

Can You Pull a Lighthouse Point Permit as an Owner-Builder?

The City’s FAQ says an owner who resides at an owner-occupied single-family residence can pull many permit types as an owner-builder. This does not mean every trade can be performed by the homeowner.

Lighthouse Point specifically states that electrical, roofing and piling work must be performed by licensed contractors. An owner-builder also accepts responsibility for understanding the applicable Florida Building Code, Lighthouse Point zoning rules, required inspections and job-site responsibilities.

If you intend to use the owner-builder route:

  1. confirm that the property and type of work qualify;
  2. download the City’s Owner-Builder Affidavit;
  3. complete the required notarization;
  4. prepare the same plans, surveys, product approvals and supporting documents required for the project; and
  5. personally track and request the required inspections.

How Long Is a Lighthouse Point Building Permit Valid in 2026?

The City’s current FAQ contains important 2026-specific timing rules:

  • Single-family dwelling permits: the City states permits issued after July 1, 2026 are valid for one year from issuance.
  • Commercial, townhome and multifamily permits: the City lists a 180-day period.
  • Demolition permits: 60 days, with the City’s FAQ stating they cannot be renewed.
  • Temporary fences: 30 days, with up to two renewals listed by the City.

Florida’s 2026 permit legislation also established a one-year expiration framework for single-family dwelling building permits. Because permit activity and extensions can affect expiration, use the expiration date shown on your actual permit record rather than relying only on a general rule.

Fee discrepancy worth knowing: the older fee PDF still linked by the City and the City’s current FAQ do not describe the second expired-permit renewal fee in exactly the same way. If your permit has already expired, ask the Building Department for the current assessed renewal amount before paying.

Which Florida Building Code Applies in November 2026?

As of November 2026, the Florida Building Code, 8th Edition (2023) remains the operative statewide edition. Lighthouse Point’s current roof documents also reference the 8th Edition.

The Florida Building Commission identifies December 31, 2026 as the effective date for the 9th Edition (2026). If your application will be filed close to that transition, confirm with the Building Department which code edition and product approvals must be used for your project.

Florida Building Code Online

Broward County Building Safety Inspection Requirement

Lighthouse Point’s Building & Zoning page states that Broward County’s Building Safety Inspection requirement applies to buildings that are more than 25 years old and larger than 3,500 square feet.

The City specifically says that the following are exempt from this requirement:

  • single-family homes;
  • duplexes; and
  • buildings under 3,500 square feet.

This matters because property owners may receive marketing letters from engineering or architectural firms suggesting an inspection is due. The City warns that receiving such a letter does not automatically mean your property is subject to the program.

How Busy Is the Lighthouse Point Building Department?

The City’s FY 2023/2024 Building Permit and Inspection Utilization Report provides useful context. It reported 3,082 building permit applications, 3,089 permits issued or approved, and 7,986 inspections and reinspections conducted during that reporting period.

For applicants, the practical lesson is simple: submit a complete package and read review comments carefully. Missing surveys, signatures, product approvals or trade applications can send a project into another review cycle unnecessarily.

Common Lighthouse Point Permit Delays to Avoid

Problem Practical fix
Wrong or incomplete application Use the City’s project-specific checklist, not only the general building application.
Missing trade permit Identify electrical, plumbing, mechanical and structural work before filing.
Old survey Check whether a zoning affidavit is accepted or whether property changes require a new survey.
Missing product approvals Provide required approvals for windows, doors, roofing, shutters, fences and other regulated products.
Waterfront project submitted only to City Check Broward, DEP and Army Corps requirements before assuming City approval is the only one needed.
Contractor not registered Complete Lighthouse Point contractor registration before attempting to pull the permit.
Inspection requested before work is ready Verify the approved plans, permit card and inspection sequence before calling.
Final payment made too early Confirm final inspections passed and the permit is closed before releasing the final contractor payment.

Building authority changes from one municipality to another. For county-level services and approvals, see our Broward County Building Department guide. If you are researching property farther north in Palm Beach County, the permit systems are different; see our Boca Raton Building Department guide and Delray Beach Building Department guide.

Frequently Asked Questions

1. Where is the Lighthouse Point Building Department?

The Building & Zoning office is at 3701 NE 22 Avenue, Lighthouse Point, FL 33064. The main Building Department number is 954-943-6509.

2. Can I apply for a Lighthouse Point building permit online?

The City’s current Building & Zoning page states that new permit applications may be accepted online and in person. Use the Lighthouse Point SmartGov Public Portal and the City’s Forms page. Because an older City portal guide still describes a view-only system, call 954-943-6509 if your account does not show an application function.

3. Do I need a permit to replace a fence, windows or driveway?

Yes in the situations described by the City’s current permit guidance. Lighthouse Point specifically states that replacing an existing fence requires a permit, window and door replacement requires permitting, and driveway replacement requires a permit even when using the previous footprint.

4. Is work under $7,500 permit-exempt in Lighthouse Point in 2026?

Some qualifying work on a single-family dwelling valued below $7,500 can be exempt under Florida law, but not if the property is in a flood hazard area or the project involves electrical, plumbing, structural, mechanical or gas work. A written exemption request and supporting documentation are required by the statute.

5. How do I check a Lighthouse Point permit status?

Open the City’s SmartGov Public Portal and search by permit number, property address or contractor information. Open the record to review permit status, review comments and inspection history.

6. How do I schedule a building inspection?

Call the Lighthouse Point inspection line at 954-784-3449 before 3:00 p.m. for a next-day or earliest-available inspection. The City’s current inspector sheet also references portal scheduling where available.

7. How much does a Lighthouse Point building permit cost?

The fee schedule currently linked by the City lists a $125 minimum permit fee per trade for construction value up to $5,000, plus 1.35% of construction value above $5,000. Other application, review, county and state charges may apply, and current fees should be confirmed before payment.

8. Can a homeowner pull an owner-builder permit?

Yes for many qualifying projects at an owner-occupied single-family residence. However, Lighthouse Point states that electrical, roofing and piling work must be performed by licensed contractors.

9. How long is a Lighthouse Point permit valid?

The City’s 2026 FAQ states that single-family dwelling permits issued after July 1, 2026 are valid for one year. Commercial, townhome and multifamily permits are listed as valid for 180 days, while demolition permits have a separate 60-day rule.

10. Does every older Lighthouse Point building need a Broward safety inspection?

No. The City states that the Broward Building Safety Inspection requirement applies to buildings more than 25 years old and larger than 3,500 square feet. Single-family homes, duplexes and buildings under 3,500 square feet are exempt from that requirement.

Official Resources

Before you start: identify the exact work, check whether a permit or 2026 exemption applies, collect every trade application and project-specific document, submit through the current City procedure, follow review comments, and do not consider the job complete until required final inspections have passed.

Information reviewed for November 2026. USBuilding.org is an independent informational resource and is not operated by or affiliated with the City of Lighthouse Point or Broward County. Government forms, personnel, fees, portal functions and permit procedures can change; the issuing agency’s current requirements control for an individual project.

Leave a Comment