Culver City Building Department 2026: Permits, Inspections & Services

Culver City, California · 2026 Permit Guide

Culver City Building Permits, Inspections & Permit Help

If you are remodeling a home, building an ADU, replacing a roof, upgrading an electrical panel, opening a commercial space, installing HVAC, or starting new construction in Culver City, the main office you will deal with is the Culver City Building Safety Division.

Building Safety handles permit applications, construction plan review, permit issuance, inspections, and permit records. The important part is knowing which permit you need, what documents to prepare, and which City review should happen before you spend money on construction.

Fast answer: Start with the City’s online permit process whenever possible. Culver City Building Safety can be reached at (310) 253-5800 and building.safety@culvercity.org. City Hall is at 9770 Culver Blvd, Culver City, CA 90232.
Building Safety (310) 253-5800
Inspection email building.safety@culvercity.org
City Hall 9770 Culver Blvd
Culver City, CA 90232
Online permit system Applications, documents, status, plan-check activity and records

Open the official Culver City Building Safety page

Visiting City Hall? The City lists regular City Hall hours as Monday through Friday, 7:30 AM to 5:30 PM, with closure on alternating Fridays. Building-permit document drop-off instructions use slightly different counter hours, so check the City’s current Friday schedule before making a special trip.

What the Culver City Building Safety Division Handles

What you need Best starting point
New building, addition or remodel Building permit application
Electrical panel, wiring or electrical equipment Electrical permit
HVAC, furnace, ventilation or mechanical equipment Mechanical permit
Water heater, fixtures, sewer, gas or plumbing work Plumbing permit
Demolition Building/Demolition application
Plan-check corrections Culver City Permit Portal
Permit or inspection status Permit Portal / My Records
Construction inspection Email Building Safety with permit and inspection details
Zoning, setbacks or land-use questions Planning Division before finalizing plans
Grading, drainage, driveway or right-of-way work Building Safety plus Public Works/Engineering as applicable

Do You Need a Building Permit in Culver City?

Culver City requires permits for construction, enlargement, alteration, repair, relocation, demolition and changes in occupancy. Permits are also required for many electrical, gas, mechanical and plumbing installations, replacements or alterations.

The City’s list is broad, so it is safer to check the exact scope rather than assuming a small project is exempt.

Common work that requires a permit

  • New homes and commercial buildings
  • Room additions
  • ADUs and garage conversions
  • Home remodels and alterations
  • Interior or exterior demolition
  • Re-roofing
  • New or replacement windows
  • New doors or enlarged door openings
  • Decks above grade
  • Patio covers, trellises and arbors
  • Patio or porch enclosures
  • Pools and spas
  • Retaining walls when permit thresholds are exceeded
  • Attached storage structures
  • Commercial tenant improvements
  • Electrical service-panel work
  • New outlets, wiring and many electrical alterations
  • Air-conditioning and heating systems
  • Water heaters
  • Gas piping
  • Sewer and water piping
  • Solar equipment

Check the City’s official permit-required list

Work That May Not Need a Building Safety Permit

Culver City’s published guidance also identifies some work that normally does not require a Building Safety permit. Examples include:

  • Cabinets and countertops
  • Carpet and other floor coverings
  • Interior or exterior painting
  • Minor drywall repair
  • Wall or floor tile
  • Landscaping that does not involve regulated sprinkler work
  • Some small detached storage sheds under 120 square feet
  • Certain low retaining walls on qualifying flat sites
  • Some wood or vinyl fences under the City’s Building Safety threshold
  • Stopping leaks or clearing clogs without replacing piping
  • Portable plug-in equipment and appliances
Important: “No Building Safety permit” does not mean “no City approval.” Planning, Engineering, Fire, zoning, right-of-way or other requirements can still apply. Culver City specifically notes that other departments may regulate work that is exempt from a Building Safety permit.

Check Planning Before Paying for Full Construction Plans

Building Safety checks construction-code compliance, but Planning handles issues such as zoning, setbacks, allowable uses, development standards and many exterior improvements.

This matters because a technically correct building plan can still require redesign if it does not meet zoning requirements.

For additions, ADUs, fences, commercial tenant changes and other site-related projects, checking zoning early can save both time and design fees.

Open Culver City Planning and Development

Documents to Prepare Before Applying

The exact submittal depends on your project. Preparing the basic information before opening the portal usually makes the first review much smoother.

  • Correct property address
  • Property-owner information
  • Applicant name, email and phone number
  • Clear description of the scope of work
  • Estimated construction valuation
  • Contractor information when applicable
  • California contractor-license details when applicable
  • Culver City business-license information when required
  • Architect, engineer or designer details when applicable
  • Site plan
  • Floor plans and elevations where needed
  • Structural plans and calculations where needed
  • Electrical, mechanical or plumbing plans for applicable work
  • Title 24 energy documents where applicable
  • CALGreen documentation where applicable
  • HOA documentation where applicable
  • Grant deed if ownership recently changed
  • Agent authorization when someone files for the owner
  • Project-specific forms requested by the City

How to Apply for a Culver City Building Permit Online

  1. Confirm the property is in Culver City’s jurisdiction.
    Do not rely only on a mailing address. Make sure the City of Culver City is actually the permitting authority.
  2. Define the complete scope of work.
    Include building, demolition, electrical, plumbing, mechanical, solar and other regulated work. This helps you identify every record type that may be required.
  3. Review the official Building Permit Application instructions.
    Check the document list before uploading anything.
    Culver City building permit instructions →
  4. Create or sign into your permit account.
    Use the City’s permit portal and enter your contact information carefully because plan-check notices and next steps are sent electronically.
    Open Culver City Permit Portal →
  5. Select the correct application type.
    Choose the appropriate Building, Electrical, Mechanical, Plumbing, Demolition or other permit record.
  6. Enter the property and project details.
    Use the exact job address, ownership information, valuation and scope. If the portal presents multiple property records, verify that you select the correct parcel.
  7. Upload required plans and supporting documents.
    Place documents in the requested portal area and make sure drawings are readable and complete.
  8. Submit and watch My Records.
    After submission, the record should appear in your account. Save the record number.
  9. Respond to the completeness review.
    Building Safety checks the application before full plan review. Complete applications move toward fee payment and routing; incomplete applications receive a list of missing items.
  10. Pay plan-check and permit fees when instructed.
    Do not assume that submitting an application means the permit has been issued.
The City says applicants can generally expect the initial completeness review response within about 2–3 business days. This is only the first application check, not final plan approval.

One Project Can Need Several Permit Records

Culver City’s current instructions state that a separate application and submittal is required for each structure and each applicable record type.

That means a substantial remodel might involve:

  • Building permit
  • Electrical permit
  • Mechanical permit
  • Plumbing permit
  • Demolition permit
  • Solar permit

Do not assume that an approved building permit automatically authorizes all trade work shown elsewhere in the project.

How Long Does Culver City Plan Check Take?

Once a complete application is accepted, required plan-check fees are paid and the project is routed, the City begins formal review.

Culver City’s current application instructions say a typical plan-check round takes approximately 20 business days. A qualifying expedited review is listed at approximately 10 business days.

More than one review round is common. When corrections are issued, respond to every comment and upload revised documents through the permit portal.

Things that commonly slow approval

  • Missing plans or forms
  • Incorrect property information
  • Unresolved zoning issues
  • Incomplete structural calculations
  • Missing energy or CALGreen documents
  • Changes to scope after plan review begins
  • Incomplete responses to correction comments
  • Planning, Public Works, Fire or other departmental reviews
  • Inactive contractor or business licenses at issuance

Culver City Building Permit Fees for 2026

The City’s current Fiscal Year 2026–27 Comprehensive Fee Schedule became effective July 1, 2026.

Building permits are not priced with one flat charge. The permit schedule uses construction valuation, and your total project cost can also include plan review, technology charges, trade permits, Planning fees, sewer fees, development impact fees, school fees or other project-specific charges.

Building project valuation FY 2026–27 adopted building-permit structure
Up to $500 $160.75
Starting at $501 $160.75 base + $5.25 for each additional $100 or fraction
Starting at $2,001 $241.25 base + $13.75 for each additional $1,000 or fraction
Starting at $25,001 $562.75 base + $22.50 for each additional $1,000 or fraction
Starting at $50,001 $1,125.75 base + $12.75 for each additional $1,000 or fraction
Starting at $100,001 $1,769.25 base + $9.00 for each additional $1,000 or fraction
Starting at $500,001 $5,468.50 base + $12.75 for each additional $1,000 or fraction
Starting at $1,000,001 $11,902.25 base + $10.50 for each additional $1,000 or fraction

The FY 2026–27 schedule also lists an additional plan-check fee of $160.75 per hour for revisions and addenda and a 5.44% technology fee per permit.

Use these figures for planning, not as a guaranteed project quote. Your permit invoice depends on the actual application.

Open the current Culver City fee schedule →

Permit-payment fraud warning: Culver City says it does not accept wire transfers for permit payments. City payment messages should come from an official @culvercity.org or @culvercity.gov address. Treat unexpected wire-payment requests as suspicious.

How to Schedule a Culver City Building Inspection

After the permit is issued and construction reaches an inspection stage, request the inspection by emailing:

building.safety@culvercity.org

Include:

  • Permit number
  • Job-site address
  • Inspection type
  • Any details the inspector needs
  • Requested inspection date
  • Inspection contact name
  • Contact phone number
Your preferred date is not automatically confirmed. The City sends a confirmation after the inspection has actually been scheduled.

Culver City also states that inspections may be conducted in person or, when appropriate, virtually through FaceTime or Cisco Webex.

Before requesting an inspection

  • Make sure the permit is issued, not merely submitted.
  • Keep the approved plans available as required.
  • Do not cover work that still needs inspection.
  • Provide safe access to the work area.
  • Finish correction items before requesting reinspection.
  • Have the site contact available when needed.

What Building Codes Apply in Culver City in 2026?

For qualifying permit applications in 2026, California uses the 2025 California Building Standards Code, Title 24. Culver City adopted local amendments to the 2025 code cycle in late 2025.

Depending on the project, the applicable standards can include:

  • 2025 California Building Code
  • 2025 California Residential Code
  • 2025 California Electrical Code
  • 2025 California Mechanical Code
  • 2025 California Plumbing Code
  • 2025 California Energy Code
  • 2025 California Green Building Standards Code
  • 2025 California Existing Building Code
  • Other applicable Title 24 parts and Culver City amendments

For a detailed statewide explanation, see our California Building Code 2026 guide.

Do not design only from a general California code summary. Local Culver City amendments and project-specific Planning, Fire, Engineering or site requirements can change what is needed.

Construction Hours in Culver City

Culver City’s published enforcement guidance allows construction activity during these general hours:

  • Monday–Friday: 8:00 AM–8:00 PM
  • Saturday: 9:00 AM–7:00 PM
  • Sunday: 10:00 AM–7:00 PM

A project development agreement or project-specific condition may establish different requirements, so large development projects should also review their approvals.

ADU Permits in Culver City

Culver City provides an ADU handbook and a pre-approved ADU plan program. The City’s pre-approved options include studio, one-bedroom and two-bedroom layouts in several architectural styles.

The pre-approved plan program can reduce design work, but it does not eliminate the permit process. The property still needs a site-specific plan, required project information, applicable reviews, plan-check fees and an issued building permit before construction.

The City currently publishes plan options including:

  • 468-square-foot studio
  • 637-square-foot one-bedroom design
  • Two-bedroom pre-approved option

Open the official Culver City ADU resources →

Solar and Battery Storage Permits

In 2026 Culver City launched an expedited residential solar and energy-storage permitting process using Symbium.

Eligible residential solar or battery projects can receive automated plan review and, after required fees are paid, permit issuance through the streamlined system.

The City’s current guidance says qualifying contractors include holders of A, B, C-10 or C-46 licenses.

Projects that do not qualify for the instant process can still use the City’s alternative electrical-permit process.

Check Culver City’s expedited solar and battery permit process →

EV Charger Permits

Culver City also provides a permit pathway for electric vehicle charging equipment at residential and non-residential properties.

Start by checking whether the installation qualifies for the City’s streamlined expedited EVSE process. If it does not, follow the regular electrical-permit requirements.

Open the official EV charger permit page →

How to Check a Culver City Permit or Permit History

  1. Open the Culver City Permit Portal.
  2. Search using the available property or permit information.
  3. If you submitted the application, sign in and open My Records.
  4. Review the record status and available permit activity.
  5. Check plan-review or inspection information associated with the record.
  6. If an older record is not available online, contact Building Safety and ask how to obtain the permit history.

Checking permit history is useful before buying or remodeling a property because an unfinished permit or undocumented alteration can become your problem later.

Permit Issuance and Final Approval

Before Culver City issues a permit, applicable contractor and City business licenses must be active and required permit fees must be paid.

Once the permit is issued, the City’s current instructions tell applicants to begin construction within one year of issuance.

At the end of the project, do not stop after the physical work is finished. Make sure you:

  • Complete every required inspection
  • Correct outstanding inspection items
  • Resolve conditions of approval
  • Pay remaining fees
  • Obtain final permit approval
  • Request a Certificate of Occupancy when the project requires one

For new development and changes of occupancy requiring a Certificate of Occupancy, the City’s permit instructions direct applicants to Building Safety after the required inspections and approvals are complete.

Before You Start: Simple Culver City Permit Checklist

  • Confirm the property is inside Culver City’s jurisdiction.
  • Check zoning before paying for final plans.
  • Identify every permit record required for the project.
  • Use the 2025 California code cycle and Culver City local amendments for applicable 2026 permits.
  • Prepare owner, contractor and design-professional information.
  • Collect required plans, calculations and forms.
  • Submit through the current permit portal.
  • Respond completely to correction comments.
  • Wait for actual permit issuance before beginning regulated work.
  • Schedule inspections before concealing work.
  • Get final approval before treating the permit as complete.

Related California Permit Guides

Building rules change by jurisdiction. If your project is elsewhere in Southern California, these guides may help:

Culver City Building Department FAQs

1. Where is the Culver City Building Department?

Building permit services are handled by the Culver City Building Safety Division at City Hall, 9770 Culver Blvd, Culver City, CA 90232. The main Building Safety phone number is (310) 253-5800.

2. Can I apply for a Culver City building permit online?

Yes. Culver City uses an online permit portal for building and trade permit activity. Applicants can submit records, upload documents, follow plan-check activity and review permit status online.

3. Do I need a permit for a remodel in Culver City?

Most remodels involving structural work, walls, windows, electrical systems, plumbing, HVAC or other regulated construction require one or more permits. Purely cosmetic work may be exempt, depending on the scope.

4. Does Culver City require a permit for a roof replacement?

Yes. Re-roofing is included on Culver City’s published list of work requiring a Building Safety permit.

5. How long does Culver City plan check take?

The City’s current building-permit instructions describe a typical plan-check round as approximately 20 business days. Qualifying expedited reviews are listed at approximately 10 business days. Multiple review rounds may be necessary.

6. How do I schedule a Culver City building inspection?

Email building.safety@culvercity.org with the permit number, site address, inspection type, requested date, contact name, phone number and any information the inspector needs. Wait for confirmation because the requested date is not guaranteed.

7. What building code does Culver City use in 2026?

For applicable 2026 permit applications, Culver City uses the 2025 California Building Standards Code cycle together with local Culver City amendments.

8. How much does a Culver City building permit cost?

There is no single flat building-permit price. Culver City’s FY 2026–27 schedule uses project valuation for building-permit fees, and projects may also include plan-check, technology, trade, development, sewer, Planning or other charges.

9. Are electrical, mechanical and plumbing permits separate?

Yes. Culver City’s current application instructions require separate applications and submittals for each applicable record type, including Building, Electrical, Mechanical, Plumbing, Demolition and Solar.

10. How can I look up an old Culver City building permit?

Start with the Culver City Permit Portal and search using the available property or permit details. For records that are not available online, contact Building Safety at (310) 253-5800 for help locating permit history.

Final practical tip: Use this page to prepare the project, documents, fees and inspection information first. Then use the official Culver City website or permit portal only for the live application, payment, plan submission, inspection scheduling or project-specific determination.

USBuilding.org is an independent informational resource and is not affiliated with the City of Culver City. Final permit, code and project determinations are made by the responsible government agency.