DeBary Building Department 2026: Permits, Inspections & Services

DeBary Building Permits & Inspections: What to Do in 2026

If you are building, remodeling, replacing a roof, installing HVAC, doing electrical or plumbing work, adding a shed, or trying to close an old permit in DeBary, the City of DeBary Building Department is the place to start. The city uses an online Citizenserve system for permit applications, status checks, payments and inspection scheduling.

Quick answer: For building-permit help, call 386-601-0212. The Building Department is located at DeBary City Hall, 16 Colomba Road, DeBary, FL 32713. You can apply, check a permit, pay fees and schedule inspections through the city’s online permit system.
Building Official Mark Grenier
386-601-0212
buildingofficial@debary.org
Permit Technicians Annette Bland: 386-601-0212
Tina Hill: 386-601-0211
Office Address DeBary City Hall
16 Colomba Road
DeBary, FL 32713
City Hall Hours Monday–Friday
8:30 AM–5:00 PM
Closed on city holidays

The current city Building page lists City Hall’s general public hours. If you need an in-person permit-counter service at a particular time, calling 386-601-0212 before traveling is a sensible extra step.

What the DeBary Building Department Handles

The City contracts with PDCS, LLC for building-code administration, plan review, inspections and permit-support services. Plans may be reviewed for structural, plumbing, electrical, mechanical/HVAC and Florida product-approval compliance.

Common work handled through building permitting includes re-roofing, demolition, sheds, electrical work, HVAC/mechanical work, plumbing and other residential or commercial construction. New homes, additions and substantial alterations normally involve a more detailed plan review.

Project Where to Start Important 2026 Note
New house or addition Building Department + applicable Planning/Zoning review Plans, survey, product approvals and other supporting documents may be required.
Roof replacement Building permit Roofing is structural/cladding-related work and is not covered by the new under-$7,500 exemption.
Electrical, plumbing, gas or HVAC Building Department These trades remain permit-controlled even when the job costs less than $7,500.
Window or exterior-door replacement Building Department Florida product approval and wind-pressure requirements can apply.
Fence Planning & Zoning / Citizenserve A qualifying small residential project may avoid a building permit, but zoning clearance is still required.
Small shed Confirm with Planning & Zoning and Building The city’s HB 803 guidance identifies small sheds of 120 sq. ft. or less as potentially non-structural for exemption purposes, while still requiring zoning clearance.
Sign Planning & Zoning The Building page directs sign-permit questions to Planning & Zoning.
Tree removal Planning & Zoning Tree-preservation rules can affect residential construction before clearing begins.
Do not assume that a small project automatically needs no permit. Florida law changed on July 1, 2026, but the exemption has specific limits. Zoning, drainage, floodplain, easement, setback, product-approval and trade-permit requirements can still apply.

Major 2026 Change: Residential Work Under $7,500

Florida’s HB 803 changed Section 553.79 of the Florida Statutes effective July 1, 2026. DeBary now provides a formal permit-exemption process for qualifying work on a single-family dwelling when the complete project is valued at less than $7,500.

This is not a blanket exemption.

Work that is not eligible for the under-$7,500 exemption

  • Electrical work
  • Plumbing work
  • Mechanical/HVAC work
  • Gas work
  • Structural work
  • Work on property partially or entirely within a flood hazard area as defined by the Florida Building Code

DeBary’s guidance explains that structural work includes items such as exterior window and door replacements, exterior siding, re-roofing, screen enclosures, accessory structures and other work involving the building’s wind-force-resisting or load-bearing systems.

Examples DeBary identifies as non-structural

  • Painting
  • Flooring or tile work that does not involve a shower pan
  • Cabinet replacement that does not involve plumbing or electrical work
  • Drywall replacement
  • Fences, although zoning clearance is still required
  • Small sheds of 120 square feet or less, with zoning clearance still required
You cannot split one project into smaller jobs to stay below $7,500. The exemption applies to the complete project. DeBary’s exemption form specifically requires the applicant to state that the project will not be phased or subdivided to avoid permitting.

How to request the exemption

  1. Confirm the type of work. Make sure the project is genuinely non-structural and does not contain electrical, plumbing, mechanical or gas work.
  2. Check the flood status. A property in a qualifying flood hazard area does not receive this exemption.
  3. Calculate the entire project value. The complete project must be valued at less than $7,500.
  4. Prepare proof of the work and value. DeBary requires a written contract or other documentation showing the nature and value of the work.
  5. Complete the city’s Permit Exemption Request. Fill in the property, applicant and project information and attach the required documentation.
  6. Submit the request before relying on the exemption. The city’s current form states that exempt work should not begin before the request is submitted and accepted.

How to Apply for a DeBary Building Permit Online

DeBary uses Citizenserve for building permits, planning and zoning services, permit status, payments and inspections. You can handle most of the process online instead of making repeated trips to City Hall.

  1. Open the official permit portal. Use the City of DeBary permits page or Citizenserve.
  2. Create an account if you are submitting an application. Use an email address you check regularly because review comments and status changes may be connected to the account.
  3. Select the correct permit type. Do not choose a similar permit just to move forward faster. Fence, sign, planning and building permits can follow different review paths.
  4. Enter the property information carefully. Use the actual project address and parcel details where requested.
  5. Describe the full scope of work. Include all related construction rather than describing only one part of a larger project.
  6. Add the contractor information. If you are using an owner-builder exemption, prepare the city’s owner-builder paperwork instead.
  7. Upload the required plans and forms. Your project may need a survey, plans, engineering, product approvals, Notice of Commencement, stormwater paperwork or other documents.
  8. Pay the required application fee. Residential and commercial applications have different published application fees.
  9. Watch the portal for review comments. If corrections are requested, answer each comment and upload revised documents through the correct revision process.
  10. Wait for permit issuance before beginning regulated work. Approval of a planning item or submission of an application does not by itself authorize construction.

Documents to Prepare Before You Submit

The exact documents depend on the project. For a new residential building, DeBary’s published checklist is much more detailed than a simple application form.

Common new-construction items include:

  • Power of Attorney when someone other than the license holder is processing the permit
  • Owner-Builder Statement when the homeowner is pulling the permit
  • Legal-description or Property Appraiser information
  • Survey showing the building, setbacks, easements, lot dimensions, drainage, driveway access, wetlands and other site conditions
  • Electronically signed and sealed construction drawings when required
  • Florida Product Approvals or applicable Miami-Dade NOAs for windows, doors, roofing and other regulated components
  • HVAC Manual J information and related mechanical documentation
  • Recorded Notice of Commencement when applicable
  • Septic/well approvals when applicable
  • Stormwater and tree-removal approvals when the site requires them

The construction drawings may need foundation information, floor plans, room uses and sizes, elevations, electrical layouts, plumbing locations, mechanical equipment, gas details, engineering, energy calculations, wind-design information, door/window schedules, lintels and structural connectors.

DeBary Building Permit Fees

The City Building page identifies its current fee schedule as effective August 1, 2024. That schedule remains the fee schedule linked by the department in 2026.

Every permit type is subject to a published application fee:

Fee Type Published Amount
Residential permit application fee $50
Commercial permit application fee $100
Group I permit fee $75
Group II permit fee $150
Group III permit fee $250
Residential revision fee $75
Commercial revision fee $250
First reinspection $40
Second reinspection $75
Third and later reinspection Published schedule lists 4 × $75
After-hours inspection $150 per hour, two-hour minimum
Open/active permit extension $100 for a maximum 90-day extension

Examples of permits in the city’s flat-fee groups

Group I — $75: the published schedule includes examples such as residential decks, driveways, fences, air-conditioning change-outs, residential water heaters, certain electrical/plumbing repairs, residential siding, smaller storage sheds and window/exterior-door replacement.

Group II — $150: examples include residential re-roof permits, certain signs, commercial early-start permits and temporary construction trailers.

Group III — $250: examples include mobile homes, billboards, certain non-residential plan revisions and storage buildings over 200 square feet.

New single-family residential fees

House Size Published Permit Fee Published Plan Review Fee
Under 2,500 sq. ft. $1,900 $665
2,500–4,000 sq. ft. $2,700 $945
4,001–6,000 sq. ft. $4,100 $1,435
6,001 sq. ft. and larger $6,000 $2,100

Other residential, commercial, industrial, multifamily, alteration, pool, screen-enclosure, solar, demolition and similar permit fees may be calculated using project valuation. State-required surcharges and other project-specific charges can also apply.

Starting work without the required permit can get expensive. DeBary’s published fee schedule states that work started without a permit is subject to a $100 administrative fee and the permit fee is doubled.

How to Schedule a Building Inspection

Once the permit is issued and the project reaches a required inspection stage, do not cover the work until the necessary inspection has been completed.

  1. Find your permit. Have the permit number, project address and inspection type ready.
  2. Open Citizenserve. Sign in to the account associated with the permit when required.
  3. Open the permit record. Confirm that the permit is issued and that no unresolved condition is blocking inspections.
  4. Select the inspection option. Choose the exact inspection stage that is ready.
  5. Submit the request. Review the requested date and any notes before confirming.
  6. If online scheduling is not working, call 386-601-0212. The city expressly allows inspection scheduling by phone.
  7. Leave the work accessible. Keep the approved permit documents available and do not conceal work that needs inspection.

The required inspection sequence depends on the permit. A new building may involve foundation, framing, electrical, plumbing, mechanical and final inspections. A roof permit follows a different sequence.

Residential re-roof inspections

DeBary’s contractor re-roof instructions require an in-progress inspection and a final inspection for the covered residential roof-deck condition. For the in-progress inspection, existing roofing must be removed, dry-in components must be installed, required flashing areas must remain visible, and specified documentation must be available. The roof must be complete and construction debris removed for the final inspection.

How to Search a DeBary Building Permit

You do not have to call the department every time you want to check an application. Citizenserve includes permit-search and permit-status functions.

  1. Open the DeBary Citizenserve portal.
  2. Choose the Search option.
  3. Select the permit or building-record search available in the portal.
  4. Enter the permit number when you have it. Otherwise, use the available property or address fields.
  5. Open the matching record.
  6. Review the available status, permit details and inspection activity.

If you need a document that is not available through the permit record, the City also accepts public-record requests. For building-permit information, however, the City specifically directs users to the permit portal first.

Readers researching permit-record systems elsewhere in Florida may also find our Brevard County permit search guide useful, but DeBary permits must be searched through DeBary’s own system.

Owner-Builder Permits in DeBary

A qualifying Florida property owner may act as an owner-builder, but this is not simply a way to avoid hiring a licensed contractor. The owner becomes the responsible party of record and accepts important legal, financial and supervision duties.

DeBary’s owner-builder affidavit states that the owner must directly supervise the work and cannot use the owner-builder exemption as a way for an unlicensed person to act as the real contractor.

The city’s form also explains that qualifying owner-builders may construct or improve a one-family or two-family residence for their own use or occupancy, subject to Florida law and the restrictions described in the disclosure.

Be careful with “contractors” who tell you to pull the permit yourself. If someone else is actually controlling the project, an owner-builder permit can expose the property owner to licensing, insurance, workers’ compensation and financial risks.

Notice of Commencement: When It Matters

Florida’s Construction Lien Law can require a recorded Notice of Commencement for qualifying construction. Under current Florida law, when the direct contract is greater than $5,000, the permitting authority generally must receive the required Notice of Commencement information before the first inspection can move forward.

This is why DeBary’s new-construction and re-roof checklists commonly reference a recorded Notice of Commencement.

Practical sequence:

  1. Complete the Notice of Commencement with the correct owner, contractor and property information.
  2. Record it with the appropriate Volusia County recording office when required.
  3. Post or maintain the required copy at the project site.
  4. Provide the recording information to the permitting authority before the inspection stage required by Florida law.

Do not record a Notice of Commencement unnecessarily far in advance without understanding the legal effect. If financing is involved or ownership is complicated, ask the lender, title professional or attorney how the lien-law requirements apply to your project.

Stormwater, Drainage and New Residential Construction

Building approval is not always the only approval needed. DeBary’s residential permit checklist states that a stormwater-management application is required for certain new homes outside a PUD.

The city’s published Residential Stormwater Application lists a $400 residential stormwater permit fee and a $600 commercial fee, with additional fees potentially applicable.

For applicable residential construction, the city may review:

  • Drainage patterns
  • Retention areas
  • Erosion-control measures
  • Driveway drainage
  • Finished-floor elevation
  • Easements
  • Wetlands and setbacks
  • Existing and proposed structures

A final stormwater-related approval may be necessary before a Certificate of Occupancy is issued for the applicable structure.

Fence, Sign and Development Permits

Not every approval is handled as an ordinary building permit. The Building Department directs certain development permits to Planning & Zoning.

Question Current Contact
Fence / development permit questions Michael Lopez — 386-601-0210 — mlopez@debary.org
Sign permit questions Merylene Thomas — 386-601-0204 — mthomas@debary.org
General Planning & Zoning Growth Management / Planning & Zoning

A fence is a good example of why “no building permit” does not necessarily mean “no city approval.” Under DeBary’s 2026 HB 803 guidance, some fence work may qualify as non-structural, but zoning clearance is still required.

Which Florida Building Code Applies in DeBary in 2026?

As of October 2026, the statewide effective code is the Florida Building Code, 8th Edition (2023), which became effective December 31, 2023.

Florida is transitioning to the 9th Edition (2026). The Florida Building Commission’s published workplan schedules the 9th Edition to become effective on December 31, 2026.

Late-2026 projects need extra care. A project submitted around the code-change date can be affected by application timing and the effective code. Check the current Florida Building Commission information and DeBary’s requirements before finalizing plans.

Florida jurisdictions can also have different administrative processes and local requirements. For comparison, see our Broward County building-permit guide; the statewide code may be shared, but the local permit authority and workflow are not.

Florida Permit Review Timeframes

Florida law establishes review timeframes for complete and sufficient permit applications. The exact statutory period depends on the project type, size and review method.

For example, the 2026 statute provides a five-business-day timeframe for certain permits on an existing single-family home valued under $15,000 when a local-government plans reviewer is used, and longer statutory periods for other residential, commercial and larger projects.

DeBary’s Citizenserve portal also notes that its applicable building-permit timeline begins after required Planning & Zoning, Environmental and Engineering approvals are received.

A statutory review period is not the same as a promise that every permit will be issued within that many days. An incomplete application, missing prerequisite approval, correction request or applicant delay can change the practical timeline.

Common Reasons a DeBary Permit Gets Delayed

  • The wrong permit type was selected.
  • The project description does not include the complete scope of work.
  • A required survey or site plan is missing.
  • Construction drawings are incomplete.
  • Required engineering is not electronically signed or sealed.
  • Florida Product Approval information is missing.
  • A Planning, Zoning, Environmental or Engineering approval is still pending.
  • Stormwater, tree-removal, septic/well or floodplain information is missing.
  • Review comments were not answered completely.
  • A required Notice of Commencement has not been provided before the inspection stage where it becomes necessary.

It is usually faster to spend an extra few minutes checking the city’s project-specific documents before submission than to upload a bare application and wait for a correction notice.

Before You Start Work: A Practical DeBary Checklist

  1. Confirm that the property is actually within the City of DeBary permitting jurisdiction.
  2. Define the entire project, including electrical, plumbing, mechanical and structural work.
  3. Determine whether HB 803 changes the permit requirement for your particular residential project.
  4. Check zoning, setbacks, flood status, drainage and easements before buying materials for exterior work.
  5. Choose the correct permit type in Citizenserve.
  6. Collect the survey, plans, engineering, product approvals and project forms that apply.
  7. Submit the permit and pay the required application fee.
  8. Respond to review comments promptly.
  9. Wait for permit issuance before beginning regulated construction.
  10. Schedule each inspection before the work is concealed.
  11. Complete the final inspection and any Certificate of Completion or Occupancy process that applies.

If your property is elsewhere in Florida, use the building authority for that location rather than DeBary. We also maintain guides for the Brevard County Building Department and the Boca Raton Building Department, where the permit systems and local procedures are different.

Frequently Asked Questions

1. What is the DeBary Building Department phone number?

The main Building Department number is 386-601-0212. Building Official Mark Grenier and Permit Technician Annette Bland are listed at that number.

2. Where is the DeBary Building Department?

The department is located at DeBary City Hall, 16 Colomba Road, DeBary, Florida 32713.

3. Can I apply for a DeBary building permit online?

Yes. DeBary uses Citizenserve for building-permit applications, status tracking, fee payments and inspection scheduling.

4. How do I schedule a building inspection in DeBary?

Schedule through the Citizenserve permit system or call the Building Department at 386-601-0212. Have the permit number, project address and required inspection type ready.

5. How do I search for a DeBary building permit?

Open the City’s Citizenserve system, select the Search function and search the available permit records using the permit number or available property information. Open the permit record to review its available status and inspection information.

6. Do I need a permit for work under $7,500 in DeBary?

Not always. Starting July 1, 2026, qualifying non-structural work on a single-family dwelling valued at less than $7,500 can qualify for an exemption after the required written request is submitted. Electrical, plumbing, mechanical, gas, structural and qualifying flood-hazard-area work are excluded from the exemption.

7. Does a fence need a permit in DeBary?

A qualifying fence project may not require an ordinary building permit under the 2026 residential exemption, but DeBary expressly states that a zoning clearance is still required. Start with Planning & Zoning rather than assuming no approval is needed.

8. How much is a DeBary building permit?

The cost depends on the project. The city’s current published schedule lists a $50 residential application fee and a $100 commercial application fee, plus the applicable permit, plan-review, state surcharge and other project-specific fees. Some permits use flat fee groups while larger projects may use valuation-based charges.

9. Can a homeowner pull their own permit in DeBary?

Qualifying owners may use Florida’s owner-builder exemption, but they become legally and financially responsible for the work and must comply with the restrictions in the DeBary Owner-Builder Statement. Do not pull an owner-builder permit simply because an unlicensed person asks you to.

10. What building code does DeBary use in 2026?

For most of 2026, Florida uses the Florida Building Code, 8th Edition (2023). The Florida Building Commission schedules the 9th Edition (2026) to become effective December 31, 2026, so projects near the end of the year should confirm the applicable code before submission.

Best final step: Once you know your project type and have the required documents ready, use the City of DeBary’s official portal to submit the application, pay the required fees or schedule the inspection. For a project-specific requirement that is still unclear, call 386-601-0212 before starting work.

Information reviewed: October 24, 2026. USBuilding.org is an independent informational resource and is not operated by the City of DeBary. Permit requirements, fees, forms, staff, code editions and procedures can change. The responsible government agency controls the final requirement for a specific property and project.

Leave a Comment