Lincoln Park Building Permits and Inspections: What to Do in 2026
If you are repairing a house, replacing a roof, installing electrical or plumbing work, building a fence, opening a business, selling a home, or trying to close an old permit in Lincoln Park, Michigan, the City Building Department is usually the office you need.
Independent guide: USBuilding.org is not the City of Lincoln Park. Information below was checked against City of Lincoln Park and State of Michigan resources available in November 2026. Permit requirements and fees can change, so use the official portal for the final submission or payment.
Lincoln Park Building Department Contact Information
| Department | City of Lincoln Park Building Department |
|---|---|
| Address | 1355 Southfield Road, Lincoln Park, MI 48146 |
| General Building Department | 313-386-1800 ext. 1299 |
| Inspection voicemail | 313-386-1800 ext. 1284 |
| Building Official | Charles Earl — 313-386-1800 ext. 1224 |
| Fax | 313-386-0490 |
| Office hours | Monday-Friday, 8:00 a.m.-4:00 p.m. |
| Online system | BS&A Online for permit applications, records, fees and inspection requests |
The department administers building, electrical, mechanical and plumbing requirements along with planning and zoning, signs, rental properties, resale inspections and related local ordinances.
What Work Requires a Lincoln Park Permit?
Lincoln Park’s building permit application lists work such as new buildings, additions, alterations, demolition, foundations, relocation, window replacement, roof replacement, siding, signs and fences. Electrical, mechanical and plumbing work use separate trade permit applications.
The City’s zoning code also requires permits for certain new uses of land, changes in building use and regulated accessory improvements. Lincoln Park’s current residential zoning permit form specifically provides sections for concrete work, fences and accessory structures.
For example, the zoning form asks applicants proposing a shed to provide its size and location. It states that a secondary accessory structure may be up to 150 square feet, single story, and must comply with required setbacks.
If you are unsure whether a seemingly small project needs approval, call the department before buying materials. A ten-minute permit check is usually easier than trying to legalize completed work later.
How to Apply for a Lincoln Park Building Permit
The City provides online permit services through BS&A. The City’s permit portal warns applicants that submitted permits undergo plan review and that work must not begin until the permit has been approved and issued.
- Open the Lincoln Park BS&A page. Go to the City’s municipal portal and choose Apply for a Permit.
- Sign in or create an account. An account allows you to manage permit applications and inspections.
- Identify the property. Search for the Lincoln Park job address and confirm you are applying against the correct parcel.
- Select the correct permit category. Building, electrical, mechanical and plumbing work may require separate applications.
- Enter the project information. Describe the work accurately and upload requested plans, drawings or supporting documents.
- Submit for review. Do not treat an application confirmation as permission to start construction. Wait until the permit is actually approved and issued.
- Pay required fees and keep the permit information. You will need the permit number later when scheduling inspections.
Open the official Lincoln Park BS&A portal →
Prefer a paper application?
You can also download the City’s official building permit application. The City says residents can call or visit the Building Department to discuss what they are planning and determine the applicable requirements.
What to Prepare Before You Apply
The building permit form asks for more than a project address. Preparing the information first can prevent a simple application from bouncing back for missing details.
- Project address and project name, if applicable
- Owner or lessee contact information
- Applicant contact information and email
- Contractor information and builder license number when applicable
- Architect or engineer information when required
- A clear description of the work
- Building size and affected square footage
- Construction valuation, including materials and labor
- Plans, sketches or construction documents required for review
- Any related zoning, fire, sewer, water or other approvals that apply to the project
Plan-review requirements
The City’s current building permit PDF states that three sets of construction documents are required with a permit application unless the Building Official waives them because compliance can be determined from the application description.
For buildings regulated by the Michigan Building Code, the City’s form says the construction documents must be submitted and approved before the building permit is issued. The form also notes professional sealing requirements and exemptions, including certain one- and two-family dwellings under 3,500 square feet of calculated floor area.
Separate trade applications matter
A building permit does not automatically replace the City’s electrical, plumbing or mechanical permit applications. Lincoln Park publishes separate forms for each trade on its official forms page.
Lincoln Park Building Permit Fees
Structural building permit fees are based on the project’s construction value. The City’s published building and zoning fee schedule starts at $115 for construction valued from $0 through $1,000 and then increases by $10 for each additional $1,000, or fraction of $1,000.
| Construction value | Published building permit fee |
|---|---|
| $0-$1,000 | $115 |
| $1,001-$2,000 | $125 |
| $5,001-$6,000 | $165 |
| $9,001-$10,000 | $205 |
| $10,001-$11,000 | $215 |
| $14,001-$15,000 | $255 |
| $19,001-$20,000 | $305 |
| Above the listed ranges | Continue adding $10 per $1,000 or fraction, subject to the City’s current calculation |
Important: the City’s fee sheet states that plan-review fees are not included in the basic permit amount. Your final total can therefore be higher than the number in the construction-value table.
View the official Building Department fee schedule →
Electrical, mechanical and plumbing fee basics
The City’s current trade applications contain their own fee schedules. Common published charges on those forms include:
| Fee item | Published amount | Applies to |
|---|---|---|
| Administrative fee | $35, non-refundable | Electrical, mechanical and plumbing forms |
| Contractor registration | $15 | Trade contractor registration shown on forms |
| General inspection | $50 | Trade permits |
| Rough inspection | $20 | Trade permits when applicable |
| Reinspection | $50 | Failed or additional trade inspection |
| Underground inspection | $50 | When underground work requires inspection |
The total trade permit is not just the base fee. Individual equipment, fixtures, circuits, services, piping, HVAC units and other work can add unit charges.
For example, the electrical schedule lists an EV charging station at $50 and roof solar panels with related service/meter/disconnect at $90. The mechanical schedule uses different charges based on equipment and capacity, while plumbing fees vary by fixture, service or piping work.
How to Schedule a Lincoln Park Building Inspection
Lincoln Park gives residents two practical options: use BS&A’s inspection service or call the Building Department inspection line.
Scheduling by phone
- Call 313-386-1800 ext. 1284.
- Leave your permit number.
- Give the project address.
- State the inspection type, such as rough, underground, forms or final.
- Give the requested inspection date.
The City states that calls received after 3:00 p.m. will be scheduled for the following business day. It also warns that you should not expect a return phone call or confirmation when scheduling an inspection for a current permit.
| Inspection type | Published inspection window |
|---|---|
| Electrical, mechanical and plumbing | Monday and Wednesday, 8:00 a.m.-1:00 p.m. |
| Building, fence and land-use inspections | Monday-Friday, 8:00 a.m.-4:00 p.m. |
Before the inspector arrives
- Make sure the work being inspected is complete enough for that inspection stage.
- Do not cover wiring, piping, structural work or other concealed components before required inspection.
- Keep approved plans and the permit available at the site if required.
- Make the work area safely accessible.
- Correct previously noted violations before requesting a reinspection.
Do not let the permit quietly expire
The City’s building and trade applications state that a permit becomes invalid if authorized work does not begin within 180 days after issuance, or if work is suspended or abandoned for 180 days after it begins.
The Building Official may grant written extensions for periods of up to 180 days when an extension is requested in writing and justified.
How to Search Lincoln Park Permits, Inspections and Property Records
You do not always need to call City Hall to find out whether a property has an old permit or inspection record. Lincoln Park directs residents to BS&A for online municipal records.
- Open the official Lincoln Park BS&A Property Search instructions.
- Enter the property address, owner name or parcel number.
- Choose the Building Department record category.
- Review available permits, certificates, inspections and enforcement records tied to the property.
- If something appears incomplete or inaccurate, contact the City rather than assuming an online record is the final legal determination.
This is particularly useful before buying a property or starting a renovation. Discovering an open permit before work begins is much easier than discovering it during a sale, refinance or final inspection.
Contractor Registration in Lincoln Park
Lincoln Park publishes a separate contractor registration form. The City’s current form asks for the contractor’s business and license information and lists several items that should accompany the registration.
- Copy of the contractor/licensee’s driver’s license
- Current contractor license
- Applicable master or specialist licenses for electrical, plumbing or sign work
- $15 registration fee
- Contractor signature
- Notarization when the form is not submitted in person
- Liability-insurance documentation showing the City of Lincoln Park as certificate holder
The form also notes that only licensed electrical/plumbing contractors and authorized masters may obtain electrical or plumbing permits under applicable Michigan licensing requirements.
Property Sale, Rental, Vacant Building and Business Requirements
Selling a residential property
Lincoln Park has a local resale inspection requirement that can surprise sellers who wait until the closing date to investigate it.
The City states that residential dwellings must have an exterior inspection before sale. The published process includes:
- Submit the resale application with the $150 inspection fee.
- The City schedules the next available inspection after receiving the application.
- The inspection report is generally mailed to the applicant within five working days after the inspection.
- Violations are normally required to be corrected within six months of the inspection.
- If the property sells before corrections are completed, the purchaser may assume the violations through the City’s as-is affidavit process.
- The $150 fee includes the initial and follow-up inspection.
- A third inspection may result in a $50 reinspection fee.
- An approved Certificate of Approval is valid for one year from the original inspection date and applies to the applicable sale or transfer.
Open the official Lincoln Park resale inspection process →
What the exterior resale inspection looks at
The City’s checklist includes items such as chimneys, roofing, gutters, porches, peeling paint, debris, rodent evidence, stairs, handrails, windows, exterior walls, foundations, fences, service equipment and deteriorated concrete.
Rental properties
The Building Department’s forms collection includes rental registration, a rental certificate, inspection checklist, non-rental affidavit and the City’s rental ordinance. Owners should use the current forms rather than relying on an old landlord checklist saved from a previous year.
Vacant homes and businesses
The Building Department states that vacant businesses and homes must be registered. The City’s vacant-building registration form says registration is due every 180 days. Where a responsible party differs from the owner, the form requires that person to be a Michigan resident living within 100 miles of Lincoln Park and requests the management agreement between the owner and responsible party.
Opening or taking over a business
Lincoln Park says new business owners must register through the City Clerk and obtain a new Certificate of Occupancy from the Building Department.
The City’s commercial Certificate of Occupancy application covers new businesses, relocations and changes of ownership. It asks for property and tenant information, proposed use and occupancy details. The form also requests two plot plans and floor plans showing proposed changes where applicable, plus a lease agreement or proof of ownership and business-owner photo identification.
New signage may require a separate sign permit.
Lincoln Park Fence and Swimming Pool Rules
Fence and pool projects have local details that are easy to miss if you rely only on a general Michigan permit guide.
Fence requirements highlighted by the City
- A mortgage survey or complete plot plan must be submitted with the application.
- The published maximum fence height is 6 feet.
- A six-foot fence may extend no closer than five feet to the front building setback.
- Post holes must be inspected before posts are set in concrete and must provide the required 42-inch depth.
- Fences along property lines must remain 12 inches off the City sidewalk.
- A final inspection is required.
The City’s rules contain additional requirements when existing chain-link fencing is being removed or when shared/adjoining fence conditions are involved, including situations where notarized neighbor permission is required.
Pool inspections
The City requires placement and electrical/building inspections for regulated pools. Lincoln Park’s guidance says swimming pools, spas, hot tubs and similar installations containing 24 inches or more of water must meet applicable security requirements.
Above-ground pools normally involve an electrical inspection visit, while an in-ground pool requires at least rough and final electrical inspections and may require another rough inspection depending on construction.
Read the official Lincoln Park fence and pool requirements →
Which Building Codes Apply in Lincoln Park in 2026?
Lincoln Park administers Michigan construction codes locally. The Michigan Department of Licensing and Regulatory Affairs (LARA) publishes the current statewide code editions.
| Code area | Current Michigan code listed by LARA in November 2026 |
|---|---|
| Building | 2021 Michigan Building Code — effective April 9, 2025 |
| Residential | 2015 Michigan Residential Code — currently remaining in effect |
| Mechanical | 2021 Michigan Mechanical Code — effective March 12, 2024 |
| Plumbing | 2021 Michigan Plumbing Code — effective March 12, 2024 |
| Electrical | 2023 National Electrical Code with Michigan rules — effective March 12, 2024 |
| Commercial energy | 2021 Michigan Commercial Energy Code — effective April 22, 2025 |
Michigan was working on later code updates during 2026, but proposed or pending rules should not be confused with an effective code. Check LARA’s current code-books page if your project starts later or your plan review spans a code change.
Local zoning, signs, rental, resale and other Lincoln Park ordinances can apply in addition to the statewide construction codes.
Practical Ways to Avoid Permit Delays
- Confirm the permit type before submitting. A structural permit does not automatically cover electrical, plumbing or HVAC work.
- Use total construction value. The City’s building application says valuation includes materials and labor, including the project’s trades.
- Do not start after merely submitting online. Wait for actual permit issuance.
- Upload readable plans. Missing dimensions, property lines or project descriptions create avoidable review questions.
- Check zoning early. This matters especially for fences, concrete, accessory structures, new businesses and changes of use.
- Keep inspections in sequence. Do not conceal work that still requires a rough or underground inspection.
- Watch the 180-day clock. Long construction pauses can affect permit validity.
- For property sales, start early. Lincoln Park’s resale process includes mailing and correction time that can interfere with a rushed closing.
Nearby Michigan Building Department Guides
If the property is not actually inside Lincoln Park city limits, use the permitting authority for the property’s jurisdiction. These existing guides may help with nearby Wayne County locations:
Official Lincoln Park Permit Links
| What you need | Official resource |
|---|---|
| Building Department | City Building Department |
| Online permits / inspections / records / fees | Lincoln Park BS&A |
| Building permit application | Building Permit PDF |
| Building permit fees | Building Fee Schedule |
| All forms | Forms & Applications |
| Zoning permit application | Residential Zoning Permit PDF |
| Resale inspection | Residential Inspection Prior to Sale |
| Local ordinances | Lincoln Park Code of Ordinances |
Frequently Asked Questions
1. Where is the Lincoln Park Michigan Building Department?
The Building Department is at 1355 Southfield Road, Lincoln Park, MI 48146. Published office hours are Monday through Friday from 8:00 a.m. to 4:00 p.m.
2. What is the Lincoln Park Building Department phone number?
The department’s published general contact is 313-386-1800 ext. 1299. Inspection requests can be left at extension 1284.
3. Can I apply for a Lincoln Park building permit online?
Yes. Lincoln Park uses BS&A Online for permit applications and other Building Department services. An application still must be reviewed and approved before work begins.
4. How much is a Lincoln Park building permit?
The City’s published building fee schedule starts at $115 for construction valued up to $1,000 and generally increases by $10 for each additional $1,000 or fraction. Plan-review and trade fees can be additional.
5. How do I schedule a building inspection in Lincoln Park?
You can use BS&A or call 313-386-1800 ext. 1284. Have the permit number, project address, inspection type and requested date ready. The City says calls received after 3:00 p.m. are scheduled for the following business day.
6. What days are electrical, plumbing and mechanical inspections performed?
The City currently publishes Monday and Wednesday from 8:00 a.m. to 1:00 p.m. for electrical, mechanical and plumbing inspections.
7. Do contractors have to register with Lincoln Park?
Lincoln Park publishes a contractor registration process. Its form lists a $15 registration fee and requests current license information, identification and liability-insurance documentation, along with additional trade-license information when applicable.
8. Does Lincoln Park require an inspection before selling a house?
Yes. The City requires an exterior inspection of residential dwellings before sale. The published resale inspection fee is $150 and includes the initial and follow-up inspection.
9. Does a fence require approval in Lincoln Park?
Fence work is regulated through the City’s zoning/building process. The City requires a survey or plot plan, post-hole inspection and final inspection, along with compliance with local height, setback and installation rules.
10. How long is a Lincoln Park building permit valid?
The City’s permit forms state that a permit becomes invalid if work does not begin within 180 days after issuance or if authorized work is suspended or abandoned for 180 days. Written extensions may be available from the Building Official when properly requested and justified.
Start With the Right Permit, Not the Construction
The easiest Lincoln Park permit process is the one checked before work starts. Identify whether the project needs a building, trade or zoning permit, prepare the property and contractor information, submit through the City’s current system, and wait for permit issuance before beginning regulated work.
Once construction starts, keep the permit number handy and schedule each required inspection before covering the work. For sales, rentals, vacant properties and business occupancies, remember that Lincoln Park also has local requirements beyond a normal construction permit.