Building Permits, Inspections and Local Construction Services in Burlington

The Town of Burlington Building Department reviews building permit applications, performs construction inspections and enforces the Massachusetts State Building Code and applicable local requirements within Burlington, Massachusetts.

Need to apply now? Building permit applications are submitted through Burlington’s official OpenGov permitting system. For most construction projects, the Town asks applicants to allow a minimum of two weeks for review and issuance, although complex projects can take longer.

Building Department 25 Center Street
Burlington, MA 01803
Main Phone 781-270-1615
Building permit assistance
Online Permitting OpenGov portal
Applications and permit records

Burlington Building Department Contact & Office Hours

Detail Published Information
Official office Town of Burlington Building Department
Address 25 Center Street, Burlington, MA 01803
Main phone 781-270-1615
Email building@burlington.org
Monday, Tuesday, Thursday 8:00 AM–4:30 PM
Wednesday 8:00 AM–7:00 PM
Friday 8:00 AM–1:00 PM

The Building Department is located at the Town Hall Annex at 25 Center Street. Do not confuse its published department hours with the general Town Hall hours shown elsewhere on the municipal website.

Which Projects Need a Building Permit?

Burlington states that most new construction, renovations and property improvements require a building permit before work begins. Electrical, plumbing, gas and sheet-metal work may also require their own permits and inspections.

Project What to Check in Burlington
New house or addition Building permit, construction plans, zoning compliance, site/plot plan and applicable trade permits.
Interior renovation Building permit when regulated construction is involved, plus electrical, plumbing, gas or mechanical permits where applicable.
Deck, garage or larger accessory structure Check building permit requirements and zoning setbacks before construction.
Small residential shed or gazebo Burlington states that qualifying residential accessory structures under 200 sq. ft. do not require a building permit, but zoning setbacks still apply.
Swimming pool Building/equipment requirements, certified plot plan, setbacks and electrical bonding permit requirements may apply.
Generator Location and setback requirements apply; submit the applicable equipment information and obtain necessary trade permits.
Commercial or other non-single-family project The Town states that Planning Board site-plan and/or special-permit approval is required before a building permit can be issued.
Flood-hazard-area development A separate Floodplain Development Permit may be required before the building permit application proceeds.
Important 200-square-foot rule: Burlington specifically states that residential accessory structures and uses such as sheds, play structures and gazebos under 200 square feet do not require a building permit. This does not remove zoning setback requirements or other approvals that may apply to the property.

How to Apply for a Burlington Building Permit Online

  1. Confirm that Burlington is the correct jurisdiction.
    Make sure the property is within the Town of Burlington and identify whether zoning, Planning Board, Conservation, floodplain or other approvals must be completed first.
  2. Define the full scope of work.
    List structural work and any electrical, plumbing, gas, sheet-metal or mechanical components so the correct permit categories can be identified.
  3. Prepare the plans and supporting documents.
    Gather construction plans, a plot or site plan when required, contractor licensing and insurance information, and any project-specific forms.
  4. Open Burlington’s official OpenGov portal.
    Go to burlingtonma.portal.opengov.com. Sign in or create an account if the application workflow requires one.
  5. Start the correct building permit application.
    Enter the property, owner, applicant, contractor and project information requested by the portal. Use a clear description of the proposed construction.
  6. Upload the required documents.
    Attach the plans, site information, licenses, insurance records and supporting approvals applicable to your project. Incomplete documentation can delay review.
  7. Submit and monitor the application.
    Save your application or record number. Check the portal and your email for plan-review comments, missing-document requests, corrections or fee notices.
  8. Pay the assessed fees and wait for issuance.
    Do not treat submission as approval. Begin permit-required work only after the permit has been issued and any prerequisite approvals are complete.
  9. Schedule inspections during construction.
    Keep approved documents available at the jobsite and arrange each required inspection before regulated work is concealed.
Published review time: Burlington asks applicants to allow a minimum of two weeks for review and issuance for most construction projects. Project size, complexity, missing documents, corrections and other departmental approvals can extend the process.

Documents to Prepare Before You Apply

The Town identifies the following items among the information that may be required for a complete building permit application:

  • Completed building permit application.
  • Construction drawings appropriate to the scope of work.
  • Plot plan or site plan when required.
  • Contractor license information.
  • Contractor insurance information.
  • Additional documents requested for the specific project.
  • Original stamped and signed plans for buildings or structures over 35,000 cubic feet.

Construction-control documents

Depending on the project, Burlington may require construction-control documentation prepared by a registered architect or engineer. The Town’s published construction-control requirements call for professional construction documents and periodic progress reports where applicable, followed by final construction-control certification at completion.

For projects using LVL or I-joist floor systems, Burlington states that stamped engineering documentation from the manufacturer or a registered design professional must be provided.

Changing contractors? Burlington states that a change in the general contractor during the application process or after permit issuance requires a new application. Additional fees may apply.

Burlington Building Permit Fees in 2026

The following amounts come from the Town’s Building Permit Fees as of August 2026. Project-specific charges can include more than one permit category, so use the table as a planning reference rather than a final invoice.

Permit / Service Published August 2026 Fee
Residential building permit $13 per $1,000; $50 minimum
Commercial building permit $13 per $1,000; $50 minimum
Electrical $13 per $1,000; $50 minimum
Electrical — new house up to 3,999 sq. ft. $400
Electrical — new house above 3,999 sq. ft. $600
Plumbing & gas $75 for first 3 fixtures; $20 per fixture above 3; $75 minimum
Sheet metal $13 per $1,000; $50 minimum
Sign $50 each
Above-ground swimming pool $50
In-ground swimming pool $13 per $1,000; $75 minimum
Demolition permit $1,000
Zoning determination $100
After-hours emergency inspection — weekday $400
After-hours emergency inspection — weekend $600

The Town’s one-page fee schedule does not establish the complete cost of every possible project. Separate trade permits, planning reviews or other approvals can affect the total.

How Building Inspections Work in Burlington

The Building Department performs inspections of permitted construction. The exact inspection sequence depends on the approved work. Do not cover structural, electrical, plumbing or other regulated work until the required inspection has been completed.

  1. Confirm your permit has been issued. Keep the permit number and property address available.
  2. Check the required inspection stage. Review your approved permit and plans before requesting an appointment.
  3. Contact the appropriate inspector or Building Department. Use the contact table below when the Town has not provided a project-specific scheduling method.
  4. Make the work accessible. Approved plans and required construction documents should be available for review.
  5. Resolve failed items before proceeding. Correct deficiencies and arrange any required reinspection before concealing the affected work.
  6. Obtain final approval. Burlington instructs permit holders to obtain final approval before occupying or using completed work where final approval is required.

Inspector contacts

Role Contact Published Office Hours
Inspector of Buildings — Martin Allan 781-270-1616 8:00–9:30 AM and 2:00–4:30 PM
Local Building Inspector — Malcolm Farrell 781-270-1820 8:00–9:30 AM and 2:00–4:30 PM
Inspector of Wires — Eric Sullivan 781-270-1753 8:00–9:30 AM and 3:00–4:30 PM
Plumbing & Gas Inspector — Steve Polizzotti 781-270-1618 8:00–9:30 AM and 2:00–4:30 PM
Scheduling note: The Town’s reviewed Building Department pages do not publish one universal inspection-request cutoff or guaranteed next-day inspection rule. Inspector office hours are not necessarily inspection appointment windows. Confirm the appointment directly rather than assuming a requested date is approved.

Building Codes Used in Burlington in 2026

For new 2026 building permit applications, Massachusetts’ 10th Edition State Building Code (780 CMR) is the current statewide building-code framework. The transition period allowing the 9th Edition ended June 30, 2025.

The 10th Edition uses Massachusetts-amended versions of the 2021 International Codes, including applicable building, residential, existing-building, mechanical, energy and related provisions.

Code Area 2026 Reference
State building code Massachusetts State Building Code, 780 CMR, 10th Edition
Residential construction Applicable 10th Edition Massachusetts residential provisions
Existing buildings Applicable Massachusetts amendments to the 2021 International Existing Building Code
Energy code Burlington is a Stretch Energy Code community
Electrical / plumbing / gas / fire Applicable Massachusetts regulations and local enforcement requirements

Burlington uses the Stretch Energy Code

Burlington adopted the Massachusetts Stretch Energy Code effective July 1, 2019. The Commonwealth’s 2026 municipal adoption information continues to identify Burlington as a Stretch Code municipality and does not list Burlington among municipalities with an effective Specialized Energy Code adoption.

For current projects, the Massachusetts Stretch framework uses applicable provisions of 225 CMR 22.00 for residential construction and 225 CMR 23.00 for commercial construction. Energy documentation should match the project type and the requirements effective when the permit is filed.

Local Rules That Can Affect Permit Approval

Planning Board approval

Burlington states that projects other than single-family dwellings require Planning Board approval through a Site Plan and/or Special Permit before the Building Department can issue the building permit.

Check zoning use, property setbacks and development requirements before completing expensive construction drawings.

Wetlands and conservation areas

If construction is near wetlands or another regulated conservation area, Burlington directs applicants to contact the Conservation Department before applying for the building permit. Wetlands, stormwater or other conservation approvals can be separate from the building permit.

Floodplain development

Development within a mapped Special Flood Hazard Area can require Burlington’s separate Floodplain Development Permit. The Town’s current form states that the floodplain process is separate from the building permit and is a prerequisite for building-permit application when development is in the Special Flood Hazard Area.

The floodplain application may require maps, an elevation certificate, floodproofing documentation, a no-rise certificate, wetlands approvals or professional certifications depending on the property and proposal. Final floodplain compliance approval may also be required before the development is occupied or used.

Pool and generator setbacks

Burlington’s equipment acknowledgement form requires a certified plot plan showing the proposed location of a pool or generator. The form states minimum setbacks of 15 feet from side and rear property lines and 25 feet from the front property line. Pool equipment such as filters, pumps, cabanas and heaters must also satisfy the stated lot-line requirements.

For pools, Burlington also states that a wiring permit is required for bonding and installation of electrical pool equipment.

Common Permit Problems and the Practical Next Step

Problem What to Do
Not sure whether a permit is required Call 781-270-1615 before purchasing materials or beginning construction.
Application is taking longer than expected Check OpenGov for missing documents, review comments or prerequisite Planning/Conservation approvals.
Contractor changed after filing Prepare for a new application; Burlington states that a general-contractor change requires one.
Small shed is under 200 sq. ft. Building permit may be exempt, but verify zoning setbacks and other property restrictions.
Property is near wetlands Contact Conservation before submitting the building permit application.
Property is in a flood zone Complete the separate floodplain review before relying on the building-permit process.
Cannot schedule an inspection online Call the Building Department or the applicable trade inspector; do not assume the portal is the only scheduling method.
Need formal zoning research Burlington publishes a Zoning Determination Letter Request; the listed fee is $100 per property.

Official Burlington Permit Resources

Related Building Permit Guides

For comparison with other permitting authorities and Massachusetts building departments, see:

Burlington Building Department FAQs

1. Where is the Burlington, Massachusetts Building Department?

The Building Department is at 25 Center Street, Burlington, MA 01803. The main telephone number is 781-270-1615.

2. Can I apply for a Burlington building permit online?

Yes. Burlington directs building permit applicants to its official OpenGov permitting portal at burlingtonma.portal.opengov.com. Prepare your property information, project description, plans and applicable contractor documents before beginning.

3. Does a shed under 200 square feet need a building permit in Burlington?

Burlington states that residential accessory structures and uses, including sheds, play structures and gazebos under 200 square feet, do not require a building permit. They must still comply with required property setbacks and other applicable rules.

4. How long does a Burlington building permit take?

The Town asks applicants to allow a minimum of two weeks for review and issuance for most construction projects. Complex projects, incomplete submissions, correction cycles and prerequisite approvals can take longer.

5. How much is a Burlington building permit in 2026?

The August 2026 schedule lists residential and commercial building permits at $13 per $1,000 with a $50 minimum. Other permits have separate charges, including electrical, plumbing/gas, pools, signs and demolition permits.

6. How do I schedule a building inspection in Burlington?

Use the Building Department or applicable inspector contact information associated with your permit. The Town’s reviewed public pages do not publish one universal inspection-request cutoff, so confirm the requested appointment directly before relying on a date.

7. Which building code does Burlington use in 2026?

Burlington enforces the Massachusetts State Building Code. For new 2026 applications, the current framework is the 10th Edition of 780 CMR, incorporating Massachusetts amendments to applicable 2021 International Codes.

8. Does Burlington use the Massachusetts Stretch Energy Code?

Yes. Burlington adopted the Stretch Energy Code effective July 1, 2019. The 2026 state adoption information identifies Burlington as a Stretch Code community and does not list it with a Specialized Code effective date.

9. Do commercial projects need Planning Board approval before a building permit?

Burlington states that projects other than single-family dwellings require Planning Board approval through a Site Plan and/or Special Permit before the building permit can be issued.

10. How can I search Burlington building permits by address?

Open Burlington’s official OpenGov permitting portal and use the available public-record search. Search by property address, permit/record number or another available field. For Burlington Mall records, note that 75 Middlesex Turnpike may also appear as 0 Burlington Mall.

Before You Start Construction

Confirm the exact permit type, zoning requirements, contractor documentation, project plans, applicable fees and required inspections before beginning work. For project-specific decisions, use the Burlington OpenGov application and Building Department at 781-270-1615.

Information reviewed: October 2026. USBuilding.org is an independent informational resource and is not affiliated with the Town of Burlington. Government forms, staff assignments, portal functions, fees and regulations can change; the responsible government authority controls official approvals.

Leave a Comment